[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-55":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":741},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,55,50,2821,[13,38,53,68,82,97,112,126,141,156,171,186,200,215,230,245,259,273,287,302,316,330,345,359,373,387,401,416,430,445,459,473,487,501,515,529,543,558,573,587,602,616,630,644,658,672,686,700,713,727],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},910838,2,"多选题","设计概算的审查内容包括（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","概算编制依据",true,{"key":24,"text":25,"correct":22},"B","概算编制深度",{"key":27,"text":28,"correct":29},"C","概算技术先进性",false,{"key":31,"text":32,"correct":29},"D","概算经济和理性",{"key":34,"text":35,"correct":22},"E","概算主要内容","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},910839,"多指标法就是采用多个指标，将各个对比方案的相应指标值逐一进行分析比较，按照各种指标数值的高低对其作出评价。其评价指标包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"工程造价指标",{"key":24,"text":45,"correct":22},"主要材料消耗指标",{"key":27,"text":47,"correct":22},"劳动消耗指标",{"key":31,"text":49,"correct":29},"利润指标",{"key":34,"text":51,"correct":22},"工期指标","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},910840,"关于施工图预算的审查方法，下列说法正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"标准预算审查法适用于通用图纸施工的工程",{"key":24,"text":60,"correct":29},"筛选审查法不适用住宅工程",{"key":27,"text":62,"correct":22},"分组计算审查法能够加快审查工程量的速度",{"key":31,"text":64,"correct":22},"逐项审查法优点是全面、细致，审查的质量高",{"key":34,"text":66,"correct":22},"利用手册审查法是按手册对照审查","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":67,"analysis":37},910841,"工程项目中设计概算的审查方法包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"对比分析法",{"key":24,"text":75,"correct":29},"多因素分析法",{"key":27,"text":77,"correct":22},"查询核实法",{"key":31,"text":79,"correct":22},"分类整理法",{"key":34,"text":81,"correct":22},"联合会审法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},910842,"在工程项目限额设计实施程序中，目标推进通常包括（ ）两个阶段。",[86,88,90,92,94],{"key":20,"text":87,"correct":29},"制定限额设计的质量目标",{"key":24,"text":89,"correct":22},"限额初步设计",{"key":27,"text":91,"correct":29},"制定限额设计的造价目标",{"key":31,"text":93,"correct":22},"限额施工图设计",{"key":34,"text":95,"correct":29},"制定限额设计的进度目标","BD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},910843,"工程项目设计方案的评价指标体系包括以下内容（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"使用价值指标",{"key":24,"text":104,"correct":29},"项目社会价值指标",{"key":27,"text":106,"correct":22},"工程项目满足需要程度的指标",{"key":31,"text":108,"correct":29},"财务分析指标",{"key":34,"text":110,"correct":22},"反映创造使用价值所消耗的劳动量等资源的指标","ACE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":67,"analysis":37},910844,"在评标时，未能对招标文件作出实质性响应，应作废标处理的情形（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"投标文件没有投标单位授权代表签字和加盖公章",{"key":24,"text":119,"correct":29},"大写金额与小写金额不一致",{"key":27,"text":121,"correct":22},"明显不符合技术规格、技术标准的要求",{"key":31,"text":123,"correct":22},"投标文件载明的招标项目完成期限超过招标文件规定的期限",{"key":34,"text":125,"correct":22},"投标文件附有招标单位不能接受的条件",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},910845,"根据FIDIC《土木工程施工合同条件》，工程师在工程付款控制方面的权力主要表现在（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"A：批准使用暂定金额和计日工",{"key":24,"text":133,"correct":22},"B：签发各种付款证书",{"key":27,"text":135,"correct":22},"C：确定变更工程的估价",{"key":31,"text":137,"correct":29},"D：承包商修改施工进度计划",{"key":34,"text":139,"correct":29},"E：审核承包商的索赔","ABC",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},910846,"不利的物质条件通常是指（