[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913669":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},913669,589,1,"单选题","竣工总图的编绘，应收集众多资料。下列选项中，不属于竣工总图编绘应收集资料范畴的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工设计图",false,{"key":16,"text":17,"correct":14},"B","施工检测记录",{"key":19,"text":20,"correct":21},"C","建筑物立面图",true,{"key":23,"text":24,"correct":14},"D","竣工测量资料","《工程测量规范》(GB50026—2007)第9.2.1条规定竣工总图的编绘，应收集下列资料：①总平面布置图；②施工设计图；③设计变更文件；④施工检测记录；⑤竣工测量资料；⑥其他相关资料。故选C。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]