[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-588-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},588,"测绘管理与法律法规","建筑工程",0,3,50,2039,[13,34,46,58,70,82,94,106,117,129,141,153,165,177,189,201,213,225,237,249,258,270,282,294,306,318,330,340,352,364,376,388,400,412,423,432,440,449,458,470,482,494,506,518,527,536,547,559,569,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},911062,1,"单选题","（2012年）下列内容中，表示测绘内容的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","质量标准",false,{"key":24,"text":25,"correct":22},"B","测绘数量",{"key":27,"text":28,"correct":29},"C","测绘成果种类",true,{"key":31,"text":32,"correct":22},"D","技术依据","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},911063,"（2013年）根据合同法，合同当事人既约定违约金，又约定定金的，一方违约时，对方可以（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"适用违约金条款",{"key":24,"text":41,"correct":22},"适用定金条款",{"key":27,"text":43,"correct":29},"选择适用违约金或定金条款",{"key":31,"text":45,"correct":22},"一并适用违约金和定金条款",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},911064,"（2014年）根据合同法，当事人采用合同书形式订立书面合同的，自（ ）时合同成立。",[50,52,54,56],{"key":20,"text":51,"correct":22},"双方当事人制作合同书",{"key":24,"text":53,"correct":22},"双方当事人表示受合同约束",{"key":27,"text":55,"correct":29},"双方当事人签字、 盖章",{"key":31,"text":57,"correct":22},"双方当事人达成一致意见",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},911065,"（2015年）甲、乙测绘公司约定采用合同书形式订立测绘项目合同，但在合同签字盖章前，乙方已经履行了主要义务，甲也接受了测绘成果。根据合同法，甲、乙公司之间的测绘项目合同（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"可变更",{"key":24,"text":65,"correct":22},"可撤销",{"key":27,"text":67,"correct":29},"成立",{"key":31,"text":69,"correct":22},"无效",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},911066,"（2011年）关于当事人订立合同形式的说法，错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"订立合同可以采取书面形式",{"key":24,"text":77,"correct":29},"订立合同必须采取书面形式",{"key":27,"text":79,"correct":22},"订立合同可以采用口头形式",{"key":31,"text":81,"correct":22},"法律规定采用书面形式的应当采用书面形式",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},911067,"（2011年）关于订立国家订货任务合同的说法，符合合同法规定的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"甲乙双方自主确定合同内容",{"key":24,"text":89,"correct":29},"依照有关法律， 行政法规的权利和义务订立合同",{"key":27,"text":91,"correct":22},"有关行政主管部门直接下达订货任务",{"key":31,"text":93,"correct":22},"以国家订货任务的组织方式的要求确定合同内容",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},911068,"（2012年）合同的权利义务，除法律规定的以外，主要由（ ）确定。",[98,100,102,104],{"key":20,"text":99,"correct":29},"合同的条款",{"key":24,"text":101,"correct":22},"双方口头说明",{"key":27,"text":103,"correct":22},"双方的意愿",{"key":31,"text":105,"correct":22},"私下协议",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},911069,"（2012年）下面内容中表示测绘范围的是（ ）。",[110,111,113,115],{"key":20,"text":25,"correct":22},{"key":24,"text":112,"correct":29},"测区边界",{"key":27,"text":114,"correct":22},"测绘目的",{"key":31,"text":116,"correct":22},"测区条件",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},911070,"（2012年）合同中，甲方应尽的义务中，下列说法正确的是（ ）",[121,123,125,127],{"key":20,"text":122,"correct":29},"对乙方提交的技术设计书进行审定",{"key":24,"text":124,"correct":22},"对乙方的项目参与人员进行审定",{"key":27,"text":126,"correct":22},"对乙方进行项目监理",{"key":31,"text":128,"correct":22},"对项目实施进行进度安排",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},911071,"（2012年）缔约过失责任指当事人在订立合同过程中，因违背（ ）而给对方造成损失的赔偿责任。",[133,135,137,139],{"key":20,"text":134,"correct":22},"遵守法律和不得损害社会公共利益的原则",{"key":24,"text":136,"correct":22},"自愿的原则",{"key":27,"text":138,"correct":22},"公平的原则",{"key":31,"text":140,"correct":29},"诚实信用原则",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},911072,"（2013年）按照《测绘合同》示范文本，乙方向甲方交付全部测绘成果的时间是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"测绘生产工作完成后",{"key":24,"text":148,"correct":22},"测绘成果验收通过后",{"key":27,"text":150,"correct":22},"测绘成果整理结束后",{"key":31,"text":152,"correct":29},"测绘工程费结清后",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},911073,"（2014年）根据《测绘合同》示范文本，下列关于测绘合同的说法中，错误的是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"合同由双方代表签字， 加盖双方公章或合同专用章即生效",{"key":24,"text":160,"correct":22},"合同执行过程中的未尽事宜， 双方可协商签订补充协议",{"key":27,"text":162,"correct":22},"因合同发生争议， 未能达成调解和书面仲裁协议的， 双方可向人民法院起诉",{"key":31,"text":164,"correct":29},"测绘项目全部成果交接完毕后， 合同终止",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},911074,"（2014年）根据《测绘合同》示范文本，如果甲乙双方签订合同后，发现乙方擅自转包合同标的，甲方有权解除合同，并可要求乙方偿付的违约金数额为（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":29},"预算工程费的 30%",{"key":24,"text":172,"correct":22},"定金的 2 倍",{"key":27,"text":174,"correct":22},"工程款总额的 20%",{"key":31,"text":176,"correct":22},"已付工程款的 2 倍",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},911075,"（2014年）根据《测绘合同》示范文本，对于乙方提供的图纸等资料及属于乙方的测绘成果，甲方有义务保密，不得向第三方提供或用于本合同以外的项目，否则乙方有权要求甲方按本合同工程款总额的（ ）赔偿损失。",[181,183,185,187],{"key":20,"text":182,"correct":22},"10%",{"key":24,"text":184,"correct":29},"20%",{"key":27,"text":186,"correct":22},"25%",{"key":31,"text":188,"correct":22},"30%",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},911076,"（2015年）根据《测绘合同》示范文本，甲方按约定结清全部工程费用后，乙方应当按照（ ）向甲方交付全部测量成果。",[193,195,197,199],{"key":20,"text":194,"correct":29},"技术设计书要求",{"key":24,"text":196,"correct":22},"测绘技术标准要求",{"key":27,"text":198,"correct":22},"测绘法律法规要求",{"key":31,"text":200,"correct":22},"技术总结说明",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},911077,"（2015年）甲、乙双方签订了一份测绘合同，下列关于该合同变更的说法中，正确的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":29},"经双方协商一致， 可以变更",{"key":24,"text":208,"correct":22},"任何情况下， 双方都不得变更",{"key":27,"text":210,"correct":22},"一方不履行合同， 另一方可以变更",{"key":31,"text":212,"correct":22},"需要变更的， 双方必须协商一致， 并报主管部门审批",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},911078,"（2018年）根据《测绘合同》示范文本，下列关于甲乙双方义务的说法中不正确的是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"乙方根据技术设计书要求确保测绘项目如期完成",{"key":24,"text":220,"correct":29},"不允许甲方使用乙方为执行本合同所提供的属乙方所有的测绘成果",{"key":27,"text":222,"correct":22},"甲方应当对乙方提交的技术设计书做审订工作",{"key":31,"text":224,"correct":22},"未经甲方允许， 乙方不得将本合同标的的全部或部分转包给第三方",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":27,"analysis":33},911079,"（2017年）甲乙双方签订了测绘合同，由于（ ）造成测绘合同未按时完成，乙方应赔偿拖期损失费。",[229,231,233,235],{"key":20,"text":230,"correct":22},"测区天气恶劣",{"key":24,"text":232,"correct":22},"发生山体滑坡道路中断",{"key":27,"text":234,"correct":29},"乙方投入人员不够",{"key":31,"text":236,"correct":22},"应军事演习中断外业测量工作",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},911080,"（2016年）签订合同的测绘项目完成后，工程费结算的依据是（ ）",[241,243,245,247],{"key":20,"text":242,"correct":22},"测绘生产成本费用定额",{"key":24,"text":244,"correct":22},"测绘工程产品价格",{"key":27,"text":246,"correct":22},"测绘技术要求",{"key":31,"text":248,"correct":29},"测绘项目合同",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},911081,"（2016年）测绘合同签订后，由于甲方工程停止而终止，并且乙方未进入现场工作，双方没有约定定金。