[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912565":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},912565,588,1,"单选题","技术总结经（ ）后，随测绘成果（或产品）、测绘技术设计文件和成果检查报告一并上交和归档。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","编写完成",false,{"key":16,"text":17,"correct":14},"B","领导审阅",{"key":19,"text":20,"correct":21},"C","审核签字",true,{"key":23,"text":24,"correct":14},"D","委托方同意","根据《测绘技术总结编写规定》（CH\u002FT 1001—2005）第3.3条规定，技术总结编写完成后，单位总工程师或技术负责人应对技术总结编写的客观性、完整性等进行审查并签字，并对技术总结编写的质量负责。技术总结经审核、签字后，随测绘成果（或产品）、测绘技术设计文件和成果（或产品）检查报告一并上交和归档。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]