[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912256":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},912256,588,1,"单选题","根据《测绘生产质量管理规定》，下列不属于测绘生产作业过程中的质量控制措施的是",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","首件产品质量检验",false,{"key":16,"text":17,"correct":14},"B","测绘单位进行二级质量检查",{"key":19,"text":20,"correct":21},"C","测绘地理信息行政主管部门进行质量监督抽检",true,{"key":23,"text":24,"correct":14},"D","项目管理单位委托第三方进行过程质量控制","根据《测绘生产质量管理规定》第四章规定，测绘生产作业过程中的质量控制措施的内容的包括首件产品质量检验、测绘单位进行二级质量检查、项目管理单位委托第三方进过程质量控制。不包括测绘地理信息行政主管部门进行质量监督抽检内容。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]