[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912382":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},912382,588,1,"单选题","根据《测绘生产质量管理规定》，测绘项目的技术设计书应当经过哪个单位的审批？（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目委托单位",true,{"key":16,"text":17,"correct":18},"B","项目承担单位",false,{"key":20,"text":21,"correct":18},"C","项目监理单位",{"key":23,"text":24,"correct":18},"D","项目质检单位","根据《测绘生产质量管理规定》，承担测绘任务的法人单位进行全面审核，并在技术设计文件和（或）产品样品上签署意见并签名（或章）后，一式二至四份报测绘任务的委托单位审批。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]