[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912411":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},912411,588,1,"单选题","根据《测绘技术设计规定》，设计审批的依据不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计输出内容",true,{"key":16,"text":17,"correct":18},"B","设计输入内容",false,{"key":20,"text":21,"correct":18},"C","验证报告",{"key":23,"text":24,"correct":18},"D","设计评审","根据《测绘技术设计规定》（CH\u002FT 1004—2005）第5.6条第2款和第3款规定，设计审批是根据设计策划安排，依据技术输入、设计评审和验证报告等对技术设计文件进行审批。设计审批的方法：承担测绘任务的法人单位进行全面审核，并在技术设计文件和（或）产品样品上签署意见并签名（或章）后，一式二至四份报测绘任务的委托单位审批。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]