[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-51":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":703},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,51,50,2821,[13,38,53,66,81,96,110,125,138,153,165,176,189,202,217,231,240,251,260,275,290,304,319,333,347,362,376,391,405,420,434,448,462,470,484,494,508,522,536,550,565,580,594,608,622,636,650,664,676,690],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},910635,2,"多选题","下列属于项目管理实施规划内容的是（）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","项目概况",true,{"key":24,"text":25,"correct":22},"B","组织方案",{"key":27,"text":28,"correct":22},"C","设计与技术措施",{"key":30,"text":31,"correct":22},"D","成本计划",{"key":33,"text":34,"correct":35},"E","财务评价指标汇总表",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},910636,"在工程项目进度控制计划系统中，由建设单位负责编制的总进度计划表包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"工程项目进度平衡表",{"key":24,"text":45,"correct":35},"年度计划项目表",{"key":27,"text":47,"correct":22},"投资计划年度分配表",{"key":30,"text":49,"correct":35},"项目动用前准备工作计划表",{"key":33,"text":51,"correct":22},"工程项目总进度计划表","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":65,"analysis":37},910637,"项目管理实施规划的主要内容包括（ ）。",[57,59,61,62,63],{"key":20,"text":58,"correct":35},"项目管理组织",{"key":24,"text":60,"correct":22},"质量计划",{"key":27,"text":31,"correct":22},{"key":30,"text":28,"correct":22},{"key":33,"text":64,"correct":22},"进度计划","BCDE",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":80,"analysis":37},910638,"项目管理规划大纲的主要内容包括（ ）。",[70,72,74,76,78],{"key":20,"text":71,"correct":22},"项目采购与投标管理",{"key":24,"text":73,"correct":35},"总体工作安排",{"key":27,"text":75,"correct":22},"绿色建造与环境管理",{"key":30,"text":77,"correct":22},"项目资源管理",{"key":33,"text":79,"correct":22},"项目收尾管理","ACDE",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":95,"analysis":37},910639,"下列建设工程项目目标控制方法中，可用来判断工程进度偏差的有（）。",[85,87,89,91,93],{"key":20,"text":86,"correct":35},"直方图法",{"key":24,"text":88,"correct":22},"网络计划法",{"key":27,"text":90,"correct":22},"S曲线法",{"key":30,"text":92,"correct":22},"香蕉曲线法",{"key":33,"text":94,"correct":35},"控制图法","BCD",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":36,"analysis":37},910640,"根据《建设工程安全生产管理条例》，专项施工方案的内容包括（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":22},"工程概况",{"key":24,"text":103,"correct":22},"编制依据",{"key":27,"text":105,"correct":22},"施工计划",{"key":30,"text":107,"correct":22},"劳动力计划",{"key":33,"text":109,"correct":35},"工程量清单",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":124,"analysis":37},910641,"施工方案施工安排中应包括的内容是指（）。",[114,116,118,120,122],{"key":20,"text":115,"correct":22},"工程施工目标",{"key":24,"text":117,"correct":35},"资源配置计划",{"key":27,"text":119,"correct":22},"工程施工顺序及施工流水段",{"key":30,"text":121,"correct":22},"工程施工的重点和难点分析",{"key":33,"text":123,"correct":35},"施工进度计划","ACD",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":124,"analysis":37},910642,"根据国家有关规定，专项施工方案的内容应包括（）。",[129,131,133,134,136],{"key":20,"text":130,"correct":22},"施工工艺技术",{"key":24,"text":132,"correct":35},"施工进度安排和空间组织",{"key":27,"text":107,"correct":22},{"key":30,"text":135,"correct":22},"施工安全保证措施",{"key":33,"text":137,"correct":35},"施工现场平面布置",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":152,"analysis":37},910643,"在组织流水施工时，非节奏流水施工的特点包括（ ）。