[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-913023":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},913023,588,2,"多选题","根据《测绘技术总结编写规定》，下列关于测绘项目总结的说法中，错误的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","测绘项目总结由承担项目的法人单位负责编写",false,{"key":16,"text":17,"correct":14},"B","测绘项目总结应统计有关作业定额和作业率",{"key":19,"text":20,"correct":21},"C","测绘项目总结是在一个测绘项目最终成果（或产品）生产结束后编写的",true,{"key":23,"text":24,"correct":21},"D","技术总结需单位法人代表审核签字",{"key":26,"text":27,"correct":14},"E","测绘项目总结通常由单位的技术人员编写","CD","根据《测绘技术总结编写规定》（CH\u002FT 1001—2005）第3.3节规定，测绘项目总结由承担项目的法人单位负责编写；具体的编写工作通常由单位的技术人员编写；技术总结编写完成后，单位总工程师或技术负责人应对技术总计编写的客观性、完整性等进行审核并签字，并对技术总结编写的质量负责。根据第3.2节规定，测绘项目技术总结是在一个测绘项目最终成果（或产品）检查合格后撰写的技术文档。根据第4.2.1条规定，测绘项目总结应说明生产任务安排与完成情况，统计有关作业定额和作业率。",{"id":6,"name":31,"category":32,"favorite":33},"测绘管理与法律法规","建筑工程",0]