[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-911790":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},911790,588,1,"单选题","基础测绘中长期规划是政府对基础测绘在时问和空间上的战略部署及其具体安排，其规划期一般至少为（ ）年。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","5",true,{"key":16,"text":17,"correct":18},"B","10",false,{"key":20,"text":21,"correct":18},"C","15",{"key":23,"text":24,"correct":18},"D","20","根据《基础测绘计划管理办法》第六条规定，基础测绘中长期规划是政府对基础测绘在时间和空间上的战略部署及其具体安排，其主要任务包括：①加强重大问题研究，理清发展思路，做好重大工程项目的筛选和指标论证；②其规划期应当根据基础测绘工作特点、经济建设、社会发展和国防建设的实际需要合理确定，一般至少为5年。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]