[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912249":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},912249,588,1,"单选题","下列选项中，关于贯标工作的组织步骤实施描述不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量管理体系运行和实施阶段，时间一般不应少于2个月左右",true,{"key":16,"text":17,"correct":18},"B","体系总体设计和资源配备阶段，时间需要1个月左右",false,{"key":20,"text":21,"correct":18},"C","文件编制阶段，时间一般需要3个月左右",{"key":23,"text":24,"correct":18},"D","组织策划和领导投入阶段，时间一般需要约1个月","质量管理体系运行和实施阶段包括进行质量手册、程序文件和其他质量文件发放到位；各级人员进行文件的学习；质量管理体系运行和改进等工作，时间一般应不少于3个月。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]