[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-57":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":319},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,57,50,2821,[13,38,53,68,83,98,113,128,143,158,173,187,201,212,226,240,251,264,279,293,307],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},910939,2,"多选题","（2018年考题）工程项目决策阶段编制的项目建议书应包括的内容有（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","环境影响的初步评价",true,{"key":24,"text":25,"correct":26},"B","社会评价和风险分析",false,{"key":28,"text":29,"correct":26},"C","主要原材料供应方案",{"key":31,"text":32,"correct":22},"D","资金筹措方案设想",{"key":34,"text":35,"correct":22},"E","项目进度安排","ADE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},910940,"（2020年真题）在工程建设实施过程中，为了做好环境保护全体工程与环保措施工程必须同时进行的工作有（）",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"招标",{"key":24,"text":45,"correct":22},"设计",{"key":28,"text":47,"correct":22},"施工",{"key":31,"text":49,"correct":26},"竣工结算",{"key":34,"text":51,"correct":22},"投入运行","BCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},910941,"（2014年考题）下列关于CM承包模式的说法，正确的有（）",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"CM承包模式下采用快速路径法施工",{"key":24,"text":60,"correct":26},"CM单位直接与分包单位签订分包合同",{"key":28,"text":62,"correct":22},"CM合同采用成本加酬金的计价方式",{"key":31,"text":64,"correct":26},"CM单位与分包单位之间的合同价是保密的",{"key":34,"text":66,"correct":22},"CM单位不赚取总包与分包之间的差价","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},910942,"（2015年考题）建设工程采用平行承包模式时，建设单位控制工程造价难度大的原因有（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"合同价值小，建设单位选择承包单位的范围小",{"key":24,"text":75,"correct":26},"合同数量多，组织协调工作量大",{"key":28,"text":77,"correct":22},"总合同价不易在短期内确定，影响造价控制的实施",{"key":31,"text":79,"correct":26},"建设周期长，增加时间成本",{"key":34,"text":81,"correct":22},"工程招标任务量大，需控制多项合同价格","CE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},910943,"（2019年考题）项目管理采用矩阵制组织机构形式的特点有（）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"组织机构稳定性强",{"key":24,"text":90,"correct":26},"容易造成职责不清",{"key":28,"text":92,"correct":22},"组织机构灵活性大",{"key":31,"text":94,"correct":22},"组织机构机动性强",{"key":34,"text":96,"correct":22},"每一个成员受双重领导","CDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},910944,"（2013年考题）关于强矩阵组织形式的说法，正确的有（）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"项目经理具有较大权限",{"key":24,"text":105,"correct":26},"需要配备训练有素的协调人员",{"key":28,"text":107,"correct":22},"项目组织成员绩效完全由项目经理考核",{"key":31,"text":109,"correct":22},"适用于技术复杂且时间紧迫的工程项目",{"key":34,"text":111,"correct":22},"项目经理直接向企业最高领导负责","ACDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},910945,"（2020年真题）与EPC总承包模式相比，平行承包模式的特点有（）",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"建设单位可在更大范围内选择承包单位",{"key":24,"text":120,"correct":22},"建设单位组织协调工作量大",{"key":28,"text":122,"correct":22},"建设单位合同管理工作量大",{"key":31,"text":124,"correct":26},"有利于建设单位较早确定工程造价",{"key":34,"text":126,"correct":26},"有别于建设单位向承包单位转移风险","ABC",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},910946,"（2016年考题）采用控制图法控制生产过程质量时，说明点子在控制界限内排列有缺陷的情形有（）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"点子连续在中心线一侧出现7个以上",{"key":24,"text":135,"correct":22},"连续7个以上的点子上升或下降",{"key":28,"text":137,"correct":26},"连续11个点子落在一倍标准偏差控制界限之外",{"key":31,"text":139,"correct":26},"点子落在两倍标准偏差控制界限之外",{"key":34,"text":141,"correct":26},"点子落在三倍标准偏差控制界限附近","AB",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":157,"analysis":37},910947,"（2019年考题）下列工程项目目标控制方法中,可用来控制工程造价和工程进度的方法有（）。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"香蕉曲线法",{"key":24,"text":150,"correct":26},"目标管理法",{"key":28,"text":152,"correct":22},"S曲线法",{"key":31,"text":154,"correct":26},"责任矩阵法",{"key":34,"text":156,"correct":26},"因果分析图法","AC",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":172,"analysis":37},910948,"（2014年考题）建设单位编制的工程项目建设总进度计划包括的内容有（）",[162,164,166,168,170],{"key":20,"text":163,"correct":26},"竣工投产交付使用计划表",{"key":24,"text":165,"correct":22},"工程项目一览表",{"key":28,"text":167,"correct":26},"年度建设资金平衡表",{"key":31,"text":169,"correct":22},"工程项目进度平衡表",{"key":34,"text":171,"correct":22},"投资计划年度分配表","BDE",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":186,"analysis":37},910949,"（2015年考题）下列项目目标控制方法中，可用于控制工程质量的有（）。",[177,178,180,182,184],{"key":20,"text":152,"correct":26},{"key":24,"text":179,"correct":22},"控制图法",{"key":28,"text":181