[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912981":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},912981,588,2,"多选题","根据《基础地理信息城市数据库建设规范》，数据入库前检查的依据包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","数据库设计中对数据的技术要求",true,{"key":16,"text":17,"correct":14},"B","数据生产技术设计书",{"key":19,"text":20,"correct":14},"C","数据生产技术总结",{"key":22,"text":23,"correct":14},"D","数据生产的数据检查报告",{"key":25,"text":26,"correct":27},"E","数据库测试报告",false,"ABCD","根据《基础地理信息城市数据库建设规范》（GB\u002FT 21740—2008）第7.4.1条规定，数据入库前检查的依据包括：①数据库设计中对数据的技术要求；②数据生产技术设计书和有关技术规定；③数据生产技术总结；④数据生产的数据检查报告。",{"id":6,"name":31,"category":32,"favorite":33},"测绘管理与法律法规","建筑工程",0]