[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-911080":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},911080,588,1,"单选题","（2016年）签订合同的测绘项目完成后，工程费结算的依据是（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","测绘生产成本费用定额",false,{"key":16,"text":17,"correct":14},"B","测绘工程产品价格",{"key":19,"text":20,"correct":14},"C","测绘技术要求",{"key":22,"text":23,"correct":24},"D","测绘项目合同",true,"",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]