[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":571},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,5,50,2821,[13,34,44,56,68,80,92,104,114,125,137,149,161,173,185,197,209,221,229,237,245,257,268,276,288,299,311,319,331,340,352,361,373,381,389,399,411,423,435,447,459,471,483,495,507,519,527,539,551,559],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},908197,1,"单选题","(2012年)下列流水施工参数中，属于空间参数的是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","流水节奏",false,{"key":24,"text":25,"correct":22},"B","施工过程",{"key":27,"text":28,"correct":22},"C","流水步距",{"key":30,"text":31,"correct":32},"D","施工段",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},908198,"(2011年)建设工程流水施工中，某专业工作队在一个施工段上的施工时间称为()。",[38,39,41,43],{"key":20,"text":28,"correct":22},{"key":24,"text":40,"correct":32},"流水节拍",{"key":27,"text":42,"correct":22},"流水强度",{"key":30,"text":21,"correct":22},{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":27,"analysis":33},908199,"(2010年)固定节拍流水施工的特点之一是()。",[48,50,52,54],{"key":20,"text":49,"correct":22},"专业工作队数大于施工过程数",{"key":24,"text":51,"correct":22},"施工段之间可能存在空闲时间",{"key":27,"text":53,"correct":32},"流水节拍等于流水步距",{"key":30,"text":55,"correct":22},"流水步距数等于施工过程数",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":24,"analysis":33},908200,"（2017年考题）下列流水施工参数中,属于时间参数的是（ ）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"施工过程和流水步距",{"key":24,"text":63,"correct":32},"流水步距和流水节拍",{"key":27,"text":65,"correct":22},"施工段和流水强度",{"key":30,"text":67,"correct":22},"流水强度和工作面",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":30,"analysis":33},908201,"（2017年考题）其工程有3 个施工过程,分为4 个施工段组织流水施工。流水节拍分别为2、3、4、3 天；4、2、3、5 天；3、2、2、4 天。则流水施工工期为（ ）",[72,74,76,78],{"key":20,"text":73,"correct":22},"17",{"key":24,"text":75,"correct":22},"18",{"key":27,"text":77,"correct":22},"20",{"key":30,"text":79,"correct":32},"21",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":30,"analysis":33},908202,"(2016年)工程项目组织非节奏流水施工的特点是()。",[84,86,88,90],{"key":20,"text":85,"correct":22},"相邻施工过程的流水步距相等",{"key":24,"text":87,"correct":22},"各施工段上的流水节拍相等",{"key":27,"text":89,"correct":22},"施工段之间没有空闲时间",{"key":30,"text":91,"correct":32},"专业工作队数等于施工过程数",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":30,"analysis":33},908203,"(2018年)某分部工程流水施工计划如下图所示，该流水施工的组织形式是（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":22},"异步距异节奏流水施工",{"key":24,"text":99,"correct":22},"等步距异节奏流水施工",{"key":27,"text":101,"correct":22},"有提前插入时间的固定节拍流水施工",{"key":30,"text":103,"correct":32},"有间歇时间的固定节拍流水施工",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},908204,"(2018年)某工程有 3 个施工过程，分为 3 个施工段组织流水施工。