[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912418":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},912418,588,1,"单选题","下列测绘项目组织活动中，与测绘项目承担单位无关的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","成本控制",false,{"key":16,"text":17,"correct":14},"B","进度控制",{"key":19,"text":20,"correct":14},"C","质量控制",{"key":22,"text":23,"correct":24},"D","投资控制",true,"测绘项目承担单位，针对测绘项目的目标管理，要做好三大控制：进度控制、成本控制、质量控制，投资控制是甲方需要考虑的内容。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]