[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913208":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},913208,589,1,"单选题","（2015） 隧道施工控制网的主要作用是（） 。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","控制隧道的长度",false,{"key":16,"text":17,"correct":14},"B","测量隧道断面尺寸",{"key":19,"text":20,"correct":14},"C","变形监测",{"key":22,"text":23,"correct":24},"D","保证隧道准确贯通",true,"1.4 中的内容。 隧道施工测量的主要任务是保证洞内各项建（构） 筑物以规定的精度按照设计位置修建， 保证各开挖工作面按照规定的精度在预定位置贯通。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]