3 个施工过程的流水节拍以此为 3、3、4 天，5、2、1 天和 4、1、5 天，则流水施工工期为（ ）天。",[108,110,111,112],{"key":20,"text":109,"correct":22},"6",{"key":24,"text":73,"correct":22},{"key":27,"text":75,"correct":32},{"key":30,"text":113,"correct":22},"19",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":27,"analysis":33},908205,"（2019年）某工程有3个施工过程，分4个施工段，组织加快的成倍节拍流水施工，3个施工过程的流水节拍分别为4天、2天、4天，则流水施工工期为（ ）天",[118,120,122,124],{"key":20,"text":119,"correct":22},"10",{"key":24,"text":121,"correct":22},"12",{"key":27,"text":123,"correct":32},"16",{"key":30,"text":75,"correct":22},{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":27,"analysis":33},908206,"（2019年）建设工程组织流水施工时，用来表述流水施工在施工工艺方面进展状态的参数是（ ）。",[129,131,133,135],{"key":20,"text":130,"correct":22},"施工段和流水步距",{"key":24,"text":132,"correct":22},"流水步距和施工过程",{"key":27,"text":134,"correct":32},"施工过程和流水强度",{"key":30,"text":136,"correct":22},"流水强度和施工段",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":20,"analysis":33},908207,"（2019年）下列工程项目目标控制方法中，可用来随时了解生产过程中质量变化情况的方法是（）",[141,143,145,147],{"key":20,"text":142,"correct":32},"控制图法",{"key":24,"text":144,"correct":22},"排列图法",{"key":27,"text":146,"correct":22},"直方图法",{"key":30,"text":148,"correct":22},"鱼刺图法",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":20,"analysis":33},908210,"(2012年)在工程网络计划中，关键工作是指()的工作。",[153,155,157,159],{"key":20,"text":154,"correct":32},"最迟完成时间与最早完成时间的差值最小",{"key":24,"text":156,"correct":22},"双代号网络计划中开始节点和完成节点均为关键节点",{"key":27,"text":158,"correct":22},"双代号时标网络计划中无波形线",{"key":30,"text":160,"correct":22},"单代号网络计划中时间间隔为零",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":27,"analysis":33},908211,"(2012年)工程网络计划费用优化是通过()寻求工程总成本最低时的工期安排。",[165,167,169,171],{"key":20,"text":166,"correct":22},"调整组合直接费用率最小的关键工作的逻辑关系",{"key":24,"text":168,"correct":22},"缩短组合直接费用率最大的关键工作的持续时间",{"key":27,"text":170,"correct":32},"缩短组合直接费用率最小的关键工作的持续时间",{"key":30,"text":172,"correct":22},"调整组合直接费用率最大的关键工作的逻辑关系",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":27,"analysis":33},908212,"(2011年)在工程网络计划中，关键工作是指()的工作。",[177,179,181,183],{"key":20,"text":178,"correct":22},"时间间隔为零",{"key":24,"text":180,"correct":22},"自由时差最小",{"key":27,"text":182,"correct":32},"总时差最小",{"key":30,"text":184,"correct":22},"流水步距为零",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":30,"analysis":33},908213,"(2010年)工程网络计划工期优化的目标是()。",[189,191,193,195],{"key":20,"text":190,"correct":22},"计划工期满足合同工期",{"key":24,"text":192,"correct":22},"计算工期满足计划工期",{"key":27,"text":194,"correct":22},"要求工期满足合同工期",{"key":30,"text":196,"correct":32},"计算工期满足要求工期",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":30,"analysis":33},908214,"(2015年)单代号网络计划中，关键线路是指( )的线路。",[201,203,205,207],{"key":20,"text":202,"correct":22},"由关键工作组成",{"key":24,"text":204,"correct":22},"相邻两项工作之间时距均为零",{"key":27,"text":206,"correct":22},"由关键节点组成",{"key":30,"text":208,"correct":32},"相邻两项工作之间时间间隔均为零",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":30,"analysis":33},908215,"(2013年)某工程双代号网络计划如下图所示，其中关键线路有()条。",[213,215,217,219],{"key":20,"text":214,"correct":22},"1",{"key":24,"text":216,"correct":22},"2",{"key":27,"text":218,"correct":22},"3",{"key":30,"text":220,"correct":32},"4",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},908216,"(2012年)某工程双代号网络计划如下图所示，其中关键线路有()条。",[225,226,227,228],{"key":20,"text":214,"correct":22},{"key":24,"text":216,"correct":32},{"key":27,"text":218,"correct":22},{"key":30,"text":220,"correct":22},{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},908217,"(2011年)某工程双代号网络计