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"A：非自然的物质障碍和污染物",{"key":24,"text":148,"correct":29},"B：国家政策、法律、法令的变更",{"key":27,"text":150,"correct":29},"C：水灾",{"key":31,"text":152,"correct":29},"D：海啸",{"key":34,"text":154,"correct":22},"E：不可预见的自然物质条件","AE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},910847,"根据《标准施工招标文件》中的合同条款，签约合同价包含的内容有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":29},"A：变更价款",{"key":24,"text":163,"correct":22},"B：暂列金额",{"key":27,"text":165,"correct":29},"C：索赔费用",{"key":31,"text":167,"correct":29},"D：结算价款",{"key":34,"text":169,"correct":22},"E：暂估价","BE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},910848,"根据FIDIC《施工合同条件》的规定，关于争端裁决委员会（DA B）及其裁决的说法，正确的有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":29},"A：DAB须由3人组成",{"key":24,"text":178,"correct":22},"B：合同双方共同确定DAB主席",{"key":27,"text":180,"correct":22},"C：DAB成员的酬金由合同双方各支付一半",{"key":31,"text":182,"correct":22},"D：合同当事人有权不接受DAB的裁决",{"key":34,"text":184,"correct":29},"E：合同双方对DAB的约定排除了合同仲裁的可能性","BCD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":36,"analysis":37},910849,"施工合同中，合同计价方式包括（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"A：总价方式",{"key":24,"text":193,"correct":22},"B：单价方式",{"key":27,"text":195,"correct":29},"C：成本加利润方式",{"key":31,"text":197,"correct":29},"D：平均估算方式",{"key":34,"text":199,"correct":22},"E：成本加酬金方式",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},910850,"在工程项目招标过程中，划分标段时应考虑的因素有（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"A：工程特点",{"key":24,"text":207,"correct":22},"B：承包单位专长的发挥",{"key":27,"text":209,"correct":22},"C：工地管理",{"key":31,"text":211,"correct":22},"D：建设资金到位率",{"key":34,"text":213,"correct":29},"E：履约保证金的数额","ABCD",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},910851,"在评标时，属于重大偏差的情形是（ ）。",[219,221,223,225,227],{"key":20,"text":220,"correct":29},"A：投标文件没有投标单位项目经理签字",{"key":24,"text":222,"correct":29},"B：大写金额与小写金额不一致",{"key":27,"text":224,"correct":22},"C：明显不符合技术规格、技术标准的要求",{"key":31,"text":226,"correct":22},"D：投标文件载明的招标项目完成期限超过招标文件规定的期限",{"key":34,"text":228,"correct":22},"E：投标文件载明的货物包装方式、检验标准和方法等不符合招标文件的要求","CDE",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},910852,"根据FIDIC《土木工程施工合同条件》，下列关于DAB对争端的裁决的说法正确的是（ ）。",[234,236,238,240,242],{"key":20,"text":235,"correct":29},"A：DAB在收到书面报告后28天内对争端作出裁决，并说明理由",{"key":24,"text":237,"correct":29},"B：如果合同一方对DAB的裁决不满，则应在收到裁决后的84天内向合同对方发出表示不满的通知，并说明理由",{"key":27,"text":239,"correct":22},"C：如果双方接受DAB的裁决，则该裁决将成为最终的决定并对合同双方均具有约束力",{"key":31,"text":241,"correct":22},"D：DAB的裁决作出后，在未通过友好解决或仲裁改变该裁决之前，双方应当执行该裁决",{"key":34,"text":243,"correct":29},"E：DAB的裁决作出后，如果合同一方对DAB的裁决不满，可暂缓执行该裁决","CD",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":214,"analysis":37},910853,"投标文件对招标文件的响应性审查的内容包括（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":22},"A：投标内容是否与投标人须知中的工程或标段一致",{"key":24,"text":252,"correct":22},"B：承诺的工期可以比招标工期短，但不得超过要求的时间",{"key":27,"text":254,"correct":22},"C：提交的投标保证金形式和金额是否符合投标须知的规定",{"key":31,"text":256,"correct":22},"D：投标文件是否对招标文件中的技术标准和要求提出不同意见",{"key":34,"text":258,"correct":29},"E：报价的唯一性审查",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":214,"analysis":37},910854,"根据FIDIC《土木工程施工合同条件》，业主可凭履约担保索赔的情形包括（ ）。",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"A：专用条款约定的缺陷通知期满后仍未能解除承包商的保修义务时，承包商应延长履约保函有效期而未延长",{"key":24,"text":266,"correct":22},"B：按照业主索赔或争议、仲裁等决定，承包商未向业主支付相应款项",{"key":27,"text":268,"correct":22},"C：缺陷通知期内承包商接到业主修补缺陷通知后42天内未派人修补",{"key":31,"text":270,"correct":22},"D：由于承包商的严重违约行为业主终止合同",{"key":34,"text":272,"correct":29},"E：承包商没有按照约定的期限履行缺陷修复义务",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":286,"analysis":37},910855,"根据FIDIC《土木工程施工合同条件》，应根据承包商的请求，应提供合理协助的情形是指（ ）。",[277,279,281,283,284],{"key":20,"text":278,"correct":22},"A：取得与合同有关但不易得到的工程所在国的法律文本",{"key":24,"text":280,"correct":22},"B：协助承包商申请工程所在国要求的许可、执照或批准",{"key":27,"text":282,"correct":29},"C：审查批准承包商的施工进度计划",{"key":31,"text":137,"correct":29},{"key":34,"text":285,"correct":29},"E：发布开工令、暂停施工令、复工令和赶工令","AB",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},910856,"根据《标准施工招标文件》，下列因不可抗力导致的后果中，由发包人承担责任的有（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"A：已运至施工场地的材料的损害",{"key":24,"text":294,"correct":29},"B：承包人的停工损失",{"key":27,"text":296,"correct":22},"C：因工程损害造成的第三者财产损失",{"key":31,"text":298,"correct":22},"D：停工期间承包人应监理人要求照管工程的费用",{"key":34,"text":300,"correct":29},"E：承包人设备的损坏","ACD",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":52,"analysis":37},910857,"根据相关规定，下列关于评标委员会的说法中，正确的是（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"A：评标委员会由招标单位代表及有关技术、经济等方面的专家组成",{"key":24,"text":309,"correct":22},"B：评标委员会成员应为5人以上单数",{"key":27,"text":311,"correct":22},"C：评标委员会成员中，技术、经济等方面的专家不得少于成员总数的2\u002F3",{"key":31,"text":313,"correct":29},"D：评标委员会的负责人只能由招标单位确定",{"key":34,"text":315,"correct":22},"E：评标委员会的负责人可以由评标委员会成员推举",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":155,"analysis":37},910858,"根据《标准施工招标文件》的相关规定，在履行合同过程中发生争议，采用争议评审方式的，发包人和承包人应在（ ），协商成立争议评审组。",[320,322,324,326,328],{"key":20,"text":321,"correct":22},"A：开工日后的28天内",{"key":24,"text":323,"correct":29},"B：订立施工合同后",{"key":27,"text":325,"correct":29},"C：开工之日",{"key":31,"text":327,"correct":29},"D：施工合同生效后",{"key":34,"text":329,"correct":22},"E：争议发生后",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},910859,"由于发包人下列（ ）原因造成工期延误的，承包人有权要求发包人延长工期和增加费用，并支付合理利润。",[334,336,338,340,342],{"key":20,"text":335,"correct":29},"A：发包人提出索赔要求",{"key":24,"text":337,"correct":22},"B：发包人增加合同工作内容",{"key":27,"text":339,"correct":22},"C：发包人延迟提供材料",{"key":31,"text":341,"correct":22},"D：发包人提供图纸有误",{"key":34,"text":343,"correct":22},"E：发包人未按合同约定及时支付进度款","BCDE",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":67,"analysis":37},910860,"下列工程项目中，不宜采用固定总价合同的有（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"A：建设规模大且技术复杂的工程项目",{"key":24,"text":352,"correct":29},"B：施工图纸和工程量清单详细而明确的项目",{"key":27,"text":354,"correct":22},"C：施工中有较大部分采用新技术，且施工单位缺乏经验的项目",{"key":31,"text":356,"correct":22},"D：施工工期紧的紧急工程项目",{"key":34,"text":358,"correct":22},"E：承包风险较大，各项费用不易准确估算的项目",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":155,"analysis":37},910861,"通常情况下，评标委员会在对投标文件进行进一步评审时的评标方法有（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"A：经评审的最低投标价法",{"key":24,"text":366,"correct":29},"B：项目经济效益评价法",{"key":27,"text":368,"correct":29},"C：项目成本效益费用评审法",{"key":31,"text":370,"correct":29},"D：挣值法",{"key":34,"text":372,"correct":22},"E：综合评估法",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":214,"analysis":37},910862,"合同类型不同，合同双方的义务和责任不同，各自承担的风险也不尽相同。建设单位选择适合的合同类型应综合考虑的因素包括（ ）。