[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-911079":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},911079,588,1,"单选题","（2017年）甲乙双方签订了测绘合同，由于（ ）造成测绘合同未按时完成，乙方应赔偿拖期损失费。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","测区天气恶劣",false,{"key":16,"text":17,"correct":14},"B","发生山体滑坡道路中断",{"key":19,"text":20,"correct":21},"C","乙方投入人员不够",true,{"key":23,"text":24,"correct":14},"D","应军事演习中断外业测量工作","",{"id":6,"name":27,"category":28,"favorite":29},"测绘管理与法律法规","建筑工程",0]