,"correct":22},"排列图法",{"key":31,"text":183,"correct":22},"直方图法",{"key":34,"text":185,"correct":26},"横道图法","BCD",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":186,"analysis":37},910950,"（2016年考题）根据《建筑施工组织设计规范》，单位工程施工组织设计中的施工部署应包括（）。",[191,193,195,197,199],{"key":20,"text":192,"correct":26},"施工资源配置计划",{"key":24,"text":194,"correct":22},"施工进度安排和空间组织",{"key":28,"text":196,"correct":22},"施工重点和难点分析",{"key":31,"text":198,"correct":22},"工程项目管理组织机构",{"key":34,"text":200,"correct":26},"施工现场平面布置",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":211,"analysis":37},910951,"（2020年真题）下列工程项目目标控制方法中，可用来综合控制工程造价和工程进度的方法有",[205,206,208,209,210],{"key":20,"text":179,"correct":26},{"key":24,"text":207,"correct":26},"因果分析法",{"key":28,"text":152,"correct":22},{"key":31,"text":148,"correct":22},{"key":34,"text":183,"correct":26},"CD",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":127,"analysis":37},910952,"（2020年真题）关于排列图的说法，正确的有（）",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"排列图左边的纵坐标表示影响因素发生的频数",{"key":24,"text":219,"correct":22},"排列图中直方图形的高度表示影响因素造成损失的大小",{"key":28,"text":221,"correct":22},"排列图右边的纵坐标表示影响因素累计发生的频率",{"key":31,"text":223,"correct":26},"累计频率在90%-100%范围内的因素是影响工程质量的主要因素",{"key":34,"text":225,"correct":26},"排列图可用判定工程质量主要影响因素造成的费用增加值",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":186,"analysis":37},910953,"（2013年考题）非节奏流水施工的特点有（）。",[230,232,234,236,238],{"key":20,"text":231,"correct":26},"各施工段的流水节拍均相等",{"key":24,"text":233,"correct":22},"相邻施工过程的流水步距不尽相等",{"key":28,"text":235,"correct":22},"专业工作队数等于施工过程数",{"key":31,"text":237,"correct":22},"施工段之间可能有空闲时间",{"key":34,"text":239,"correct":26},"有的专业工作队不能连续作业",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":127,"analysis":37},910954,"（2014年考题）固定节拍流水施工的特点有（）",[244,246,248,249,250],{"key":20,"text":245,"correct":22},"各施工段上的流水节拍均相等",{"key":24,"text":247,"correct":22},"相邻施工过程的流水步距均相等",{"key":28,"text":235,"correct":22},{"key":31,"text":237,"correct":26},{"key":34,"text":239,"correct":26},{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":263,"analysis":37},910955,"（2015年考题）建设工程组织加快的成倍节拍流水施工的特点有（）。",[255,257,258,260,261],{"key":20,"text":256,"correct":22},"各专业工作队在施工段上能够连续作业",{"key":24,"text":247,"correct":22},{"key":28,"text":259,"correct":22},"不同施工过程的流水节拍成倍数关系",{"key":31,"text":237,"correct":26},{"key":34,"text":262,"correct":22},"专业工作队数大于施工过程数","ABCE",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":278,"analysis":37},910956,"（2016年考题）下列流水施工参数中，用来表达流水施工在空间布置上开展状态的参数有（）。",[268,270,272,274,276],{"key":20,"text":269,"correct":26},"流水能力",{"key":24,"text":271,"correct":26},"施工工程",{"key":28,"text":273,"correct":26},"流水强度",{"key":31,"text":275,"correct":22},"工作面",{"key":34,"text":277,"correct":22},"施工段","DE",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":142,"analysis":37},910957,"（2018年考题）建设工程组织流水施工时,确定流水节拍的方法有（）。",[283,285,287,289,291],{"key":20,"text":284,"correct":22},"定额计算法",{"key":24,"text":286,"correct":22},"经验估计法",{"key":28,"text":288,"correct":26},"价值工程法",{"key":31,"text":290,"correct":26},"ABC分析法",{"key":34,"text":292,"correct":26},"风险概率法",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":306,"analysis":37},910958,"（2019年考题）建设工程组织固定节拍流水施工的特点有（）。",[297,298,300,302,304],{"key":20,"text":262,"correct":26},{"key":24,"text":299,"correct":22},"施工段之间没有空闲时间",{"key":28,"text":301,"correct":22},"相邻施工过程的流水步距相等",{"key":31,"text":303,"correct":22},"各施工段上的流水节拍相等",{"key":34,"text":305,"correct":22},"各专业工作队能够在各施工段上连续作业","BCDE",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":318,"analysis":37},910959,"（2017年考题）建设工程组织加快的成倍节拍流水施工的特点有（）",[311,313,314,315,317],{"key":20,"text":312,"correct":26},"同一施工过程的各施工段上的流水节拍成倍数关系",{"key":24,"text":301,"correct":22},{"key":28,"text":235,"correct":26},{"key":31,"text":316,"correct":22},"各专业工作队在施工段上可连续工作",{"key":34,"text":237,"correct":26},"BD",[320,324,327,330,333,336],{"id":321,"name":322,"category":7,"favorite":323},1,"领导干部任职前廉政法规知识测试题",92,{"id":325,"name":326,"category":7,"favorite":321},595,"建筑结构与设备",{"id":328,"name":329,"category":7,"favorite":321},715,"招标采购专业知识与法律法规",{"id":331,"name":332,"category":7,"favorite":321},848,"市政方向-通用基础",{"id":334,"name":335,"category":7,"favorite":8},534,"BIM工程师",{"id":337,"name":335,"category":7,"favorite":8},535]