[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-50":3},{"library":4,"page":9,"limit":9,"total":10,"questions":11,"related":712},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,50,2821,[12,37,52,67,82,97,112,126,141,156,170,185,199,211,226,240,255,269,279,294,308,316,331,346,360,374,388,403,417,431,445,459,473,488,502,516,530,544,556,565,576,588,602,617,631,645,659,673,687,698],{"id":13,"libraryId":5,"type":14,"typeLabel":15,"stem":16,"options":17,"answer":35,"analysis":36},910584,2,"多选题","项目法人责任制由项目法人对（ ）等实行全过程负责。",[18,22,25,28,31],{"key":19,"text":20,"correct":21},"A","项目策划",true,{"key":23,"text":24,"correct":21},"B","资金筹措",{"key":26,"text":27,"correct":21},"C","建设实施",{"key":29,"text":30,"correct":21},"D","生产经营",{"key":32,"text":33,"correct":34},"E","资产核算",false,"ABCD","",{"id":38,"libraryId":5,"type":14,"typeLabel":15,"stem":39,"options":40,"answer":51,"analysis":36},910585,"工程项目管理的发展趋势包括（ ）。",[41,43,45,47,49],{"key":19,"text":42,"correct":21},"国际化趋势",{"key":23,"text":44,"correct":21},"集成化趋势",{"key":26,"text":46,"correct":34},"专业化趋势",{"key":29,"text":48,"correct":34},"市场化趋势",{"key":32,"text":50,"correct":21},"信息化趋势","ABE",{"id":53,"libraryId":5,"type":14,"typeLabel":15,"stem":54,"options":55,"answer":66,"analysis":36},910586,"根据《国务院关于投资体制改革的决定》，只需审批资金申请报告的政府投资项目是指采用（ ）方式的项目。",[56,58,60,62,64],{"key":19,"text":57,"correct":34},"直接投资",{"key":23,"text":59,"correct":34},"资本金注入",{"key":26,"text":61,"correct":21},"投资补助",{"key":29,"text":63,"correct":21},"转贷",{"key":32,"text":65,"correct":21},"贷款贴息","CDE",{"id":68,"libraryId":5,"type":14,"typeLabel":15,"stem":69,"options":70,"answer":81,"analysis":36},910587,"根据《房屋建筑和市政基础设施工程施工图设计文件审查管理办法》，施工图审查机构对施工图设计文件审查的内容有（ ）。",[71,73,75,77,79],{"key":19,"text":72,"correct":34},"是否按限额设计标准进行施工图设计",{"key":23,"text":74,"correct":21},"是否符合工程建设强制性标准",{"key":26,"text":76,"correct":34},"施工图预算是否超过批准的工程概算",{"key":29,"text":78,"correct":21},"地基基础和主体结构的安全性",{"key":32,"text":80,"correct":34},"危险性较大的工程是否有专项施工方案","BD",{"id":83,"libraryId":5,"type":14,"typeLabel":15,"stem":84,"options":85,"answer":96,"analysis":36},910588,"在办理建设工程质量监督注册手续时需提供的材料有（ ）。",[86,88,90,92,94],{"key":19,"text":87,"correct":34},"施工招标文件",{"key":23,"text":89,"correct":21},"中标通知书",{"key":26,"text":91,"correct":21},"施工组织设计",{"key":29,"text":93,"correct":21},"施工合同",{"key":32,"text":95,"correct":34},"施工图设计文件","BCD",{"id":98,"libraryId":5,"type":14,"typeLabel":15,"stem":99,"options":100,"answer":111,"analysis":36},910589,"对业主而言，建设工程采用平行承包模式的特点有（ ）。",[101,103,105,107,109],{"key":19,"text":102,"correct":21},"选择承包商的范围大",{"key":23,"text":104,"correct":34},"组织协调工作量小",{"key":26,"text":106,"correct":34},"合同结构简单",{"key":29,"text":108,"correct":21},"工程招标任务量大",{"key":32,"text":110,"correct":21},"工程造价控制难度大","ADE",{"id":113,"libraryId":5,"type":14,"typeLabel":15,"stem":114,"options":115,"answer":81,"analysis":36},910590,"关于工程项目后评价的说法，正确的有（ ）。",[116,118,120,122,124],{"key":19,"text":117,"correct":34},"项目后评价应在竣工验收阶段进行",{"key":23,"text":119,"correct":21},"项目后评价的基本方法是对比法",{"key":26,"text":121,"correct":34},"项目效益后评价主要是经济效益后评价",{"key":29,"text":123,"correct":21},"项目效益后评价是项目后评价的重要组成部分",{"key":32,"text":125,"correct":34},"项目后评价全部采用实际运营数据",{"id":127,"libraryId":5,"type":14,"typeLabel":15,"stem":128,"options":129,"answer":140,"analysis":36},910591,"下列各项中，属于项目建议书的内容的是（ ）。",[130,132,134,136,138],{"key":19,"text":131,"correct":21},"产品方案的初步设想",{"key":23,"text":133,"correct":21},"项目进度安排",{"key":26,"text":135,"correct":21},"经济效益的初步估计",{"key":29,"text":137,"correct":34},"资源条件评价",{"key":32,"text":139,"correct":34},"市场风险分析","ABC",{"id":142,"libraryId":5,"type":14,"typeLabel":15,"stem":143,"options":144,"answer":155,"analysis":36},910592,"下列关于CM承包模式的说法，正确的有（ ）。",[145,147,149,151,153],{"key":19,"text":146,"correct":21},"CM承包模式下采用快速路径法施工",{"key":23,"text":148,"correct":34},"CM单位直接与分包单位签订分包合同",{"key":26,"text":150,"correct":21},"CM合同采用成本加酬金的计价方式",{"key":29,"text":152,"correct":34},"CM单位与分包单位之间的合同价是保密的",{"key":32,"text":154,"correct":21},"CM单位不赚取总包与分包之间的差价","ACE",{"id":157,"libraryId":5,"type":14,"typeLabel":15,"stem":158,"options":159,"answer":66,"analysis":36},910593,"实行法人责任制的建设项目，项目总经理的职责有（ ）。",[160,162,164,166,168],{"key":19,"text":161,"correct":34},"负责筹措建设资金",{"key":23,"text":163,"correct":34},"负责提出项目竣工验收申请报告",{"key":26,"text":165,"correct":21},"组织编制项目初步设计文件",{"key":29,"text":167,"correct":21},"组织工程设计招标工作",{"key":32,"text":169,"correct":21},"负责生产准备工作和培训有关人员",{"id":171,"libraryId":5,"type":14,"typeLabel":15,"stem":172,"options":173,"answer":184,"analysis":36},910594,"根据《建筑工程施工质量验收统一标准》，下列工程中，属于分部工程的有（ ）。",[174,176,178,180,182],{"key":19,"text":175,"correct":34},"砌体结构工程",{"key":23,"text":177,"correct":21},"智能建筑工程",{"key":26,"text":179,"correct":21},"建筑节能工程",{"key":29,"text":181,"correct":34},"土方回填工程",{"key":32,"text":183,"correct":21},"装饰装修工程","BCE",{"id":186,"libraryId":5,"type":14,"typeLabel":15,"stem":187,"options":188,"answer":35,"analysis":36},910595,"BIM技术值得关注和推广的方面包括（ ）。",[189,191,193,195,197],{"key":19,"text":190,"correct":21},"构建可视化模型",{"key":23,"text":192,"correct":21},"优化工程设计方案",{"key":26,"text":194,"correct":21},"模拟施工",{"key":29,"text":196,"correct":21},"强化造价管理",{"key":32,"text":198,"correct":34},"强化施工管理",{"id":200,"libraryId":5,"type":14,"typeLabel":15,"stem":201,"options":202,"answer":140,"analysis":36},910596,"建设单位在办理工程质量监督注册手续时需提供的资料有（ ）。",[203,204,206,207,209],{"key":19,"text":91,"correct":21},{"key":23,"text":205,"correct":21},"监理规划",{"key":26,"text":89,"correct":21},{"key":29,"text":208,"correct":34},"施工图预算",{"key":32,"text":210,"correct":34},"专项施工方案",{"id":212,"libraryId":5,"type":14,"typeLabel":15,"stem":213,"options":214,"answer":225,"analysis":36},910597,"建设工程设计与施工采用总分包模式的特点有（ ）。",[215,217,219,221,223],{"key":19,"text":216,"correct":21},"对总承包商要求高，业主选择范围小",{"key":23,"text":218,"correct":34},"总包合同价格可较早确定，合同金额较低",{"key":26,"text":220,"correct":21},"业主的合同结构简单，组织协调工作量小",{"key":29,"text":222,"correct":21},"工程设计与施工有机融合，有利于缩短建设工期",{"key":32,"text":224,"correct":34},"分包单位多，弱化了工程质量控制工作","ACD",{"id":227,"libraryId":5,"type":14,"typeLabel":15,"stem":228,"options":229,"answer":51,"analysis":36},910598,"根据《国务院关于投资体制改革的决定》，企业投资建设《政府核准的投资项目目录》中的项目时，不再经过批准（ ）的程序。",[230,232,234,236,238],{"key":19,"text":231,"correct":21},"项目建议书",{"key":23,"text":233,"correct":21},"项目可行性研究报告",{"key":26,"text":235,"correct":34},"项目初步设计",{"key":29,"text":237,"correct":34},"项目施工图设计",{"key":32,"text":239,"correct":21},"项目开工报告",{"id":241,"libraryId":5,"type":14,"typeLabel":15,"stem":242,"options":243,"answer":254,"analysis":36},910599,"根据《关于实行建设项目法人责任制的暂行规定》，建设项目总经理的职权有（ ）。",[244,246,248,250,252],{"key":19,"text":245,"correct":21},"组织编制初步设计文件",{"key":23,"text":247,"correct":21},"组织工程设计招标",{"key":26,"text":249,"correct":34},"审批项目财务预算",{"key":29,"text":251,"correct":21},"组织单项工程预验收",{"key":32,"text":253,"correct":21},"编制项目财务决算","ABDE",{"id":256,"libraryId":5,"type":14,"typeLabel":15,"stem":257,"options":258,"answer":225,"analysis":36},910600,"工程项目管理的核心任务是控制项目目标，项目目标有（ ）。",[259,261,263,265,267],{"key":19,"text":260,"correct":21},"造价控制",{"key":23,"text":262,"correct":34},"合同控制",{"key":26,"text":264,"correct":21},"质量控制",{"key":29,"text":266,"correct":21},"进度控制",{"key":32,"text":268,"correct":34},"索赔控制",{"id":270,"libraryId":5,"type":14,"typeLabel":15,"stem":242,"options":271,"answer":278,"analysis":36},910601,[272,274,275,276,277],{"key":19,"text":273,"correct":34},"组织审核初步设计文件",{"key":23,"text":247,"correct":21},{"key":26,"text":249,"correct":34},{"key":29,"text":251,"correct":21},{"key":32,"text":253,"correct":21},"BDE",{"id":280,"libraryId":5,"type":14,"typeLabel":15,"stem":281,"options":282,"answer":293,"analysis":36},910602,"根据《国务院关于投资体制改革的决定》(国发[2004] 