[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912448":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},912448,588,1,"单选题","测绘项目资金预算控制通常由（ ）负责。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","总工程师",false,{"key":16,"text":17,"correct":14},"B","院长（总经理）",{"key":19,"text":20,"correct":14},"C","项目委托方",{"key":22,"text":23,"correct":24},"D","项目监理方",true,"测绘项目的资金控制管理贯穿于项目的全过程，通常由项目监理方负责。如有不可抗力情况出现或测绘项目计划调整较大时，预算资金需要进行调整时，可将调整后的预算资金方案上报项目委托方，经项目委托方批准后，按新的资金预算方案执行。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]