[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-912155":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},912155,588,1,"单选题","根据《公开地图内容表示补充规定（试行）》，公开地图确需表示大型水利、电力、通信等设施的位置时，其位置精度不得高于（ ）m。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","20",false,{"key":16,"text":17,"correct":14},"B","50",{"key":19,"text":20,"correct":21},"C","100",true,{"key":23,"text":24,"correct":14},"D","200","根据《公开地图内容表示补充规定（试行）》第六条第一款规定，公开地图不得表示下列内容的具体形状及属性（用于公共服务的设施可以标注名称），确需表示位置时其位置精度不得高于100m：大型水利设施、电力设施、通信设施、石油和燃气设施、重要战略物资储备库、气象台站、降雨雷达站和水文观测站（网）等涉及国家经济命脉，对人民生产、生活有重大影响的民用设施。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]