20号)，关于政府投资项目，下列说法错误的是（）。",[283,285,287,289,291],{"key":19,"text":284,"correct":21},"对于采用直接投资的政府投资项目，政府只需审批开工报告",{"key":23,"text":286,"correct":34},"对于采用投资补助、转贷和贷款贴息方式的政府投资项目，则只审批资金申请报告",{"key":26,"text":288,"correct":34},"政府投资项目一般都要经过符合资质要求的咨询中介机构的评估论证，特别重大的项目还应实行专家评议制度",{"key":29,"text":290,"correct":21},"对于采用资本金注入方式的政府投资项目，政府需要从投资决策的角度审批项目建议书和可行性研究报告，所有情况均不再审批开工报告",{"key":32,"text":292,"correct":34},"政府投资项目只实行审批制","AD",{"id":295,"libraryId":5,"type":14,"typeLabel":15,"stem":296,"options":297,"answer":35,"analysis":36},910603,"根据《建筑工程施工质量验收统一标准》GB 50300，建筑工程包括（ ）等分部工程。",[298,300,302,304,306],{"key":19,"text":299,"correct":21},"地基与基础",{"key":23,"text":301,"correct":21},"主体结构",{"key":26,"text":303,"correct":21},"装饰装修",{"key":29,"text":305,"correct":21},"屋面",{"key":32,"text":307,"correct":34},"土建工程",{"id":309,"libraryId":5,"type":14,"typeLabel":15,"stem":187,"options":310,"answer":35,"analysis":36},910604,[311,312,313,314,315],{"key":19,"text":190,"correct":21},{"key":23,"text":192,"correct":21},{"key":26,"text":194,"correct":21},{"key":29,"text":196,"correct":21},{"key":32,"text":198,"correct":34},{"id":317,"libraryId":5,"type":14,"typeLabel":15,"stem":318,"options":319,"answer":330,"analysis":36},910605,"根据《建设工程质量管理条例》，下列建设工程必须实行监理的有（）。",[320,322,324,326,328],{"key":19,"text":321,"correct":21},"利用外国政府或者国际组织贷款、援助资金的工程",{"key":23,"text":323,"correct":21},"大中型公用事业工程",{"key":26,"text":325,"correct":34},"全部或者部分使用国有资金投资或者国家融资的项目",{"key":29,"text":327,"correct":21},"成片开发建设的住宅小区工程",{"key":32,"text":329,"correct":34},"涉及国家安全和国家秘密的工程","ABD",{"id":332,"libraryId":5,"type":14,"typeLabel":15,"stem":333,"options":334,"answer":345,"analysis":36},910606,"关于弱矩阵制组织形式的说法，正确的有（ ）。",[335,337,339,341,343],{"key":19,"text":336,"correct":21},"项目管理者的权限很小",{"key":23,"text":338,"correct":34},"需要配备训练有素的协调人员",{"key":26,"text":340,"correct":34},"项目组织成员绩效完全由项目经理考核",{"key":29,"text":342,"correct":34},"适用于技术复杂且对时间紧迫的项目",{"key":32,"text":344,"correct":21},"适用于技术简单的工程项目","AE",{"id":347,"libraryId":5,"type":14,"typeLabel":15,"stem":348,"options":349,"answer":51,"analysis":36},910607,"建设工程项目采用平行模式的特点有（）。",[350,352,354,356,358],{"key":19,"text":351,"correct":21},"有利于控制工程质量",{"key":23,"text":353,"correct":21},"有利于缩短建设工期",{"key":26,"text":355,"correct":34},"有利于组织管理",{"key":29,"text":357,"correct":34},"有利于控制工程造价",{"key":32,"text":359,"correct":21},"有利于业主择优选择承包商",{"id":361,"libraryId":5,"type":14,"typeLabel":15,"stem":362,"options":363,"answer":373,"analysis":36},910608,"下列关于强矩阵制组织形式的说法，正确的有（ ）。",[364,366,367,369,371],{"key":19,"text":365,"correct":21},"项目经理具有较大权限",{"key":23,"text":338,"correct":34},{"key":26,"text":368,"correct":21},"项目组成员绩效完全由项目经理考核",{"key":29,"text":370,"correct":21},"适用于技术复杂且时间紧迫的项目",{"key":32,"text":372,"correct":21},"项目经理直接向最高领导负责","ACDE",{"id":375,"libraryId":5,"type":14,"typeLabel":15,"stem":376,"options":377,"answer":225,"analysis":36},910609,"建设工程项目采用Partnering模式的特点有（ ）。",[378,380,382,384,386],{"key":19,"text":379,"correct":21},"Partnering协议是工程建设参与各方共同签署的协议",{"key":23,"text":381,"correct":34},"Partnering协议是工程合同文件的组成部分",{"key":26,"text":383,"correct":21},"Partnering模式需要工程建设参与各方高层管理者的参与",{"key":29,"text":385,"correct":21},"Partnering模式强调资源共享和风险分担",{"key":32,"text":387,"correct":34},"Partnering模式可以独立于其他承包模式而存在",{"id":389,"libraryId":5,"type":14,"typeLabel":15,"stem":390,"options":391,"answer":402,"analysis":36},910610,"建设工程采用平行承包模式时，建设单位控制工程造价难度大的原因有（ ）。",[392,394,396,398,400],{"key":19,"text":393,"correct":34},"合同价值小，建设单位选择承包单位的范围小",{"key":23,"text":395,"correct":34},"合同数量多，组织协调工作量大",{"key":26,"text":397,"correct":21},"总合同价不易在短期内确定，影响造价控制的实施",{"key":29,"text":399,"correct":34},"建设周期长，增加时间成本",{"key":32,"text":401,"correct":21},"工程招标任务量大，需控制多项合同价格","CE",{"id":404,"libraryId":5,"type":14,"typeLabel":15,"stem":405,"options":406,"answer":293,"analysis":36},910612,"下列关于工程项目管理组织机构形式说法正确的是（）。",[407,409,411,413,415],{"key":19,"text":408,"correct":21},"直线制隶属关系明确，易于统一指挥",{"key":23,"text":410,"correct":34},"矩阵制容易形成多头领导",{"key":26,"text":412,"correct":34},"职能制因有双重领导，容易产生扯皮现象",{"key":29,"text":414,"correct":21},"强矩阵制适用于技术复杂且对时间紧迫的项目",{"key":32,"text":416,"correct":34},"弱矩阵制项目经理由企业最高领导任命，并全权负责项目",{"id":418,"libraryId":5,"type":14,"typeLabel":15,"stem":419,"options":420,"answer":225,"analysis":36},910613,"施工方案施工安排中应包括的内容是指（ ）。",[421,423,425,427,429],{"key":19,"text":422,"correct":21},"工程施工目标",{"key":23,"text":424,"correct":34},"资源配置计划",{"key":26,"text":426,"correct":21},"工程施工顺序及施工流水段",{"key":29,"text":428,"correct":21},"工程施工的重点和难点分析",{"key":32,"text":430,"correct":34},"施工进度计划",{"id":432,"libraryId":5,"type":14,"typeLabel":15,"stem":433,"options":434,"answer":373,"analysis":36},910614,"下列关于施工方案审批的说法正确的是（ ）。",[435,437,439,441,443],{"key":19,"text":436,"correct":21},"施工方案应由项目技术负责人审批",{"key":23,"text":438,"correct":34},"重点分部（分项）或专项工程的施工方案由施工单位负责人审批",{"key":26,"text":440,"correct":21},"有总承包单位时，应由总承包单位项目技术负责人核准备案",{"key":29,"text":442,"correct":21},"专项工程的施工方案应由施工单位技术部门组织相关专家评审",{"key":32,"text":444,"correct":21},"规模较大的分部（分项）的施工方案应按单位工程施工组织设计进行编制和审批",{"id":446,"libraryId":5,"type":14,"typeLabel":15,"stem":447,"options":448,"answer":35,"analysis":36},910615,"工程项目年度计划包括文字和表格两部分内容，其中，表格部分包括（ ）。",[449,451,453,455,457],{"key":19,"text":450,"correct":21},"年度计划项目表",{"key":23,"text":452,"correct":21},"年度竣工投产交付使用计划表",{"key":26,"text":454,"correct":21},"年度建设资金平衡表",{"key":29,"text":456,"correct":21},"年度设备平衡表",{"key":32,"text":458,"correct":34},"投资计划年度分配表",{"id":460,"libraryId":5,"type":14,"typeLabel":15,"stem":461,"options":462,"answer":330,"analysis":36},910616,"下列属于项目目标控制中的主动控制措施的有（ ）。",[463,465,467,469,471],{"key":19,"text":464,"correct":21},"进行风险识别，在计划实施过程中做好风险管理工作",{"key":23,"text":466,"correct":21},"分析外界环境条件，找出其对项目目标实现不利的因素，并制定项目计划",{"key":26,"text":468,"correct":34},"根据项目管理组织中出现的问题，积极采取处理措施",{"key":29,"text":470,"correct":21},"针对可能出现的偏离，制定备用方案",{"key":32,"text":472,"correct":34},"根据近期发生的不可预见事件对进度的影响，对计划进行调整",{"id":474,"libraryId":5,"type":14,"typeLabel":15,"stem":475,"options":476,"answer":487,"analysis":36},910617,"工程项目施工过程中，应及时修改、补充施工组织总设计的情形是指（ ）。",[477,479,481,483,485],{"key":19,"text":478,"correct":34},"施工方案的重大修订",{"key":23,"text":480,"correct":21},"工程设计有重大修改",{"key":26,"text":482,"correct":21},"有关法律法规废止",{"key":29,"text":484,"correct":21},"主要施工资源配置有重大调整",{"key":32,"text":486,"correct":21},"施工环境有重大改变","BCDE",{"id":489,"libraryId":5,"type":14,"typeLabel":15,"stem":490,"options":491,"answer":402,"analysis":36},910618,"在下列建设工程项目目标控制方法中，可用来综合控制工程进度和工程造价的方法有（ ）。",[492,494,496,498,500],{"key":19,"text":493,"correct":34},"树枝图法",{"key":23,"text":495,"correct":34},"排列图法",{"key":26,"text":497,"correct":21},"S曲线法",{"key":29,"text":499,"correct":34},"决策树法",{"key":32,"text":501,"correct":21},"香蕉曲线法",{"id":503,"libraryId":5,"type":14,"typeLabel":15,"stem":504,"options":505,"answer":278,"analysis":36},910619,"应用控制图法控制生产过程质量时，表明点子在控制界限内排列有缺陷的有（ ）。",[506,508,510,512,514],{"key":19,"text":507,"correct":34},"点子连续在中心线一侧出现5个以上",{"key":23,"text":509,"correct":21},"连续7个以上的点子上升或下降",{"key":26,"text":511,"correct":34},"连续7个点中至少有5个点在同一侧",{"key":29,"text":513,"correct":21},"连续3个点中有三个点落在二倍标准偏差与三倍标准偏差控制界限之间",{"key":32,"text":515,"correct":21},"点子出现周期性波动",{"id":517,"libraryId":5,"type":14,"typeLabel":15,"stem":518,"options":519,"answer":111,"analysis":36},910620,"下列对工程项目前期工作计划和工程项目建设总进度计划的认识中，正确的是（ ）。",[520,522,524,526,528],{"key":19,"text":521,"correct":21},"工程项目前期工作计划可使工程项目前期决策阶段各项工作的时间得到控制",{"key":23,"text":523,"correct":34},"工程项目前期工作计划是对工程决策和实施阶段工作和工程进度的安排",{"key":26,"text":525,"correct":34},"工程项目总进度计划应在施工图设计完成后编制",{"key":29,"text":527,"correct":21},"工程项目总进度计划将具体安排各单位工程的开工和竣工日期",{"key":32,"text":529,"correct":21},"投资计划年度分配表根据工程项目总进度计划安排各个年度的投资",{"id":531,"libraryId":5,"type":14,"typeLabel":15,"stem":532,"options":533,"answer":81,"analysis":36},910621,"下列方法中，能够进行质量控制的静态方法是（ ）。",[534,536,538,540,542],{"key":19,"text":535,"correct":34},"香蕉曲线图",{"key":23,"text":537,"correct":21},"排列图",{"key":26,"text":539,"correct":34},"控制图或因果分析图",{"key":29,"text":541,"correct":21},"直方图",{"key":32,"text":543,"correct":34},"控制图",{"id":545,"libraryId":5,"type":14,"typeLabel":15,"stem":546,"options":547,"answer":278,"analysis":36},910622,"建设单位编制的工程项目建设总进度计划包括的内容有（ ）。",[548,550,552,553,555],{"key":19,"text":549,"correct":34},"竣工投产交付使用计划表",{"key":23,"text":551,"correct":21},"工程项目一览表",{"key":26,"text":454,"correct":34},{"key":29,"text":554,"correct":21},"工程项目进度平衡表",{"key":32,"text":458,"correct":21},{"id":557,"libraryId":5,"type":14,"typeLabel":15,"stem":333,"options":558,"answer":345,"analysis":36},910623,[559,561,562,563,564],{"key":19,"text":560,"correct":21},"项目经理的权限很小",{"key":23,"text":338,"correct":34},{"key":26,"text":340,"correct":34},{"key":29,"text":342,"correct":34},{"key":32,"text":344,"correct":21},{"id":566,"libraryId":5,"type":14,"typeLabel":15,"stem":567,"options":568,"answer":575,"analysis":36},910624,"工程项目目标控制中控制工程造价的方法包括（ ）。",[569,571,572,573,574],{"key":19,"text":570,"correct":34},"网络计划图",{"key":23,"text":535,"correct":21},{"key":26,"text":497,"correct":21},{"key":29,"text":541,"correct":34},{"key":32,"text":543,"correct":34},"BC",{"id":577,"libraryId":5,"type":14,"typeLabel":15,"stem":578,"options":579,"answer":96,"analysis":36},910625,"下列项目目标控制方法中，可用于控制工程质量的有（ ）。",[580,581,583,584,586],{"key":19,"text":497,"correct":34},{"key":23,"text":582,"correct":21},"控制图法",{"key":26,"text":495,"correct":21},{"key":29,"text":585,"correct":21},"直方图法",{"key":32,"text":587,"correct":34},"横道图法",{"id":589,"libraryId":5,"type":14,"typeLabel":15,"stem":590,"options":591,"answer":35,"analysis":36},910626,"下列属于项目管理实施规划内容的是（ ）。",[592,594,596,598,600],{"key":19,"text":593,"correct":21},"项目概况",{"key":23,"text":595,"correct":21},"组织方案",{"key":26,"text":597,"correct":21},"技术措施",{"key":29,"text":599,"correct":21},"成本计划",{"key":32,"text":601,"correct":34},"财务评价指标汇总表",{"id":603,"libraryId":5,"type":14,"typeLabel":15,"stem":604,"options":605,"answer":616,"analysis":36},910627,"采用频数分布直方图分析工程质量波动情况时，如果出现折齿型分布，说明（ ）。",[606,608,610,612,614],{"key":19,"text":607,"correct":21},"数据分组不当",{"key":23,"text":609,"correct":34},"少量材料不合格",{"key":26,"text":611,"correct":21},"组距确定不当",{"key":29,"text":613,"correct":34},"短时间内工人操作不熟练",{"key":32,"text":615,"correct":34},"两个分布相混淆","AC",{"id":618,"libraryId":5,"type":14,"typeLabel":15,"stem":619,"options":620,"answer":293,"analysis":36},910628,"在建设单位的计划体系中，工程项目年度计划的编制依据包括（ ）。",[621,623,625,627,629],{"key":19,"text":622,"correct":21},"工程项目总进度计划",{"key":23,"text":624,"correct":34},"年度竣工投产交付使用计划",{"key":26,"text":626,"correct":34},"年度劳动力需求计划",{"key":29,"text":628,"correct":21},"批准的设计方案",{"key":32,"text":630,"correct":34},"技术组织措施计划",{"id":632,"libraryId":5,"type":14,"typeLabel":15,"stem":633,"options":634,"answer":140,"analysis":36},910629,"施工组织设计根据编制对象不同，可分为（ ）等层次。",[635,637,639,641,643],{"key":19,"text":636,"correct":21},"施工组织总设计",{"key":23,"text":638,"correct":21},"单位工程施工组织设计",{"key":26,"text":640,"correct":21},"施工方案",{"key":29,"text":642,"correct":34},"分部工程施工组织设计",{"key":32,"text":644,"correct":34},"分项工程施工组织设计",{"id":646,"libraryId":5,"type":14,"typeLabel":15,"stem":647,"options":648,"answer":373,"analysis":36},910630,"下列选项中，施工组织设计的编制依据有（ ）。",[649,651,653,655,657],{"key":19,"text":650,"correct":21},"与工程有关的资源供应条件",{"key":23,"text":652,"correct":34},"招投标文件",{"key":26,"text":654,"correct":21},"工程现场条件",{"key":29,"text":656,"correct":21},"工程施工合同文件",{"key":32,"text":658,"correct":21},"工程设计文件",{"id":660,"libraryId":5,"type":14,"typeLabel":15,"stem":661,"options":662,"answer":35,"analysis":36},910631,"单位施工组织设计中应对（ ）等专项工程所采用的施工方案进行必要的验算和说明。",[663,665,667,669,671],{"key":19,"text":664,"correct":21},"脚手架工程",{"key":23,"text":666,"correct":21},"起重吊装工程",{"key":26,"text":668,"correct":21},"临时用水用电工程",{"key":29,"text":670,"correct":21},"季节性施工",{"key":32,"text":672,"correct":34},"管道工程",{"id":674,"libraryId":5,"type":14,"typeLabel":15,"stem":675,"options":676,"answer":487,"analysis":36},910632,"单位工程施工进度计划检查的主要内容包括（）。",[677,679,681,683,685],{"key":19,"text":678,"correct":34},"第一个工人是否拥有足够的工作面",{"key":23,"text":680,"correct":21},"各工作项目的施工顺序、平行搭接和技术间歇是否合理",{"key":26,"text":682,"correct":21},"总工期是否满足合同规定",{"key":29,"text":684,"correct":21},"主要工种的工人是否能满足连续、均衡施工的要求",{"key":32,"text":686,"correct":21},"主要施工机具、材料等的利用是否均衡和充分",{"id":688,"libraryId":5,"type":14,"typeLabel":15,"stem":689,"options":690,"answer":111,"analysis":36},910633,"建设单位编制的工程项目年度计划包括（ ）。",[691,692,694,696,697],{"key":19,"text":450,"correct":21},{"key":23,"text":693,"correct":34},"年度劳动生产率计划表",{"key":26,"text":695,"correct":34},"年度风险损失估算表",{"key":29,"text":452,"correct":21},{"key":32,"text":454,"correct":21},{"id":699,"libraryId":5,"type":14,"typeLabel":15,"stem":700,"options":701,"answer":293,"analysis":36},910634,"排列图又叫主次因素分析图或帕累特图，是用来寻找影响工程(产品)质量主要因素的一种有效工具，下列对于排列图的分析正确的有（ ）。",[702,704,706,708,710],{"key":19,"text":703,"correct":21},"累计频率在0～80％范围的因素，称为A类因素",{"key":23,"text":705,"correct":34},"累计频率在70％～85％范围内的为B类因素",{"key":26,"text":707,"correct":34},"累计频率在85％～90％范围内的为C类因素",{"key":29,"text":709,"correct":21},"累计频率在90％～100％范围内的为C类因素",{"key":32,"text":711,"correct":34},"累计频率在90％～100％范围内的为D类因素",[713,717,720,723,726,729],{"id":714,"name":715,"category":7,"favorite":716},1,"领导干部任职前廉政法规知识测试题",92,{"id":718,"name":719,"category":7,"favorite":714},595,"建筑结构与设备",{"id":721,"name":722,"category":7,"favorite":714},715,"招标采购专业知识与法律法规",{"id":724,"name":725,"category":7,"favorite":714},848,"市政方向-通用基础",{"id":727,"name":728,"category":7,"favorite":8},534,"BIM工程师",{"id":730,"name":728,"category":7,"favorite":8},535]