[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-911746":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},911746,588,1,"单选题","拆迁基础性测量标志或者使基础性测量标志失去使用效能的，应当由（ ）批准。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","国务院测绘行政主管部门",false,{"key":16,"text":17,"correct":14},"B","省级测绘行政主管部门",{"key":19,"text":20,"correct":14},"C","标志所在地的市级测绘行政主管部门",{"key":22,"text":23,"correct":24},"D","国务院测绘行政主管部门或者省级测绘行政主管部门",true,"根据《测量标志保护条例》第十九条规定，进行工程建设，应当避开永久性测量标志；确实无法避开，需要拆迁永久性测量标志或者使永久性测量标志失去使用效能的，工程建设单位应当履行下列批准手续：①拆迁基础性测量标志或者使基础性测量标志失去使用效能的，由国务院测绘行政主管部门或者省、自治区、直辖市人民政府管理测绘工作的部门批准；②拆迁部门专用的永久性测量标志或者使部门专用的永久性测量标志失去使用效能的，应当经设置测量标志的部门同意，并经省、自治区、直辖市人民政府管理测绘工作的部门批准。",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]