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"各施工过程在各施工段的流水节拍不全相等",{"key":24,"text":145,"correct":22},"相邻施工过程的流水步距不尽相等",{"key":27,"text":147,"correct":22},"专业工作队数等于施工过程数",{"key":30,"text":149,"correct":35},"专业工作队数大于施工过程数",{"key":33,"text":151,"correct":22},"各专业工作队能够在施工段上连续作业，但有的施工段之间可能有空闲时间","ABCE",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":95,"analysis":37},910644,"非节奏流水施工的特点有（ ）。",[157,159,160,161,163],{"key":20,"text":158,"correct":35},"各施工段上的流水节拍均相等",{"key":24,"text":145,"correct":22},{"key":27,"text":147,"correct":22},{"key":30,"text":162,"correct":22},"施工段之间可能有空闲时间",{"key":33,"text":164,"correct":35},"有的专业工作队不能连续作业",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":175,"analysis":37},910646,"固定节拍流水施工的特点有（ ）。",[169,170,172,173,174],{"key":20,"text":158,"correct":22},{"key":24,"text":171,"correct":22},"相邻施工过程的流水步距均相等",{"key":27,"text":147,"correct":22},{"key":30,"text":162,"correct":35},{"key":33,"text":164,"correct":35},"ABC",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":188,"analysis":37},910647,"建设工程组织加快的成倍节拍流水施工的特点有（ ）。",[180,182,184,185,187],{"key":20,"text":181,"correct":35},"同一施工过程的各施工段上的流水节拍成倍数关系",{"key":24,"text":183,"correct":22},"相邻施工过程的流水步距相等",{"key":27,"text":147,"correct":35},{"key":30,"text":186,"correct":22},"各专业工作队在施工段上可连续作业",{"key":33,"text":162,"correct":35},"BD",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":175,"analysis":37},910648,"下列关于无节奏流水施工，正确的说法是（ ）。",[193,195,197,198,200],{"key":20,"text":194,"correct":22},"一般情况下流水步距不等",{"key":24,"text":196,"correct":22},"各施工段上的流水节拍不尽相等",{"key":27,"text":147,"correct":22},{"key":30,"text":199,"correct":35},"一般用于结构简单、规模小的线型工程",{"key":33,"text":201,"correct":35},"各工作队连续施工，施工段没有空闲",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":216,"analysis":37},910649,"组织流水施工时，确定流水步距应满足的基本要求是（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":22},"各专业队投入施工后尽可能保持连续作业",{"key":24,"text":209,"correct":22},"相邻专业队投入施工应最大限度地实现合理搭接",{"key":27,"text":211,"correct":35},"流水步距的数目应等于施工过程数",{"key":30,"text":213,"correct":35},"流水步距的值应等于流水节拍值中的最大值",{"key":33,"text":215,"correct":22},"各施工过程按各自流水速度施工，始终保持工艺先后顺序","ABE",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":152,"analysis":37},910650,"在流水施工过程中，为使施工段划分得合理，一般应遵循下列原则（ ）。",[221,223,225,227,229],{"key":20,"text":222,"correct":22},"同一专业工作队在各个施工段上的劳动量应大致相等",{"key":24,"text":224,"correct":22},"每个施工段内要有足够的工作面",{"key":27,"text":226,"correct":22},"施工段的界限应尽可能与结构界限相吻合",{"key":30,"text":228,"correct":35},"对于多层建筑物、构筑物的工程，只能划分施工段，不能分施工层",{"key":33,"text":230,"correct":22},"施工段的数目要满足合理组织流水施工的要求",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":95,"analysis":37},910651,"下列选项中属于非节奏流水施工的特点有（ ）。",[235,236,237,238,239],{"key":20,"text":158,"correct":35},{"key":24,"text":145,"correct":22},{"key":27,"text":147,"correct":22},{"key":30,"text":162,"correct":22},{"key":33,"text":164,"correct":35},{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":65,"analysis":37},910652,"下列关于固定节拍流水施工的特点有（ ）。",[244,245,246,247,249],{"key":20,"text":143,"correct":35},{"key":24,"text":183,"correct":22},{"key":27,"text":147,"correct":22},{"key":30,"text":248,"correct":22},"各个专业工作队在各施工段上能够连续作业",{"key":33,"text":250,"correct":22},"施工段之间没有空闲时间",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":216,"analysis":37},910654,"组织流水施工时，确定流水步距应满足基本要求有（ ）",[255,256,257,258,259],{"key":20,"text":207,"correct":22},{"key":24,"text":209,"correct":22},{"key":27,"text":211,"correct":35},{"key":30,"text":213,"correct":35},{"key":33,"text":215,"correct":22},{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":274,"analysis":37},910655,"根据优化目标的不同，网络计划的优化可分为（ ）。",[264,266,268,270,272],{"key":20,"text":265,"correct":35},"控制措施优化",{"key":24,"text":267,"correct":22},"工期优化",{"key":27,"text":269,"correct":35},"管理线路优化",{"key":30,"text":271,"correct":22},"费用优化",{"key":33,"text":273,"correct":22},"资源优化","BDE",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":289,"analysis":37},910656,"某工程双代号网络计划如下图所示，图中已标出各个节点的最早时间和最迟时间。该计划表明（ ）。",[279,281,283,285,287],{"key":20,"text":280,"correct":35},"工作1-2的自由时差为2",{"key":24,"text":282,"correct":22},"工作2-5的总时差为7",{"key":27,"text":284,"correct":22},"工作3-4为关键工作",{"key":30,"text":286,"correct":35},"工作3-5为关键工作",{"key":33,"text":288,"correct":35},"工作4-6的总时差为零","BC",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":289,"analysis":37},910657,"在工程项目实施过程中，当实际进度偏差影响到后续工作、总工期而需要调整进度计划时，其调整方法主要有（ ）。",[294,296,298,300,302],{"key":20,"text":295,"correct":35},"增派施工人员",{"key":24,"text":297,"correct":22},"改变某些工作间的逻辑关系",{"key":27,"text":299,"correct":22},"缩短某些工作的持续时间",{"key":30,"text":301,"correct":35},"取消部分施工项目",{"key":33,"text":303,"correct":35},"提前进行后续施工",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":318,"analysis":37},910658,"关于网络图关键路线正确的说法是（ ）。",[308,310,312,314,316],{"key":20,"text":309,"correct":22},"双代号网络图中持续时间最长的线路是关键线路",{"key":24,"text":311,"correct":35},"双代号网络图中由关键节点连接而成的线路是关键线路",{"key":27,"text":313,"correct":35},"双代号时标网络图中自始至终没有虚箭线的线路是关键线路",{"key":30,"text":315,"correct":22},"单代号网络图中自始至终LAG=0（LAG指相邻两项工作之间的时间间隔）的线路是关键线路",{"key":33,"text":317,"correct":35},"单代号网络图中总时差最小的工作组成的线路是关键线路","AD",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":216,"analysis":37},910659,"某工程双代号网络计划如下图所示，图中已标由各节点的最早时间和最迟时间。