[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-52":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":682},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,52,50,2821,[13,38,53,68,82,97,112,126,141,156,171,186,199,212,223,234,249,263,273,288,302,313,328,342,356,370,381,391,400,412,421,435,448,462,476,490,504,519,534,548,559,574,587,601,614,624,635,645,657,668],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},910687,2,"多选题","在工程经济分析中，影响资金等值的因素有（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","资金多少",true,{"key":24,"text":25,"correct":22},"B","资金发生的时间",{"key":27,"text":28,"correct":29},"C","资金支付方式",false,{"key":31,"text":32,"correct":29},"D","货币种类",{"key":34,"text":35,"correct":22},"E","利率的大小","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},910688,"关于年有效利率的说法，正确的有（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"当每年计息周期数大于1时，名义利率大于年有效利率",{"key":24,"text":45,"correct":22},"年有效利率比名义利率更能准确反映资金的时间价值",{"key":27,"text":47,"correct":29},"名义利率一定，计息周期越短，年有效利率与名义利率差异越小",{"key":31,"text":49,"correct":22},"名义利率为r，一年内计息m次，则计息周期利率为r／m",{"key":34,"text":51,"correct":22},"当每年计息周期数等于1时，年有效利率等于名义利率","BDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},910689,"采用内部收益率指标评价投资方案经济效果的优越性在于（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"能够反映项目在整个计算期内的经济状况",{"key":24,"text":60,"correct":22},"能够直接衡量项目未回收投资的收益率",{"key":27,"text":62,"correct":29},"能够直接反映项目运营期各年的利润率",{"key":31,"text":64,"correct":22},"只需确定基准收益率的大致范围",{"key":34,"text":66,"correct":29},"不需要与投资方案相关的大量数据","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":52,"analysis":37},910690,"采用动态方法评价计算期相同的互斥方案经济效果时，选择最佳方案的准则有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"增量投资收益率大于基准投资收益率时投资额大的方案",{"key":24,"text":75,"correct":22},"增量投资内部收益率大于基准收益率时投资额大的方案",{"key":27,"text":77,"correct":29},"增量投资回收期小于基准投资回收期时投资额大的方案",{"key":31,"text":79,"correct":22},"净现值非负且其值为最大的方案",{"key":34,"text":81,"correct":22},"净年值非负且其值为最大的方案",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},910691,"应用净现值指标评价投资方案经济效果的优越性有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":29},"能够直观反映项目单位投资的使用效率",{"key":24,"text":89,"correct":22},"能够全面考虑项目在整个计算期内的经济状况",{"key":27,"text":91,"correct":29},"能够直接说明项目运营期各年的经营成果",{"key":31,"text":93,"correct":29},"能够全面反映项目投资过程的收益程度",{"key":34,"text":95,"correct":22},"能够直接以金额表示项目的盈利水平","BE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},910692,"净现值和内部收益率作为评价经济方案经济效果的主要指标，二者的共同特点包括（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"均考虑了项目在计算期内的经济状况",{"key":24,"text":104,"correct":29},"均取决于投资过程的现金流量而不受外部参数的影响",{"key":27,"text":106,"correct":22},"均可用于独立方案的评价，并且结论是一致的",{"key":31,"text":108,"correct":29},"均能够反映投资过程的收益程度",{"key":34,"text":110,"correct":29},"均能直接反映项目在运营期间各年的经营情况","AC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":36,"analysis":37},910693,"某投资方案单因素敏感性分析如下图所示，图中表明的正确结论有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"净现值对建设投资波动最敏感",{"key":24,"text":119,"correct":22},"初始方案的净现值为128万元",{"key":27,"text":121,"correct":29},"净现值对经营成本变动的敏感性高于对产品价格变动的敏感性",{"key":31,"text":123,"correct":29},"为保证项目可行，投资方案不确定性因素变动幅度最大不超过8%",{"key":34,"text":125,"correct":22},"按净现值判断，产品价格变动临界点比初始方案价格下降7%",