[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912984":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},912984,588,2,"多选题","测绘项目管理的目标有哪些？（ ）",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","工期目标",true,{"key":16,"text":17,"correct":14},"B","成本目标",{"key":19,"text":20,"correct":14},"C","质量目标",{"key":22,"text":23,"correct":24},"D","技术目标",false,{"key":26,"text":27,"correct":24},"E","发展目标","ABC","测绘项目目标实际上就是在规定的工期内尽量降低成本、保证质量地完成项目合同中所要求的所有测绘任务，项目目标包括工期目标、成本目标和质量目标。",{"id":6,"name":31,"category":32,"favorite":33},"测绘管理与法律法规","建筑工程",0]