[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912549":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},912549,588,1,"单选题","根据《测绘技术总结编写规定》，下列文件中，在总结技术设计执行情况时，不作为说明专业测绘活动所依据的技术性文件的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","测绘合同",true,{"key":16,"text":17,"correct":18},"B","专业技术设计书",false,{"key":20,"text":21,"correct":18},"C","项目设计书",{"key":23,"text":24,"correct":18},"D","有关技术标准和规范","根据《测绘技术总结编写规定》（CH\u002FT 1001—2005）第4.3节规定，总结技术设计执行情况的依据有：①测绘技术设计文件（包括项目设计书、专业技术设计书等）、相关的法律、法规、技术标准和规范；②设计书执行情况以及执行过程中技术性更改情况；③生产过程中出现的主要技术问题和处理方法。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]