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},910694,"影响基准收益率的因素有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"资金成本",{"key":24,"text":133,"correct":22},"机会成本",{"key":27,"text":135,"correct":22},"投资风险",{"key":31,"text":137,"correct":22},"通货膨胀因素",{"key":34,"text":139,"correct":29},"投资规模","ABCD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},910695,"下列哪些属于偿债能力指标（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":29},"投资回收期",{"key":24,"text":148,"correct":29},"内部收益率",{"key":27,"text":150,"correct":22},"利息备付率",{"key":31,"text":152,"correct":22},"偿债备付率",{"key":34,"text":154,"correct":22},"资产负债率","CDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},910696,"计算期不同的互斥方案经济效果的动态评价方法包括（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"最小公倍数法",{"key":24,"text":163,"correct":22},"研究期法",{"key":27,"text":165,"correct":22},"增量内部收益率法",{"key":31,"text":167,"correct":29},"综合总费用法",{"key":34,"text":169,"correct":29},"增量投资收益率法","ABC",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},910697,"下列关于内部收益率的说法中，正确的有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":29},"内部收益率是项目初始投资在整个计算期内的盈利率",{"key":24,"text":178,"correct":22},"内部收益率是项目占用尚未回收资金的获利能力",{"key":27,"text":180,"correct":29},"内部收益率的计算简单且不受外部参数影响",{"key":31,"text":182,"correct":22},"内部收益率能够反映投资过程的收益程度",{"key":34,"text":184,"correct":29},"任何项目的内部收益率是唯一的","BD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":198,"analysis":37},910698,"建设工程项目的现金流量按当年价格预测时，确定基准收益率需要考虑的因素包括（ ）。",[190,192,194,195,197],{"key":20,"text":191,"correct":29},"投资周期",{"key":24,"text":193,"correct":22},"通货膨胀",{"key":27,"text":135,"correct":22},{"key":31,"text":196,"correct":29},"经营规模",{"key":34,"text":133,"correct":22},"BCE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":198,"analysis":37},910699,"下列评价方法中，用于互斥投资方案静态分析评价的有（ ）。",[203,205,206,208,210],{"key":20,"text":204,"correct":29},"增量投资内部收益率法",{"key":24,"text":169,"correct":22},{"key":27,"text":207,"correct":22},"增量投资回收期法",{"key":31,"text":209,"correct":29},"净年值法",{"key":34,"text":211,"correct":22},"年折算费用法",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":222,"analysis":37},910700,"下列影响因素中，属于确定基准收益率基础因素的有（ ）。",[216,217,218,220,221],{"key":20,"text":131,"correct":22},{"key":24,"text":135,"correct":29},{"key":27,"text":219,"correct":29},"周转速度",{"key":31,"text":133,"correct":22},{"key":34,"text":193,"correct":29},"AD",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":198,"analysis":37},910701,"在下列投资项目评价指标中，属于静态评价指标的有（ ）。",[227,229,230,232,233],{"key":20,"text":228,"correct":29},"净年值",{"key":24,"text":154,"correct":22},{"key":27,"text":231,"correct":22},"投资收益率",{"key":31,"text":148,"correct":29},{"key":34,"text":152,"correct":22},{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":248,"analysis":37},910702,"关于投资回收期指标优缺点的说法，正确的有（ ）。",[238,240,242,244,246],{"key":20,"text":239,"correct":29},"计算简便，但其包含的经济意义不明确",{"key":24,"text":241,"correct":22},"不能全面反映方案整个计算期内的现金流量",{"key":27,"text":243,"correct":22},"在一定程度上显示了资本的周转速度",{"key":31,"text":245,"correct":29},"可以独立用于投资方案的选择",{"key":34,"text":247,"correct":29},"可以独立用于投资项目的排队","BC",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":222,"analysis":37},910703,"下列关于投资方案经济效果评价指标的说法中，正确的有（ ）。",[253,255,257,259,261],{"key":20,"text":254,"correct":22},"投资收益率在一定程度上反映了投资效果的优劣",{"key":24,"text":256,"correct":29},"投资收益率不适用于评价投资规模较大的项目",{"key":27,"text":258,"correct":29},"净现值能够反映投资方案中单位投资的使用效率",{"key":31,"text":260,"correct":22},"净现值和内部收益率均考虑了整个计算期的经济状况",{"key":34,"text":262,"correct":29},"内部收益率不能直接衡量项目未回收投资的收益率",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":248,"analysis":37},910704,"反映投资方案盈利能力的动态评价指标有（ ）。",[267,268,269,271,272],{"key":20,"text":231,"correct":29},{"key":24,"text":148,"correct":22},{"key":27,"text":270,"correct":22},"净现值率",{"key":31,"text":150,"correct":29},{"key":34,"text":152,"correct":29},{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":287,"analysis":37},910705,"线性盈亏平衡分析的前提条件包括（ ）。",[277,279,281,283,285],{"key":20,"text":278,"correct":29},"项目可行",{"key":24,"text":280,"correct":22},"生产量等于销售量",{"key":27,"text":282,"correct":22},"销售价格不变",{"key":31,"text":284,"correct":22},"单位可变成本不变",{"key":34,"text":286,"correct":29},"销售量不变","BCD",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":198,"analysis":37},910706,"下列关于投资方案偿债能力指标的说法中，正确的有（ ）。",[292,294,296,298,300],{"key":20,"text":293,"correct":29},"借款偿还期指标适用于给定借款偿还期的项目",{"key":24,"text":295,"correct":22},"利息备付率反映投资方案偿付债务利息的保障程度",{"key":27,"text":297,"correct":22},"偿债备付率反映可用于还本付息的资金偿还借款本息保障程度",{"key":31,"text":299,"correct":29},"利息备付率和偿债备付率均应小于1",{"key":34,"text":301,"correct":22},"利息备付率和偿债备付率均应分年计算",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":312,"analysis":37},910707,"下列评价指标中，属于投资方案经济效果动态评价指标的有（ ）。",[306,307,308,310,311],{"key":20,"text":148,"correct":22},{"key":24,"text":150,"correct":29},{"key":27,"text":309,"correct":29},"投资效益率",{"key":31,"text":154,"correct":29},{"key":34,"text":270,"correct":22},"AE",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":327,"analysis":37},910708,"下列关于NPV指标的说明，正确的有（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"NPV指标能够直接以货币额表示项目的盈利水平",{"key":24,"text":320,"correct":22},"在互斥方案评价时，必须考虑互斥方案的寿命",{"key":27,"text":322,"correct":29},"NPV指标的计算只与项目的现金流量有关",{"key":31,"text":324,"correct":22},"NPV指标不能反映单位投资的使用效率",{"key":34,"text":326,"correct":22},"NPV指标不能直接说明在项目运营期间各年的经营成果","ABDE",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":111,"analysis":37},910709,"投资项目财务评价中的不确定性分析有（ ）。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"盈亏平衡分析",{"key":24,"text":335,"correct":29},"增长率分析",{"key":27,"text":337,"correct":22},"敏感性分析",{"key":31,"text":339,"correct":29},"发展速度分析",{"key":34,"text":341,"correct":29},"均值分析",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":111,"analysis":37},910710,"某投资方案的净现值与折现率之间的关系如下图所示。图中表明的正确结论有（ ）。",[346,348,350,352,354],{"key":20,"text":347,"correct":22},"投资方案的内部收益率为i2",{"key":24,"text":349,"correct":29},"折现率i越大，投资方案的净现值越大",{"key":27,"text":351,"correct":22},"基准收益率为i1时，投资方案的净现值为NPV1",{"key":31,"text":353,"correct":29},"投资方案的累计净现金流量为NPV0",{"key":34,"text":355,"correct":29},"投资方案计算期内累计利润为正值",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":198,"analysis":37},910711,"采用净现值和内部收益率指标评价投资方案经济效果的共同特点有（ ）。",[360,362,364,366,368],{"key":20,"text":361,"correct":29},"均受外部参数的影响",{"key":24,"text":363,"correct":22},"均考虑资金的时间价值",{"key":27,"text":365,"correct":22},"均可对独立方案进行评价",{"key":31,"text":367,"correct":29},"均能反映投资回收过程的收益程度",{"key":34,"text":369,"correct":22},"均能全面考虑整个计算期内经济状况",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":380,"analysis":37},910712,"对于计算期不同的互斥方案，可采用的经济效果动态评价方法有（ ）。",[374,375,377,378,379],{"key":20,"text":169,"correct":29},{"key":24,"text":376,"correct":29},"净值法",{"key":27,"text":207,"correct":29},{"key":31,"text":209,"correct":22},{"key":34,"text":204,"correct":22},"DE",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":222,"analysis":37},910714,"根据是否考虑资金时间价值，经济效果评价指标可分为静态评价指标和动态评价指标，下列指标中，属于动态评价指标的有（ ）。",[385,386,387,389,390],{"key":20,"text":148,"correct":22},{"key":24,"text":231,"correct":29},{"key":27,"text":388,"correct":29},"资本金净利润率",{"key":31,"text":228,"correct":22},{"key":34,"text":154,"correct":29},{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":393,"answer":140,"analysis":37},910715,[394,395,397,398,399],{"key":20,"text":131,"correct":22},{"key":24,"text":396,"correct":22},"投资机会成本",{"key":27,"text":135,"correct":22},{"key":31,"text":137,"correct":22},{"key":34,"text":139,"correct":29},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":411,"analysis":37},910716,"下列评价方法中，属于互斥型投资方案经济效果动态评价方法的有（）。",[404,405,406,407,409],{"key":20,"text":204,"correct":22},{"key":24,"text":211,"correct":29},{"key":27,"text":207,"correct":29},{"key":31,"text":408,"correct":22},"方案重复法",{"key":34,"text":410,"correct":22},"无限计算期法","ADE",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":111,"analysis":37},910717,"净现值和内部收益率作为评价经济方案经济效果的主要指标，二者的共同特点包括（）。",[416,417,418,419,420],{"key":20,"text":102,"correct":22},{"key":24,"text":104,"correct":29},{"key":27,"text":106,"correct":22},{"key":31,"text":108,"correct":29},{"key":34,"text":110,"correct":29},{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":52,"analysis":37},910718,"在工程经济分析中，内部收益率是考察项目盈利能力的主要评价指标，该指标的特点包括（）。",[425,427,429,431,433],{"key":20,"text":426,"correct":29},"内部收益率需要事先设定一个基准收益率来确定",{"key":24,"text":428,"correct":22},"内部收益率考虑了资金的时间价值以及项目在整个计算期内的经济状况",{"key":27,"text":430,"correct":29},"内部收益率能够直接衡量项目初期投资的收益程度",{"key":31,"text":432,"correct":22},"内部收益率不受外部参数的影响，完全取决于投资过程的现金流量",{"key":34,"text":434,"correct":22},"对于具有非常规现金流量的项目而言，其内部收益率往往不是唯一的",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":198,"analysis":37},910719,"有三项投资，资料如下，要比较哪项投资有利，可以使用的方法是（）。",[439,441,443,444,446],{"key":20,"text":440,"correct":29},"NPV法",{"key":24,"text":442,"correct":22},"NAV法",{"key":27,"text":161,"correct":22},{"key":31,"text":445,"correct":29},"IRR法",{"key":34,"text":447,"correct":22},"△IRR法",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":140,"analysis":37},910720,"对经营性技术方案，经济效果评价的内容包括（）。",[452,454,456,458,460],{"key":20,"text":453,"correct":22},"盈利能力",{"key":24,"text":455,"correct":22},"偿债能力",{"key":27,"text":457,"correct":22},"抗风险能力",{"key":31,"text":459,"correct":22},"财务生存能力",{"key":34,"text":461,"correct":29},"可持续运行能力",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":287,"analysis":37},910721,"价值工程活动中的不必要功能包括（ ）。",[466,468,470,472,474],{"key":20,"text":467,"correct":29},"辅助功能",{"key":24,"text":469,"correct":22},"多余功能",{"key":27,"text":471,"correct":22},"重复功能",{"key":31,"text":473,"correct":22},"过剩功能",{"key":34,"text":475,"correct":29},"不足功能",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":67,"analysis":37},910722,"价值指数V1＞1，可能出现这种情况的原因有（ ）。",[480,482,484,486,488],{"key":20,"text":481,"correct":22},"目前成本偏低，不能满足评价对象应具有的功能要求",{"key":24,"text":483,"correct":22},"功能过剩，已经超过了其应该有的水平",{"key":27,"text":485,"correct":29},"功能成本比较好，正是价值分析所追求的目标",{"key":31,"text":487,"correct":22},"功能很重要，但成本较低，不必列为改进对象",{"key":34,"text":489,"correct":29},"实现功能的条件或方法不佳，致使成本过高",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":67,"analysis":37},910723,"价值工程涉及价值、功能和寿命周期成本三个基本要素，其特点包括（ ）。",[494,496,498,500,502],{"key":20,"text":495,"correct":22},"价值工程的核心是对产品功能进行分析",{"key":24,"text":497,"correct":22},"价值工程要求将功能定量化，即将功能转化为能够与成本直接相比的量化值",{"key":27,"text":499,"correct":29},"价值工程的目标是以最低的生产成本使产品具备其所必须具备的功能",{"key":31,"text":501,"correct":22},"价值工程是以集体的智慧开展的有计划、有组织的管理活动",{"key":34,"text":503,"correct":29},"价值工程中的价值是指对象的使用价值，而不是交换价值",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":518,"analysis":37},910724,"下面关于功能分析说法正确的有（ ）。",[508,510,512,514,516],{"key":20,"text":509,"correct":22},"功能分析是价值工程的核心",{"key":24,"text":511,"correct":29},"功能分析的目的是量化功能值",{"key":27,"text":513,"correct":22},"功能分析的目的是弄清功能之间的关系，调整功能间比重，使产品的功能结构更合理",{"key":31,"text":515,"correct":29},"功能分析只分析重要功能",{"key":34,"text":517,"correct":22},"功能分析的依据是功能系统图","ACE",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":533,"analysis":37},910725,"下列关于投资项目不确定性分析的说法中，正确的有（ ）。",[523,525,527,529,531],{"key":20,"text":524,"correct":22},"盈亏平衡分析只适用于项目的财务评价",{"key":24,"text":526,"correct":29},"敏感性分析只适用于项目的财务评价",{"key":27,"text":528,"correct":22},"风险分析可同时用于项目的财务评价和国民经济评价",{"key":31,"text":530,"correct":22},"盈亏平衡点反映了项目的抗风险能力",{"key":34,"text":532,"correct":22},"敏感性分析指标应与确定性经济指标相一致","ACDE",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":327,"analysis":37},910726,"在应用价值工程过程中，可用来确定产品功能重要性系数的方法有（ ）。",[538,540,542,544,546],{"key":20,"text":539,"correct":22},"逻辑评分法",{"key":24,"text":541,"correct":22},"环比评分法",{"key":27,"text":543,"correct":29},"百分比评分法",{"key":31,"text":545,"correct":22},"强制评分法",{"key":34,"text":547,"correct":22},"多比例评分法",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":111,"analysis":37},910727,"价值工程活动中，按功能的重要程度不同，产品的功能可分为（ ）。",[552,554,556,557,558],{"key":20,"text":553,"correct":22},"基本功能",{"key":24,"text":555,"correct":29},"必要功能",{"key":27,"text":467,"correct":22},{"key":31,"text":473,"correct":29},{"key":34,"text":475,"correct":29},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":573,"analysis":37},910728,"下列方法中，可在价值工程活动中用于方案创造的有（ ）。",[563,565,567,569,571],{"key":20,"text":564,"correct":22},"专家检查法",{"key":24,"text":566,"correct":22},"专家意见法",{"key":27,"text":568,"correct":29},"流程图法",{"key":31,"text":570,"correct":29},"列表比较法",{"key":34,"text":572,"correct":29},"方案清单法","AB",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":533,"analysis":37},910729,"价值工程研究对象的功能量化方法有（ ）。",[578,580,581,583,585],{"key":20,"text":579,"correct":22},"类比类推法",{"key":24,"text":568,"correct":29},{"key":27,"text":582,"correct":22},"理论计算法",{"key":31,"text":584,"correct":22},"技术测定法",{"key":34,"text":586,"correct":22},"统计分析法",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":533,"analysis":37},910730,"下列关于价值工程的说法，正确的有（ ）。",[591,593,595,597,599],{"key":20,"text":592,"correct":22},"价值工程的核心是对产品进行功能分析",{"key":24,"text":594,"correct":29},"价值工程的应用重点是在产品生产阶段",{"key":27,"text":596,"correct":22},"价值工程将产品的价值、功能和成本作为一个整体考虑",{"key":31,"text":598,"correct":22},"价值工程需要将产品的功能定量化",{"key":34,"text":600,"correct":22},"价值工程可用来寻求产品价值的提高途径",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":248,"analysis":37},910731,"价值工程应用中，对提出的新方案进行综合评价的定量方法有（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":29},"头脑风暴法",{"key":24,"text":608,"correct":22},"直接评分法",{"key":27,"text":610,"correct":22},"加权评分法",{"key":31,"text":612,"correct":29},"优缺点列举法",{"key":34,"text":564,"correct":29},{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":198,"analysis":37},910732,"在价值工程活动中，常用的方案综合评价方法中定量方法有（ ）。",[618,619,620,621,623],{"key":20,"text":612,"correct":29},{"key":24,"text":608,"correct":22},{"key":27,"text":545,"correct":22},{"key":31,"text":622,"correct":29},"德尔菲法",{"key":34,"text":541,"correct":22},{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":327,"analysis":37},910733,"方案创造可采用的方法有（）。",[628,629,631,633,634],{"key":20,"text":606,"correct":22},{"key":24,"text":630,"correct":22},"哥顿法",{"key":27,"text":632,"correct":29},"专家打分法",{"key":31,"text":564,"correct":22},{"key":34,"text":566,"correct":22},{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":411,"analysis":37},910734,"按用户的需求分类中的不必要功能包括（ ）。",[639,640,642,643,644],{"key":20,"text":469,"correct":22},{"key":24,"text":641,"correct":29},"美学功能",{"key":27,"text":467,"correct":29},{"key":31,"text":473,"correct":22},{"key":34,"text":471,"correct":22},{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":67,"analysis":37},910735,"利用功能指数法进行价值分析时，如果VI>1，出现这种情况的原因可能是（）。",[649,650,652,653,655],{"key":20,"text":481,"correct":22},{"key":24,"text":651,"correct":22},"功能过剩，已经超过了其应具有的功能水平",{"key":27,"text":485,"correct":29},{"key":31,"text":654,"correct":22},"功能很重要但成本较低，不必列为改进对象",{"key":34,"text":656,"correct":29},"实现功能的条件和方法不佳，致使成本过高",{"id":658,"libraryId":5,"type":15,"typeLabel":16,"stem":659,"options":660,"answer":667,"analysis":37},910736,"用于方案综合评价的定量方法主要有（ ）。",[661,662,663,665,666],{"key":20,"text":608,"correct":22},{"key":24,"text":610,"correct":22},{"key":27,"text":664,"correct":22},"比较价值评分法",{"key":31,"text":612,"correct":29},{"key":34,"text":545,"correct":22},"ABCE",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":155,"analysis":37},910737,"下列属于价值工程分析阶段的工作有（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":29},"对象选择",{"key":24,"text":675,"correct":29},"方案评价",{"key":27,"text":677,"correct":22},"功能定义",{"key":31,"text":679,"correct":22},"功能整理",{"key":34,"text":681,"correct":22},"功能评价",[683,687,690,693,696,699],{"id":684,"name":685,"category":7,"favorite":686},1,"领导干部任职前廉政法规知识测试题",92,{"id":688,"name":689,"category":7,"favorite":684},595,"建筑结构与设备",{"id":691,"name":692,"category":7,"favorite":684},715,"招标采购专业知识与法律法规",{"id":694,"name":695,"category":7,"favorite":684},848,"市政方向-通用基础",{"id":697,"name":698,"category":7,"favorite":8},534,"BIM工程师",{"id":700,"name":698,"category":7,"favorite":8},535]