划如下图所示，其中关键线路有()条。",[233,234,235,236],{"key":20,"text":220,"correct":22},{"key":24,"text":218,"correct":32},{"key":27,"text":216,"correct":22},{"key":30,"text":214,"correct":22},{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},908218,"(2010年)某工程双代号网络计划如下图所示，其中关键线路有()条。",[241,242,243,244],{"key":20,"text":214,"correct":32},{"key":24,"text":216,"correct":22},{"key":27,"text":218,"correct":22},{"key":30,"text":220,"correct":22},{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":30,"analysis":33},908219,"(2015年)某工程双代号网络计划如下图所示。当计划工期等于计算工期时，工作D的自由时差和总时差分别是()。",[249,251,253,255],{"key":20,"text":250,"correct":22},"2和2",{"key":24,"text":252,"correct":22},"1和2",{"key":27,"text":254,"correct":22},"0和2",{"key":30,"text":256,"correct":32},"0和1",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},908220,"(2009年)在工程网络计划中，关键线路是指()的线路。",[261,262,264,266],{"key":20,"text":158,"correct":32},{"key":24,"text":263,"correct":22},"单代号网络计划中由关键工作组成",{"key":27,"text":265,"correct":22},"双代号网络计划中由关键节点组成",{"key":30,"text":267,"correct":22},"双代号网络计划中无虚箭线",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},908221,"(2009年)某工程双代号网络计划如下图所示，其中关键线路有()条。",[272,273,274,275],{"key":20,"text":214,"correct":22},{"key":24,"text":216,"correct":32},{"key":27,"text":218,"correct":22},{"key":30,"text":220,"correct":22},{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":30,"analysis":33},908222,"(2009年)工程网络计划费用优化的目的是为了寻求()。",[280,282,284,286],{"key":20,"text":281,"correct":22},"资源均衡使用条件下最低成本的计划安排",{"key":24,"text":283,"correct":22},"资源有限条件下最低成本的计划安排",{"key":27,"text":285,"correct":22},"工程总成本固定条件下的最优工期安排",{"key":30,"text":287,"correct":32},"工程总成本最低时的最优工期安排",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":20,"analysis":33},908223,"(2013年)工程网络计划费用优化的目的是为了寻求()。",[292,293,295,297],{"key":20,"text":287,"correct":32},{"key":24,"text":294,"correct":22},"工期固定条件下的工程费用均衡安排",{"key":27,"text":296,"correct":22},"工程总成本固定条件下的最短工期安排",{"key":30,"text":298,"correct":22},"工期最短条件下的最低工程总成本安排",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":20,"analysis":33},908224,"(2011年)在建设工程施工方案一定的前提下，工程费用会因工期的不同而不同，随着工期的缩短，工程费用的变化趋势是()。",[303,305,307,309],{"key":20,"text":304,"correct":32},"直接费增加，间接费减少",{"key":24,"text":306,"correct":22},"直接费和间接费均增加",{"key":27,"text":308,"correct":22},"直接费减少，间接费增加",{"key":30,"text":310,"correct":22},"直接费和间接费均减少",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":27,"analysis":33},908225,"(2014年)工程网络计划中，关键线路是指（ ）的线路。",[315,316,317,318],{"key":20,"text":267,"correct":22},{"key":24,"text":263,"correct":22},{"key":27,"text":158,"correct":32},{"key":30,"text":265,"correct":22},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":27,"analysis":33},908226,"(2015年)计划工期与计算工期相等的双代号网络计划中，某工作的开始节点和完成节点均为关键节点时，说明该工作()。",[323,325,327,329],{"key":20,"text":324,"correct":22},"一定是关键工作",{"key":24,"text":326,"correct":22},"总时差为零",{"key":27,"text":328,"correct":32},"总时差等于自由时差",{"key":30,"text":330,"correct":22},"自由时差为零",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},908227,"(2016年)单代号网络计划中，关键线路是指()的线路。",[335,336,337