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"A：工程项目的复杂程度",{"key":24,"text":380,"correct":22},"B：工程项目的设计深度",{"key":27,"text":382,"correct":22},"C：施工技术的先进程度",{"key":31,"text":384,"correct":22},"D：施工工期的紧迫程度",{"key":34,"text":386,"correct":29},"E：工程项目资金的准备充分程度",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":36,"analysis":37},910863,"投标单位报价可高一些的情形包括（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"A：施工条件差的工程",{"key":24,"text":394,"correct":22},"B：专业要求高的技术密集型工程且投标单位在这方面有专长",{"key":27,"text":396,"correct":29},"C：附近有工程而本项目可利用该工程的设备",{"key":31,"text":398,"correct":29},"D：投标对手多，竞争激烈的工程",{"key":34,"text":400,"correct":22},"E：支付条件不理想的工程",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":415,"analysis":37},910864,"根据《标准施工招标文件》，关于材料和工程设备验收的说法中，正确的有（）。",[405,407,409,411,413],{"key":20,"text":406,"correct":29},"对承包人提供的材料，监理人应单独进行检验和交货验收",{"key":24,"text":408,"correct":29},"监理人应进行材料的抽样检验，所需费用由承包人承担",{"key":27,"text":410,"correct":29},"发包人提供的材料和工程设备的发包人要求向承包人提前交货，承包人有权拒绝",{"key":31,"text":412,"correct":22},"发包人提供的材料的，承包人要求更改交货日期的，应事先报请监理人批准",{"key":34,"text":414,"correct":22},"发包人提供的材料或工程设备不符合合同要求的，承包人有权拒绝","DE",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":111,"analysis":37},910865,"对使用国有资金投资或者国家融资的项目，招标单位可确定排名第二的中标候选人为中标单位的情形包括（）。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"排名第一的中标候选人放弃中标",{"key":24,"text":423,"correct":29},"排名第二的中标候选人有专业特长的",{"key":27,"text":425,"correct":22},"排名第一的中标候选人在规定的期限内未能提交履约保证金",{"key":31,"text":427,"correct":29},"排名第二的中标候选人同意以更低价格订立合同",{"key":34,"text":429,"correct":22},"排名第一的中标候选人因不可抗力提出不能履行合同",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":444,"analysis":37},910867,"从工地管理角度看，分标时应考虑的因素是指( )。",[434,436,438,440,442],{"key":20,"text":435,"correct":29},"工程量的大小",{"key":24,"text":437,"correct":29},"劳动力、材料、设备的调配",{"key":27,"text":439,"correct":22},"工程进度的衔接",{"key":31,"text":441,"correct":29},"建设资金、设计图纸供应",{"key":34,"text":443,"correct":22},"工地现场的布置和干扰","CE",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":155,"analysis":37},910868,"在履行合同过程中发生争议，采用争议评审方式的，发包人和承包人应在（ ），协商成立争议评审组。",[449,451,453,455,457],{"key":20,"text":450,"correct":22},"开工日后的28天内",{"key":24,"text":452,"correct":29},"订立施工合同后",{"key":27,"text":454,"correct":29},"开工之日",{"key":31,"text":456,"correct":29},"施工合同生效后",{"key":34,"text":458,"correct":22},"争议发生后",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":214,"analysis":37},910869,"投标文件对招标文件的响应性审查的内容包括（）。",[463,465,467,469,471],{"key":20,"text":464,"correct":22},"核查已标价的工程量清单",{"key":24,"text":466,"correct":22},"承诺的工期可以比招标工期短，但不得超过要求的时间",{"key":27,"text":468,"correct":22},"投标文件是否对招标文件中的技术标准和要求提出不同意见",{"key":31,"text":470,"correct":22},"工程质量的承诺和质量管理体系应满足要求",{"key":34,"text":472,"correct":29},"报价的唯一性审查",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":286,"analysis":37},910870,"根据《标准施工招标文件》，在招标方式中，邀请招标与公开招标比较，其缺点主要有（）等。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"有可能排除某些在技术上或报价上有竞争力的承包商参与投标",{"key":24,"text":480,"correct":22},"投标竞争的激烈程度较差",{"key":27,"text":482,"correct":29},"招标时间长",{"key":31,"text":484,"correct":29},"对投标申请者进行评标的工作量大",{"key":34,"text":486,"correct":29},"招标费用高",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":170,"analysis":37},910871,"某工程施工至某月底，经偏差分析得到费用偏差（CV）0，进度偏差（SV）0，则表明（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":29},"已完工程实际费用节约",{"key":24,"text":494,"correct":22},"已完工程实际费用>已完工程计划费用",{"key":27,"text":496,"correct":29},"拟完工程计划费用>已完工程实际费用",{"key":31,"text":498,"correct":29},"已完工程实际进度超前",{"key":34,"text":500,"correct":22},"拟完工程计划费用>已完工程计划费用",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":229,"analysis":37},910872,"施工合同签订后，工程项目施工成本计划的常用编制方法有（ ）。",[505,507,509,511,513],{"key":20,"text":506,"correct":29},"A：专家意见法",{"key":24,"text":508,"correct":29},"B：功能指数法",{"key":27,"text":510,"correct":22},"C：目标利润法",{"key":31,"text":512,"correct":22},"D：技术进步法",{"key":34,"text":514,"correct":22},"E：定率估算法",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":111,"analysis":37},910873,"进行施工成本对比分析时，可采用的对比方式有（ ）。