[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913678":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},913678,589,1,"单选题","根据《工程测量规范》（GB50026—2007），对于GPS-RTK测图，流动站的作业应符合下列规定：流动站作业的有效卫星数不宜少于()个，PDOP值应小于6，并应采用固定解成果。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":14},"B","4",{"key":19,"text":20,"correct":21},"C","5",true,{"key":23,"text":24,"correct":14},"D","6","根据《工程测量规范》(GB50026—2007)第5.3.15条，对于GPS-RTK测图，流动站的作业应符合下列规定：流动站作业的有效卫星数不宜少于5个，PDOP值应小于6，并应采用固定解成果。故选C。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]