[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913180":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},913180,589,1,"单选题","（2011 年） 地形测图时， 图根水准测量起算点的精度不应低于（） 的精度。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","等外水准点",false,{"key":16,"text":17,"correct":14},"B","一级导线点",{"key":19,"text":20,"correct":21},"C","四等水准点",true,{"key":23,"text":24,"correct":14},"D","三等水准点","根据本节3.2中的内容，图根高程控制通常采用图根水准、图根三角高程导线等方法施测，起算点的精度不应低于四等水准高程点，得出答案。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]