根据《测绘合同》示范文本，甲方应偿付乙方预算工程费的（ ）。",[253,255,256,257],{"key":20,"text":254,"correct":22},"5%",{"key":24,"text":182,"correct":22},{"key":27,"text":184,"correct":22},{"key":31,"text":188,"correct":29},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},911082,"（2016年）根据合同法，下列合同中，属于有效合同的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"损害社会公共利益的合同",{"key":24,"text":265,"correct":29},"限制民事行为能力人订立的纯获利益的合同",{"key":27,"text":267,"correct":22},"以合法形式掩盖非法目的的合同",{"key":31,"text":269,"correct":22},"以威迫手段强制订立的合同",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},911083,"（2011年）《测绘工程产品价格》规定，以图幅为工作量单位的测绘生产项目成本费用核算的“面积系数”计算公式是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"（实际面积-标准面积） \u002F 标准面积×70%",{"key":24,"text":277,"correct":29},"（实际面积-标准面积） \u002F 标准面积×80%",{"key":27,"text":279,"correct":22},"（实际面积-标准面积） \u002F 标准面积×90%",{"key":31,"text":281,"correct":22},"（实际面积-标准面积） \u002F 标准面积×120%",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},911084,"（2014年）根据《测绘生产成本费用定额》，测绘工作项目设计费用占成本费用的比例为（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"1%",{"key":24,"text":289,"correct":29},"1.5%",{"key":27,"text":291,"correct":22},"2%",{"key":31,"text":293,"correct":22},"3%",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},911085,"（2015年）某测绘单位拟委托开展测绘航空摄影工作，根据《测绘生产成本费用定额》，影响该项目经费预算的主要因素是（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"该测绘单位的资质等级",{"key":24,"text":301,"correct":29},"航摄范围及比例尺",{"key":27,"text":303,"correct":22},"航摄单位的资质等级",{"key":31,"text":305,"correct":22},"航摄仪型号",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},911086,"（2011年）《测绘工程产品价格》规定，1:500-1:2000比例尺带状地形测绘项目成本费用核算的“带状系数”为（ ）",[310,312,314,316],{"key":20,"text":311,"correct":22},"20%（图上宽度≤10cm） ， 10%（10cm\u003C图上宽度≤25cm）",{"key":24,"text":313,"correct":22},"25%（图上宽度≤10cm） ， 12%（10cm\u003C图上宽度≤25cm）",{"key":27,"text":315,"correct":29},"30%（图上宽度≤10cm） ， 15%（10cm\u003C图上宽度≤25cm）",{"key":31,"text":317,"correct":22},"35%（图上宽度≤10cm） ， 18%（10cm\u003C图上宽度≤25cm）",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},911087,"（2012年）直接用于完成特定项目所需的直接费用称为（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"项目成本",{"key":24,"text":325,"correct":22},"管理成本",{"key":27,"text":327,"correct":29},"生产成本",{"key":31,"text":329,"correct":22},"运营成本",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},911088,"（2013年）测绘工程费结算的主要依据是（ ）。",[334,335,336,338],{"key":20,"text":242,"correct":22},{"key":24,"text":244,"correct":22},{"key":27,"text":337,"correct":29},"测绘合同",{"key":31,"text":339,"correct":22},"测绘工程成本预算",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":31,"analysis":33},911089,"（2013年）根据《测绘生产成本费用定额计算细则》，下列测绘生产成本费用中，不属于直接生产成本的是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"期间费",{"key":24,"text":347,"correct":22},"运输费",{"key":27,"text":349,"correct":22},"材料费",{"key":31,"text":351,"correct":29},"工资",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":31,"analysis":33},911090,"（2014年）根据《测绘生产成本费用定额》，下列费用中，不列入成本费用的是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"直接费用",{"key":24,"text":359,"correct":22},"间接费用",{"key":27,"text":361,"correct":22},"期间费用",{"key":31,"text":363,"correct":29},"折旧费用",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},911091,"（2014年）根据《测绘生产困难类别细则》，在居民小区、工厂区进行管线探测，困难类别为（ ）类。",[368,370,372,374],{"key":20,"text":369,"correct":22},"一",{"key":24,"text":371,"correct":22},"二",{"key":27,"text":373,"correct":29},"三",{"key":31,"text":375,"correct":22},"四",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":31,"analysis":33},911092,"（2015年）某测绘单位承担了0.8平方千米的工业区域1:2000地形图测绘项目，根据《测绘生产成本费用定额》，该项目报价应为（ ）元。