[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-911118":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},911118,588,1,"单选题","（2012年）经批准拆迁基础性测量标志或者使基础性测量标志失去使用效能的，工程建设单位应当按照国家有关规定（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","支付迁建费用",true,{"key":16,"text":17,"correct":18},"B","重新建设一座",false,{"key":20,"text":21,"correct":18},"C","缴纳罚款",{"key":23,"text":24,"correct":18},"D","赔偿损失","",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]