[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912755":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},912755,588,2,"多选题","根据《测绘市场管理暂行办法》，测绘项目的承包方必须以自己的（ ）完成所承揽项目的主要部分。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","设备",true,{"key":16,"text":17,"correct":14},"B","技术",{"key":19,"text":20,"correct":21},"C","物资",false,{"key":23,"text":24,"correct":14},"D","劳力",{"key":26,"text":27,"correct":21},"E","资金","ABD","根据《测绘市场管理暂行办法》第二十一条规定，测绘项目的承包方必须以自己的设备、技术和劳力完成所承揽项目的主要部分。",{"id":6,"name":31,"category":32,"favorite":33},"测绘管理与法律法规","建筑工程",0]