[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-911758":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},911758,588,1,"单选题","拆迁永久性测量标志或者使永久性测量标志失去效能的，依法应当经()批准。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","测量标志建设单位",false,{"key":16,"text":17,"correct":14},"B","测量标志所在地市级测绘地理信息行政主管部门",{"key":19,"text":20,"correct":14},"C","测量标志保管单位",{"key":22,"text":23,"correct":24},"D","省级以上测绘地理信息行政主管部门",true,"拆迁永久性测量标志或者使永久性测量标志失去效能的，属于行政许可事项。测量标志保护条例明确由省级以上测绘地理信息行政主管部门负责审批。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]