[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913508":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},913508,589,1,"单选题","（2011 年） GIS 工程项目在设计阶段， 需要进行需求分析。 下列关于需求分析的说法，正确的是（） 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","需求分析报告要获得用户认可",true,{"key":16,"text":17,"correct":18},"B","系统需求是用户提出的要求",false,{"key":20,"text":21,"correct":18},"C","用户可以不参与需求分析过程",{"key":23,"text":24,"correct":18},"D","不是所有的项目都需要需求分析","",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]