,338],{"key":20,"text":202,"correct":22},{"key":24,"text":208,"correct":32},{"key":27,"text":206,"correct":22},{"key":30,"text":339,"correct":22},"相邻两项工作之间间歇时间均相等",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":30,"analysis":33},908228,"(2016年)工程网络计划费用优化的基本思路是，在网络计划中，当有多条关键线路时，应通过不断缩短()的关键工作持续时间来达到优化目的。",[344,346,348,350],{"key":20,"text":345,"correct":22},"直接费总和最大",{"key":24,"text":347,"correct":22},"组合间接费用率最小",{"key":27,"text":349,"correct":22},"间接费总和最大",{"key":30,"text":351,"correct":32},"组合直接费用率最小",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":30,"analysis":33},908229,"（2017年考题）工程网络计划中工作，D 有两项紧后工作,最早开始时同分别为 17 和 20，工作 D 的最开始时间为 12,持续时间为 3,则工作 D的自由时差为（ ）。",[356,358,359,360],{"key":20,"text":357,"correct":22},"5",{"key":24,"text":220,"correct":22},{"key":27,"text":218,"correct":22},{"key":30,"text":216,"correct":32},{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":27,"analysis":33},908230,"（2017年考题）工程网络计划资源优化的目的是通过改变（ ），使资源按照时间的分布符会优化目标。",[365,367,369,371],{"key":20,"text":366,"correct":22},"工作间逻辑关系",{"key":24,"text":368,"correct":22},"工作的持续时间",{"key":27,"text":370,"correct":32},"工作的开始时间和完成时间",{"key":30,"text":372,"correct":22},"工作的资源强度",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},908231,"(2014年)某工程双代号网络计划如下图所示，其中关键线路有（ ）条。",[377,378,379,380],{"key":20,"text":216,"correct":22},{"key":24,"text":218,"correct":32},{"key":27,"text":220,"correct":22},{"key":30,"text":357,"correct":22},{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},908232,"(2018年)某工程网络计划中，工作M 有两项紧后工作，最早开始时间分别为12 和13.工作M 的最早开始时间为8，持续时间为3，则工作M 的自由时差为（ ）。",[385,386,387,388],{"key":20,"text":214,"correct":32},{"key":24,"text":216,"correct":22},{"key":27,"text":218,"correct":22},{"key":30,"text":220,"correct":22},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},908233,"(2018年)工程网络计划中，对关键线路的描述正确的是（ ）。",[393,394,396,398],{"key":20,"text":265,"correct":22},{"key":24,"text":395,"correct":32},"单代号网络计划中时间间隔均为0",{"key":27,"text":397,"correct":22},"双代号时标网络计划中无虚工作",{"key":30,"text":263,"correct":22},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":27,"analysis":33},908234,"(2018年)为缩短工期而采取的进度计划调整方法中，不需要改变网络计划中工作间逻辑关系的是（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"将顺序进行的工作改为平行工作",{"key":24,"text":406,"correct":22},"重新划分施工段组织流水施工",{"key":27,"text":408,"correct":32},"采取措施压缩关键工作持续时间",{"key":30,"text":410,"correct":22},"将顺序进行的工作改为搭接工作",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},908235,"（2019年）双代号网络计划中关于关键节点的说法正确的是（）",[415,417,419,421],{"key":20,"text":416,"correct":32},"关键工作两端的节点必然是关键节点",{"key":24,"text":418,"correct":22},"关键节点的最早时间与最迟时间必然相等",{"key":27,"text":420,"correct":22},"关键节点组成的线路必然是关键线路",{"key":30,"text":422,"correct":22},"两端是关键节点的工作必然是关键工作",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},908238,"（2019年）根据《标准设计施工总承包招标文件》(2012年版)，合同文件包括下列内容：①发包人要求，②中标通知书，③承包人建议，仅就上述三项内容而言，合同文件优先解释顺序为( )。",[427,429,431,433],{"key":20,"text":428,"correct":22},"①②③",{"key":24,"text":430,"correct":32},"②①③",{"key":27,"text":432,"correct":22},"③①②",{"key":30,"text":434,"correct":22},"③②①",