该计划表明（ ）。",[323,325,327,329,331],{"key":20,"text":324,"correct":22},"工作1-2为关键工作",{"key":24,"text":326,"correct":22},"工作2-4的总时差为零",{"key":27,"text":328,"correct":35},"工作2-5的自由时差为1",{"key":30,"text":330,"correct":35},"工作3-4为非关键工作",{"key":33,"text":332,"correct":22},"工作5-6的总时差为1",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":188,"analysis":37},910660,"工程网络计划中，关键工作是指（ ）的工作。",[337,339,341,343,345],{"key":20,"text":338,"correct":35},"自由时差最小",{"key":24,"text":340,"correct":22},"总时差最小",{"key":27,"text":342,"correct":35},"时间间隔为零",{"key":30,"text":344,"correct":22},"最迟完成时间与最早完成时间的差值最小",{"key":33,"text":346,"correct":35},"开始节点和完成节点均为关键节点",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":361,"analysis":37},910661,"某工程网络计划图中，D工作的紧后工作为E和 F，其持续时间分别为6天、3天、2天，D工作第8天开始，E和F工作均于第18天必须最迟完成，则以下参数正确的是（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":35},"D工作自由时差为1天",{"key":24,"text":354,"correct":22},"D工作自由时差为0天",{"key":27,"text":356,"correct":35},"E工作的总时差为0天",{"key":30,"text":358,"correct":35},"D工作的最迟开始时间为第10天",{"key":33,"text":360,"correct":22},"F工作总时差为2天","BE",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":375,"analysis":37},910662,"在工程网络计划中，关键工作是指（ ）的工作。",[366,368,370,371,373],{"key":20,"text":367,"correct":22},"最迟完成时间与最早完成时间之差最小",{"key":24,"text":369,"correct":35},"自由时差为零",{"key":27,"text":340,"correct":22},{"key":30,"text":372,"correct":35},"持续时间最长",{"key":33,"text":374,"correct":35},"时标网络计划中没有波形线","AC",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":390,"analysis":37},910663,"在工程网络计划中，关键线路是指（ ）的线路。",[380,382,384,386,388],{"key":20,"text":381,"correct":22},"双代号网络计划中总持续时间最长",{"key":24,"text":383,"correct":22},"双代号时标网络计划中没有波形线",{"key":27,"text":385,"correct":35},"双代号网络计划中由关键节点组成",{"key":30,"text":387,"correct":22},"单代号网络计划中相邻工作时间间隔均为零",{"key":33,"text":389,"correct":35},"单代号网络计划中由关键工作组成","ABD",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":80,"analysis":37},910664,"某分部工程双代号时标网络计划执行到第6天和第10天结束时，检查其实际进度如下图前锋线所示，检查结果表明（ ）。",[395,397,399,401,403],{"key":20,"text":396,"correct":22},"第6天结束检查时，工作B的实际进度不影响总工期",{"key":24,"text":398,"correct":35},"第6天结束检查时，工作D的总时差尚有2天",{"key":27,"text":400,"correct":22},"第10天结束检查时，工作E的实际进度会影响总工期",{"key":30,"text":402,"correct":22},"第10天结束检查时，工作C的实际进度影响工期1天",{"key":33,"text":404,"correct":22},"在第6天到第10天内，工作D的实际进度加快1天",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":419,"analysis":37},910665,"下列选项中，属于改变关键线路和超过计划工期的非关键线路上的有关工作之间的逻辑关系的措施有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"将顺序作业改为平行作业",{"key":24,"text":412,"correct":35},"提高劳动效率",{"key":27,"text":414,"correct":35},"增加资源投入",{"key":30,"text":416,"correct":35},"采用轮班工作制",{"key":33,"text":418,"correct":22},"搭接作业以及分段组织流水作业","AE",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":65,"analysis":37},910666,"某工程双代号网络计划如下图所示，工作B的后续工作有（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":35},"工作D",{"key":24,"text":427,"correct":22},"工作E",{"key":27,"text":429,"correct":22},"工作J",{"key":30,"text":431,"correct":22},"工作K",{"key":33,"text":433,"correct":22},"工作L",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":52,"analysis":37},910667,"对工程网络计划进行优化，其目的是使该工程（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":22},"总成本最低",{"key":24,"text":441,"correct":35},"资源强度最低",{"key":27,"text":443,"correct":22},"资源需用量尽可能均衡",{"key":30,"text":445,"correct":35},"资源需用量最少",{"key":33,"text":447,"correct":22},"计算工期满足要求工期",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":216,"analysis":37},910668,"某工程时标网络图如下图所示。