[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913121":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},913121,589,1,"单选题","（2013 年） 一、 二等导线测量中， 同时间段经气象改正后的距离值测回互差限差为（ ）mm。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","±5",false,{"key":16,"text":17,"correct":14},"B","±10",{"key":19,"text":20,"correct":14},"C","±15",{"key":22,"text":23,"correct":24},"D","±20",true,"见表1.2.5。",{"id":6,"name":27,"category":28,"favorite":29},"测绘综合能力","建筑工程",0]