[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912394":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},912394,588,1,"单选题","根据《测绘技术设计规定》，测绘项目设计书中的“质量保证措施和要求”不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","组织管理措施",false,{"key":16,"text":17,"correct":18},"B","工期保障措施",true,{"key":20,"text":21,"correct":14},"C","质量控制措施",{"key":23,"text":24,"correct":14},"D","数据安全措施","根据《测绘技术设计规定》（CH\u002FT 1004—2005）第5.3.2条第5款第5项规定，质量保证措施和要求，内容主要包括：①组织管理措施。规定项目实施的组织管理和主要人员的职责和权限；②资源保证措施。对人员的技术能力或培养的要求；对软、硬件装备的需求等；新版章节练习，考前压卷，更多优质题库+考生笔记分享，实时更新，用金考典软件考，下载链接 www.jinkaodian.com③质量控制措施。规定生产过程中的质量控制环节和产品质量检查、验收的主要要求；④数据安全措施。规定数据安全和备份方面的要求。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]