[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913664":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},913664,589,1,"单选题","图根点相对于基本控制点的点位中误差不应超过图上±0.1mm，高程中误差不应超过基本等高距的()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","1\u002F2",false,{"key":16,"text":17,"correct":14},"B","1\u002F3",{"key":19,"text":20,"correct":14},"C","1\u002F5",{"key":22,"text":23,"correct":24},"D","1\u002F10",true,"本题考核图根点的精度要求。根据现行《工程测量规范》(GB50026—2007)，图根点相对于基本控制点的点位中误差不应超过图上±0.1mm，高程中误差不应超过基本等高距的1\u002F10。故选D。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]