[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913216":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},913216,589,1,"单选题","（2011 年） 建筑物沉降观测中， 基准点数至少应有（） 个。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","2",{"key":19,"text":20,"correct":21},"C","3",true,{"key":23,"text":24,"correct":14},"D","4","本节 2.3 中的内容。 基准点是变形监测的基准， 应布设在变形影响区域外稳固可靠的位置。 每个工程至少应布设 3 个基准点。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]