计划执行到第5周末检查实际进度。发现D工作尚需3周完成，E工作尚需1周完成，F工作刚刚开始。由此可以判断出（ ）。",[452,454,456,458,460],{"key":20,"text":453,"correct":22},"A、C工作均已完成",{"key":24,"text":455,"correct":22},"D工程按计划进行",{"key":27,"text":457,"correct":35},"E工作提前1周",{"key":30,"text":459,"correct":35},"F工作进度不影响总工期",{"key":33,"text":461,"correct":22},"总工期将延长1周",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":464,"answer":289,"analysis":37},910669,[465,466,467,468,469],{"key":20,"text":295,"correct":35},{"key":24,"text":297,"correct":22},{"key":27,"text":299,"correct":22},{"key":30,"text":301,"correct":35},{"key":33,"text":303,"correct":35},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":52,"analysis":37},910670,"某分部工程双代号网络计划如下图所示，其作图错误包括（ ）。",[474,476,478,480,482],{"key":20,"text":475,"correct":22},"多个起点节点",{"key":24,"text":477,"correct":35},"多个终点节点",{"key":27,"text":479,"correct":22},"节点编号有误",{"key":30,"text":481,"correct":35},"存在循环回路",{"key":33,"text":483,"correct":22},"有多余虚工作",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":318,"analysis":37},910671,"工程双代号网络计划中，关键工作是指（ ）的工作",[488,489,490,491,492],{"key":20,"text":340,"correct":22},{"key":24,"text":338,"correct":35},{"key":27,"text":342,"correct":35},{"key":30,"text":344,"correct":22},{"key":33,"text":493,"correct":35},"两端为关键节点的工作",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":36,"analysis":37},910672,"下列关于双代号时标网络计划的绘制方法的说法中，正确的有（ ）。",[498,500,502,504,506],{"key":20,"text":499,"correct":22},"在编制时标网络计划时应使每一个节点和每一项工作(包括虚工作)尽量向左靠",{"key":24,"text":501,"correct":22},"在编制时标网络计划之前，应先按已经确定的时间单位绘制时标网络计划表",{"key":27,"text":503,"correct":22},"按工作的持续时间绘制以网络计划起点节点为开始节点的工作箭线",{"key":30,"text":505,"correct":22},"当网络计划的规模比较大，且比较复杂时，可以在时标网络计划表的顶部和底部同时标注时间坐标。必要时，还可以在顶部时间坐标之上或底部时间坐标之下同时加注日历时间",{"key":33,"text":507,"correct":35},"除网络计划的起点节点外，其他节点必须在所有以该节点为完成节点的工作箭线均绘出后，定位在这些工作箭线中最早的箭线始端",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":175,"analysis":37},910673,"设备采购合同，卖方未能按时交付合同设备的，应向买方支付迟延交付违约金，迟延交付违约金的计算方法说法正确的是（）",[512,514,516,518,520],{"key":20,"text":513,"correct":22},"从迟交的第一周到第四周，每周迟延交付违约金为迟交合同设备价格的0.5%",{"key":24,"text":515,"correct":22},"从迟交的第五周到第八周，每周迟延交付违约金为迟交合同设备价格的1%",{"key":27,"text":517,"correct":22},"从迟交第九周起，每周迟延交付违约金为迟交合同设备价格的1. 5%",{"key":30,"text":519,"correct":35},"在计算迟延交付违约金时，迟交不足一周的按半周计算",{"key":33,"text":521,"correct":35},"迟延交付违约金的总额不得超过合同价格的6%",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":124,"analysis":37},910674,"下列关于利息和利率的说法中，正确的有（ ）。",[526,528,530,532,534],{"key":20,"text":527,"correct":22},"利率的高低首先取决于社会平均利润率的高低",{"key":24,"text":529,"correct":35},"有效利率是指资金在计息中所发生的名义利率",{"key":27,"text":531,"correct":22},"利息和利率是用来衡量资金时间价值的重要尺度",{"key":30,"text":533,"correct":22},"利息是占用资金所付的代价或者是放弃使用资金所得的补偿",{"key":33,"text":535,"correct":35},"利率是一年内所获得的利息与借贷金额的现值之比",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":375,"analysis":37},910675,"一人准备在今后7年每年年末存入A元，利率为I，则第8年年末可以得到F的正确表达式是（ ）。 