[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912745":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},912745,588,2,"多选题","根据《测绘生产成本费用定额比确定测绘工作项目\"定额工日\"的因素包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","生产技术方法",true,{"key":16,"text":17,"correct":18},"B","工作内容",false,{"key":20,"text":21,"correct":14},"C","产品形式",{"key":23,"text":24,"correct":14},"D","技术装备水平",{"key":26,"text":27,"correct":18},"E","工期要求","ACD","根据《测绘生产成本费用定额计算细则》，测绘\"定额工日\"根据测绘生产技术方法、产品形式和技术装备水平确定。",{"id":6,"name":31,"category":32,"favorite":33},"测绘管理与法律法规","建筑工程",0]