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"A：本期实际值与目标值对比",{"key":24,"text":522,"correct":29},"B：本期实际值与上期目标值对比",{"key":27,"text":524,"correct":22},"C：本期实际值与上期实际值对比",{"key":31,"text":526,"correct":29},"D：本期目标值与上期实际值对比",{"key":34,"text":528,"correct":22},"E：本期实际值与行业先进水平对比",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":185,"analysis":37},910874,"资金使用计划的编制与控制对工程造价水平有着重要影响。按工程造价构成编制的资金使用计划分为（ ）。",[533,535,537,539,541],{"key":20,"text":534,"correct":29},"A：工程直接费使用计划",{"key":24,"text":536,"correct":22},"B：建筑安装工程费使用计划",{"key":27,"text":538,"correct":22},"C：设备工器具费使用计划",{"key":31,"text":540,"correct":22},"D：工程建设其他费使用计划",{"key":34,"text":542,"correct":29},"E：工程间接费使用计划",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":557,"analysis":37},910875,"施工成本管理中成本核算的方法包括（ ）。",[547,549,551,553,555],{"key":20,"text":548,"correct":29},"A：同步核算法",{"key":24,"text":550,"correct":22},"B：表格核算法",{"key":27,"text":552,"correct":22},"C：会计核算法",{"key":31,"text":554,"correct":29},"D：价值工程法",{"key":34,"text":556,"correct":29},"E：技术进步法","BC",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":572,"analysis":37},910876,"单位工程竣工成本分析，应当包括（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":22},"A：竣工成本分析",{"key":24,"text":565,"correct":22},"B：主要资源节超对比分析",{"key":27,"text":567,"correct":29},"C：效益成本费用分析",{"key":31,"text":569,"correct":22},"D：主要技术节约措施及经济效果分析",{"key":34,"text":571,"correct":29},"E：目标成本效益分析","ABD",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":67,"analysis":37},910877,"施工单位工程索赔产生的原因包括（ ）。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"A：业主方违约",{"key":24,"text":580,"correct":29},"B：承包方违约",{"key":27,"text":582,"correct":22},"C：合同缺陷",{"key":31,"text":584,"correct":22},"D：工程环境变化",{"key":34,"text":586,"correct":22},"E：不可抗力",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":601,"analysis":37},910878,"作为施工项目成本核算的方法之一，表格核算法的特点有（ ）。",[591,593,595,597,599],{"key":20,"text":592,"correct":22},"A：易于操作",{"key":24,"text":594,"correct":29},"B：逻辑性强",{"key":27,"text":596,"correct":29},"C：核算范围大",{"key":31,"text":598,"correct":22},"D：适时性较好",{"key":34,"text":600,"correct":22},"E：直观易懂","ADE",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":96,"analysis":37},910879,"工程项目施工过程中的综合成本分析包括（ ）。",[606,608,610,612,614],{"key":20,"text":607,"correct":29},"A：检验批施工成本分析",{"key":24,"text":609,"correct":22},"B：分部分项工程成本分析",{"key":27,"text":611,"correct":29},"C：单位工程施工成本分析",{"key":31,"text":613,"correct":22},"D：月（季）度施工成本分析",{"key":34,"text":615,"correct":29},"E：建设项目决算成本分析",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":155,"analysis":37},910880,"关于分部分项工程成本分析资料来源的说法，正确的有（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":22},"预算成本以施工图和定额为依据确定",{"key":24,"text":623,"correct":29},"预算成本的各种信息是成本核算的依据",{"key":27,"text":625,"correct":29},"计划成本通过目标成本与预算成本的比较来确定",{"key":31,"text":627,"correct":29},"实际成本来自实际工程量、实耗人工和实耗材料",{"key":34,"text":629,"correct":22},"目标成本是分解到分部分项工程上的计划成本",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":444,"analysis":37},910881,"《标准施工招标文件》合同条款中，属于不利物质条件的有（ ）。",[634,636,638,640,642],{"key":20,"text":635,"correct":29},"A：施工期间遭遇洪水",{"key":24,"text":637,"correct":29},"B：进场道路出现塌方",{"key":27,"text":639,"correct":22},"C：遇到已废弃的地下管道",{"key":31,"text":641,"correct":29},"D：施工现场遇暴雪袭击",{"key":34,"text":643,"correct":22},"E：隧道掘进遇瓦斯突出",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":244,"analysis":37},910882,"按工程项目组成编制施工阶段资金使用计划时，建筑安装工程费中可直接分解到各个工程分项的费用有（ ）。",[648,650,652,654,656],{"key":20,"text":649,"correct":29},"A：企业管理费",{"key":24,"text":651,"correct":29},"B：临时设施费",{"key":27,"text":653,"correct":22},"C：材料费",{"key":31,"text":655,"correct":22},"D：施工机具使用费",{"key":34,"text":657,"correct":29},"E：职工养老保险费",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":96,"analysis":37},910883,"按工程项目组成编制施工阶段资金使用计划时，不能分解到各个工程分项的费用有（ ）。",[662,664,666,668,670],{"key":20,"text":663,"correct":29},"A：人工费",{"key":24,"text":665,"correct":22},"B：保险费",{"key":27,"text":667,"correct":29},"C：二次搬运费",{"key":31,"text":669,"correct":22},"D：临时设施费",{"key":34,"text":671,"correct":29},"E：施工机具使用费",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":444,"analysis":37},910884,"工程索赔中不属于意外风险和不可预见因素索赔的包括（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":29},"A：溶洞",{"key":24,"text":679,"correct":29},"B：地下障碍物",{"key":27,"text":681,"correct":22},"C：货币贬值",{"key":31,"text":683,"correct":29},"D：地下水",{"key":34,"text":685,"correct":22},"E：汇率变化",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":214,"analysis":37},910885,"工程费用的动态监控中常用的偏差分析方法包括（ ）。",[690,692,694,696,698],{"key":20,"text":691,"correct":22},"A：横道图法",{"key":24,"text":693,"correct":22},"B：时标网络图法",{"key":27,"text":695,"correct":22},"C：表格法",{"key":31,"text":697,"correct":22},"D：曲线法",{"key":34,"text":699,"correct":29},"E：双代号网络图法",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":185,"analysis":37},910886,"施工成本管理中成本分析的基本方法包括（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":29},"A：挣值分析法",{"key":24,"text":707,"correct":22},"B：比较法",{"key":27,"text":709,"correct":22},"C：因素分析法",{"key":31,"text":711,"correct":22},"D：差额计算法",{"key":34,"text":514,"correct":29},{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":214,"analysis":37},910887,"企业对项目经理部可控责任成本的考核包括（ ），",[717,719,721,723,725],{"key":20,"text":718,"correct":22},"A：项目成本目标和阶段成本目标完成情况",{"key":24,"text":720,"correct":22},"B：建立以项目经理为核心的成本管理责任制的落实情况",{"key":27,"text":722,"correct":22},"C：成本计划的编制和落实情况",{"key":31,"text":724,"correct":22},"D：在成本管理中贯彻责权利结合原则的执行情况",{"key":34,"text":726,"correct":29},"E：对各分包工程的检查情况",{"id":728,"libraryId":5,"type":15,"typeLabel":16,"stem":729,"options":730,"answer":155,"analysis":37},910888,"不利的物质条件通常是指（）。",[731,733,735,737,739],{"key":20,"text":732,"correct":22},"非自然的物质障碍和污染物",{"key":24,"text":734,"correct":29},"国家政策、法律、法令的变更",{"key":27,"text":736,"correct":29},"水灾",{"key":31,"text":738,"correct":29},"海啸",{"key":34,"text":740,"correct":22},"不可预见的自然物质条件",[742,746,749,752,755,758],{"id":743,"name":744,"category":7,"favorite":745},1,"领导干部任职前廉政法规知识测试题",92,{"id":747,"name":748,"category":7,"favorite":743},595,"建筑结构与设备",{"id":750,"name":751,"category":7,"favorite":743},715,"招标采购专业知识与法律法规",{"id":753,"name":754,"category":7,"favorite":743},848,"市政方向-通用基础",{"id":756,"name":757,"category":7,"favorite":8},534,"BIM工程师",{"id":759,"name":757,"category":7,"favorite":8},535]