（工业区域成本费用为38899.39元\u002Fkm2，小面积系数为30%）",[380,382,384,386],{"key":20,"text":381,"correct":22},"31119.51",{"key":24,"text":383,"correct":22},"31625.20",{"key":27,"text":385,"correct":22},"38899.39",{"key":31,"text":387,"correct":29},"40455.36",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},911093,"（2015年）根据《测绘生产成本费用定额》，作业区域平均海拔高度最低不低于（ ）m时，成本费用定额中可增加高原系数。",[392,394,396,398],{"key":20,"text":393,"correct":22},"1500",{"key":24,"text":395,"correct":22},"2200",{"key":27,"text":397,"correct":22},"3000",{"key":31,"text":399,"correct":29},"3500",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},911094,"（2018年）根据《测绘生产成本费用定额》，测绘内业生产的作业期是（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"220 天 10 个月",{"key":24,"text":407,"correct":29},"220 天 12 个月",{"key":27,"text":409,"correct":22},"180 天 10 个月",{"key":31,"text":411,"correct":22},"180 天 12 个月",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},911095,"（2018年）根据《测绘生产成本费用定额》，海拔4000米的高原地区作用时，成本费用定额增加高原系数是（ ）。",[416,417,419,421],{"key":20,"text":293,"correct":22},{"key":24,"text":418,"correct":22},"6%",{"key":27,"text":420,"correct":29},"7%",{"key":31,"text":422,"correct":22},"8%",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},911096,"（2018年）根据测绘生产成本费用定额，作业区域平均海拔高度高于（ ）米时，成本费用定额中可增加高原系数",[427,428,430,431],{"key":20,"text":393,"correct":22},{"key":24,"text":429,"correct":22},"2000",{"key":27,"text":397,"correct":22},{"key":31,"text":399,"correct":29},{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},911097,"（2018年）根据国家财政和测绘主管部门颁布的《测绘生产成本费用定额》，测绘项目成果设计费用占项目总成本费用的（ ）。",[436,437,438,439],{"key":20,"text":287,"correct":22},{"key":24,"text":289,"correct":29},{"key":27,"text":293,"correct":22},{"key":31,"text":254,"correct":22},{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},911098,"（2016年）根据《测绘工程产品价格》，测绘工程产品合同价格可在测绘工程产品价格基础上上下浮动（ ）。",[444,445,447,448],{"key":20,"text":182,"correct":29},{"key":24,"text":446,"correct":22},"15%",{"key":27,"text":184,"correct":22},{"key":31,"text":188,"correct":22},{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},911099,"（2016年）根据《测绘生产成本费用定额》，全野外地形数据采集编辑项目中，要求基础数字线划图满足地籍图、房产图精度需要时的费用定额增加幅度是（ ）",[453,454,455,456],{"key":20,"text":182,"correct":22},{"key":24,"text":184,"correct":29},{"key":27,"text":188,"correct":22},{"key":31,"text":457,"correct":22},"40%",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},911100,"（2011年）某中等城市拟于2011年启动建立城市GPS控制网基础测绘项目，其城市坐标系统应当基于（ ）建立。",[462,464,466,468],{"key":20,"text":463,"correct":22},"1954 年北京坐标系",{"key":24,"text":465,"correct":29},"2000 国家大地坐标系",{"key":27,"text":467,"correct":22},"1980 西安坐标系",{"key":31,"text":469,"correct":22},"城市独立坐标系",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},911101,"（2011年）测绘法规定批准全国统一的大地基准，高程基准，深度基准和重力基准数据的机构是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":29},"国务院",{"key":24,"text":477,"correct":22},"国务院测绘行政主管部门",{"key":27,"text":479,"correct":22},"军队测绘主管部门",{"key":31,"text":481,"correct":22},"国务院发展激活主管部门",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},911102,"（2012年）建立地理信息系统，必须采用符合（ ）的基础地理信息数据。",[486,488,490,492],{"key":20,"text":487,"correct":22},"社会标准",{"key":24,"text":489,"correct":29},"国家标准",{"key":27,"text":491,"correct":22},"个人标准",{"key":31,"text":493,"correct":22},"公司标准",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},911103,"（2012年）（ ）是指由测绘基准延伸，在一定范围内布设的各种测量控制网，它们是各类测绘成果的依据。",[498,500,502,504],{"key":20,"text":499,"correct":29},"测绘系统",{"key":24,"text":501,"correct":22},"地理信息系统",{"key":27,"text":503,"correct":22},"坐标系统",{"key":31,"text":505,"correct":22},"高程系统",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":27,"analysis":33},911104,"（2012年）测绘基准不包括（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"所选用的各种大地测量参数",{"key":24,"text":513,"correct":22},"统一的起算面",{"key":27,"text":515,"correct":29},"各种测量控制网",{"key":31,"text":517,"correct":22},"起算方位及有关的地点、 设施和名称等",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},911105,"（2014年）根据测绘法，全国统一的大地基准、高程基准、深度基准和重力基准，其数据由（ ）批准。",[522,523,524,526],{"key":20,"text":475,"correct":29},{"key":24,"text":477,"correct":22},{"key":27,"text":525,"correct":22},"国务院测绘行政主管部门会同国务院其他有关部门",{"key":31,"text":479,"correct":22},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":27,"analysis":33},911106,"（2015年）根据测绘法，全国统一的大地基准、高程基准、深度基准和重力基准，其数据由（ ）审核。",[531,532,533,534],{"key":20,"text":475,"correct":22},{"key":24,"text":479,"correct":22},{"key":27,"text":477,"correct":29},{"key":31,"text":535,"correct":22},"国务院测绘行政主管部门会同有关部门",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":27,"analysis":33},911107,"（2012）在不妨碍国家安全的情况下，确有必要采用国际坐标系统的，必须经（ ）会同军队测绘主管部门批准。",[540,542,544,545],{"key":20,"text":541,"correct":22},"县级以上测绘行政主管部门",{"key":24,"text":543,"correct":22},"省级以上测绘行政主管部门",{"key":27,"text":477,"correct":29},{"key":31,"text":546,"correct":22},"住房和城乡建设部",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":27,"analysis":33},911108,"（2013年）下列关于建立相对独立的平面坐标系统的说法中，错误的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"一个城市只能建立一个相对独立的平面坐标系统",{"key":24,"text":554,"correct":22},"建立相对独立的平面坐标系统， 应当与国家坐标系统相联系",{"key":27,"text":556,"correct":29},"建立相对独立的平面坐标系统， 是指以任意点和正北方向起算建立的平面坐标系统",{"key":31,"text":558,"correct":22},"建立城市相对独立的平面坐标系统， 应当经该市人民政府同意",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},911109,"（2014年）根据《建立相对独立的平面坐标系统管理办法》，河北省石家庄市建立相对独立的平面坐标系统，应当由（ ）批准。",[563,564,566,568],{"key":20,"text":477,"correct":29},{"key":24,"text":565,"correct":22},"河北省测绘行政主管部门",{"key":27,"text":567,"correct":22},"石家庄市测绘行政主管部门",{"key":31,"text":479,"correct":22},{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},911110,"（2015年）根据《建立相对独立的平面坐标系统管理办法》，江苏省南京市建立相对独立的平面坐标系统，应当由（ ）负责审批。",[573,574,576,578],{"key":20,"text":477,"correct":29},{"key":24,"text":575,"correct":22},"江苏省测绘行政主管部门",{"key":27,"text":577,"correct":22},"南京市测绘行政主管部门",{"key":31,"text":479,"correct":22},{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":27,"analysis":33},911111,"（2017年）某人口数为500余万的省会城市，因城市建设和城市规划需要，拟建立相对独立的平面坐标系统，则该项审批事项应当由（ ）批准。",[583,585,586,588],{"key":20,"text":584,"correct":22},"该省测绘地理信息主管部门",{"key":24,"text":546,"correct":22},{"key":27,"text":587,"correct":29},"国家测绘地理信息局",{"key":31,"text":589,"correct":22},"住房和城乡建设部会同国家测绘地理信息局",[591,594,597,600,603,606],{"id":15,"name":592,"category":7,"favorite":593},"领导干部任职前廉政法规知识测试题",92,{"id":595,"name":596,"category":7,"favorite":15},595,"建筑结构与设备",{"id":598,"name":599,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":601,"name":602,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":604,"name":605,"category":7,"favorite":8},534,"BIM工程师",{"id":607,"name":605,"category":7,"favorite":8},535]