A.F=A（P\u002FA,I,7）（F\u002FP,I,8）",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"F=A（P\u002FA,I,6）（F\u002FP,I,7）",{"key":24,"text":543,"correct":35},"F=A（F\u002FA,I,7）（F\u002FP,I,1）",{"key":27,"text":545,"correct":22},"F=A（F\u002FA,I,6）（F\u002FP,I,2）",{"key":30,"text":547,"correct":35},"F=A（F\u002F",{"key":33,"text":549,"correct":35},"I，7）",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":564,"analysis":37},910676,"某建设项目现金流量图见图4-3，基准折现率为i，则该项目在k时点的现值P的表达式正确的有（ ）。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"P=A(P\u002FA,i,n-m+1)(P\u002FF,i,m-k-1)",{"key":24,"text":557,"correct":35},"P=A(P\u002FA,i,n-m+1)(P\u002FF,i,n-k)",{"key":27,"text":559,"correct":35},"P=A(F\u002FA,i,n-m+1)(P\u002FF,i,m-k-1)",{"key":30,"text":561,"correct":22},"P=A(F\u002FA,i,n-m+1)(P\u002FF,i,n-k)",{"key":33,"text":563,"correct":22},"P=A(P\u002FA,i,n-k)-A(P\u002FA,i,m-k-1)","ADE",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":579,"analysis":37},910677,"下列关于资金时间价值的说法正确的有（ ）。",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"时间价值是资金在社会再生产过程中所产生的增值",{"key":24,"text":572,"correct":22},"时间价值是对资金机会成本的衡量",{"key":27,"text":574,"correct":35},"金融市场上借贷资本供过于求时，资金的时间价值率（利率）上升",{"key":30,"text":576,"correct":22},"对于国家鼓励发展的行业，利率一般定得较低",{"key":33,"text":578,"correct":22},"利率水平一般都低于社会平均利润率","ABDE",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":36,"analysis":37},910678,"影响利率的主要因素有（ ）。",[584,586,588,590,592],{"key":20,"text":585,"correct":22},"社会平均利润率",{"key":24,"text":587,"correct":22},"借贷资本的供求情况",{"key":27,"text":589,"correct":22},"借贷风险",{"key":30,"text":591,"correct":22},"通货膨胀",{"key":33,"text":593,"correct":35},"借款本金大小",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":36,"analysis":37},910679,"现金流量图是一种反映经济系统资金运动状态的图式，运用现金流量图可以形象、直观地表示现金流量的（ ）。",[598,600,602,604,606],{"key":20,"text":599,"correct":22},"资金数额",{"key":24,"text":601,"correct":22},"资金流入",{"key":27,"text":603,"correct":22},"资金流出",{"key":30,"text":605,"correct":22},"流出的时间点",{"key":33,"text":607,"correct":35},"净现金流量",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":579,"analysis":37},910680,"利息作为衡量资金的时间价值的绝对尺度，它指（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"占用资金所付出的代价",{"key":24,"text":615,"correct":22},"放弃使用资金所得到的补偿",{"key":27,"text":617,"correct":35},"考虑通货膨胀所得到的补偿",{"key":30,"text":619,"correct":22},"资金的一种机会成本",{"key":33,"text":621,"correct":22},"投资者的一种收益",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":52,"analysis":37},910681,"关于现金流量图绘制规则的说法，正确的有（ ）。",[626,628,630,632,634],{"key":20,"text":627,"correct":22},"横轴为时间轴，整个横轴表示经济系统寿命期",{"key":24,"text":629,"correct":35},"横轴的起点表示时间序列第一期期末",{"key":27,"text":631,"correct":22},"横轴上每一间隔代表一个计息周期",{"key":30,"text":633,"correct":35},"与横轴相连的垂直箭线代表现金流量",{"key":33,"text":635,"correct":22},"垂直箭线的长短应体现各时点现金流量的大小",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":152,"analysis":37},910682,"下列关于名义利率和有效利率的说法中，正确的有（ ）.",[640,642,644,646,648],{"key":20,"text":641,"correct":22},"名义利率是计息周期利率与一个利率周期内计息周期数的乘积",{"key":24,"text":643,"correct":22},"有效利率包括计息周期有效利率和利率周期有效利率",{"key":27,"text":645,"correct":22},"当计息周期与利率周期相同时，名义利率等于有效利率",{"key":30,"text":647,"correct":35},"当计息周期小于利率周期时，名义利率大于有效利率",{"key":33,"text":649,"correct":22},"当名义利率一定时，有效利率随计息周期变化而变化",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":152,"analysis":37},910683,"在工程经济学中，利率作为衡量资金时间价值的相对尺度，下列关于利率的表述正确的是（）。",[654,656,658,660,662],{"key":20,"text":655,"correct":22},"在通常情况下，社会平均利润率是利率的最高界限",{"key":24,"text":657,"correct":22},"利率的高低受借贷资本供求的影响",{"key":27,"text":659,"correct":22},"借贷风险的大小往往影响利率的高低",{"key":30,"text":661,"correct":35},"利率是国家管理国民经济的重要杠杆，因此利率是由国家制定的",{"key":33,"text":663,"correct":22},"利率是在单位时间内所得利息与借款本金之比",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":390,"analysis":37},910684,"在工程经济学中，利息作为衡量资金时间价值的绝对尺度，它是指（ ）。",[668,670,671,673,674],{"key":20,"text":669,"correct":22},"占用资金所付的代价",{"key":24,"text":615,"correct":22},{"key":27,"text":672,"correct":35},"考虑通货膨胀所得的补偿",{"key":30,"text":619,"correct":22},{"key":33,"text":675,"correct":35},"高于社会平均利润率的利润",{"id":677,"libraryId":5,"type":15,"typeLabel":16,"stem":678,"options":679,"answer":361,"analysis":37},910685,"某项目的现金流量如下图所示，则下列等式正确的有（ ）。 A.P=-30(P／ A，i，3)+40(P／ F，i，4)+60(P／ A，i，5)(P／ F，i，5) B.P=-30(P／ A，i，4)（1+i）+40(P／ F，i，4)+60(P／ A，i，6)(P／ F，i，4) C.P=-30-30(P／ A，i，3)+40(P／ F，i，4)+60(P／ A，i，10) D.P=-30-30(P／ A，i，3)+40(P／ F，i，4)+60(P／ A，i，5)(P／ F，i，5)",[680,682,684,686,688],{"key":20,"text":681,"correct":35},"P=-30-30(P／",{"key":24,"text":683,"correct":22},"i，3)+40(P／",{"key":27,"text":685,"correct":35},"i，4)+60(P／",{"key":30,"text":687,"correct":35},"i，6)(P／",{"key":33,"text":689,"correct":22},"i，4)",{"id":691,"libraryId":5,"type":15,"typeLabel":16,"stem":692,"options":693,"answer":375,"analysis":37},910686,"一人准备在今后7年每年年末存入A元，利率为I，则第8年年末可以得到F的正确表达式有（ ）。 A.F=A(P／ A，I，7)(F／P，I，8) B.F=A(F／P，I，6)(F／P，I，7) C.F=A(F／",[694,696,698,700,701],{"key":20,"text":695,"correct":22},"I，7)(F／P，I，1)",{"key":24,"text":697,"correct":35},"F=A(F／",{"key":27,"text":699,"correct":22},"I，6)(F／P，I，2)",{"key":30,"text":697,"correct":35},{"key":33,"text":702,"correct":35},"I，7)",[704,708,711,714,717,720],{"id":705,"name":706,"category":7,"favorite":707},1,"领导干部任职前廉政法规知识测试题",92,{"id":709,"name":710,"category":7,"favorite":705},595,"建筑结构与设备",{"id":712,"name":713,"category":7,"favorite":705},715,"招标采购专业知识与法律法规",{"id":715,"name":716,"category":7,"favorite":705},848,"市政方向-通用基础",{"id":718,"name":719,"category":7,"favorite":8},534,"BIM工程师",{"id":721,"name":719,"category":7,"favorite":8},535]