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},908241,"（2019年）保证工程项目管理信息系统正常运行基础是（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"结构化数据",{"key":24,"text":442,"correct":32},"信息管理制度",{"key":27,"text":444,"correct":22},"计算机网络环境",{"key":30,"text":446,"correct":22},"非结构化数据",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},908242,"(2013年)某工程建设期2年，建设单位在建设期第1年初和第2年初分别从银行借入资金600万元和400万元，年利率8%，按年计息，建设单位在运营期第3年末偿还贷款500万元后，自运营期第5年末应偿还()万元才能还清贷款本息。",[451,453,455,457],{"key":20,"text":452,"correct":22},"925.78",{"key":24,"text":454,"correct":22},"956.66",{"key":27,"text":456,"correct":32},"1079.84",{"key":30,"text":458,"correct":22},"1163.04",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":24,"analysis":33},908243,"(2012年)某企业连续3年每年初从银行借入资金500万元，年利率8%，按年计息，第3年末一次性还本付息，则第3年末应还本付息()万元。",[463,465,467,469],{"key":20,"text":464,"correct":22},"1893.30",{"key":24,"text":466,"correct":32},"1753.06",{"key":27,"text":468,"correct":22},"1623.20",{"key":30,"text":470,"correct":22},"1620.00",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},908244,"(2012年)某企业从银行借入1年期的短期借款500万元，年利率12%，按季度计算并支付利息，则每季度需支付利息()万元。",[475,477,479,481],{"key":20,"text":476,"correct":32},"15.00",{"key":24,"text":478,"correct":22},"15.15",{"key":27,"text":480,"correct":22},"15.69",{"key":30,"text":482,"correct":22},"20.00",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":30,"analysis":33},908245,"(2011年)某项目有甲、乙、丙、丁4个可行方案，投资额和年经营成本见下表。若基准收益率为10%，采用增量投资收益率比选，最优方案为()方案。",[487,489,491,493],{"key":20,"text":488,"correct":22},"甲",{"key":24,"text":490,"correct":22},"乙",{"key":27,"text":492,"correct":22},"丙",{"key":30,"text":494,"correct":32},"丁",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},908246,"(2010年)在工程经济分析中，经常采用()计算资金的时间价值。",[499,501,503,505],{"key":20,"text":500,"correct":22},"连续复利",{"key":24,"text":502,"correct":32},"间断复利",{"key":27,"text":504,"correct":22},"连续单利",{"key":30,"text":506,"correct":22},"瞬时单利",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},908247,"(2015年)某项两年期借款，年名义利率12%，按季度计息，则每季度的有效利率为( )。",[511,513,515,517],{"key":20,"text":512,"correct":32},"3.00%",{"key":24,"text":514,"correct":22},"3.03%",{"key":27,"text":516,"correct":22},"3.14%",{"key":30,"text":518,"correct":22},"3.17%",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},908248,"(2016年)在资金时间价值的作用下，下列现金流量图（单位：万元）中，有可能与第2期末1000万元现金流入等值的是()。",[523,524,525,526],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":32},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},908249,"(2016年)某项借款，年名义利率10%，按季复利计息，则季有效利率为()。",[531,533,535,537],{"key":20,"text":532,"correct":22},"2.41%",{"key":24,"text":534,"correct":32},"2.50%",{"key":27,"text":536,"correct":22},"2.52%",{"key":30,"text":538,"correct":22},"3.23%",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},908250,"(2016年)采用增量投资内部收益率（ΔIRR）法比选计算期不同的互斥方案时，对于已通过绝对效果检验的投资方案，确定优选方案的准则是()。",[543,545,547,549],{"key":20,"text":544,"correct":22},"AIRR大于基准收益率时，选择初始投资额小的方案",{"key":24,"text":546,"correct":32},"AIRR大于基准收益率时，选择初始投资额大的方案",{"key":27,"text":548,"correct":22},"无论AIRR是否大于基准收益率时，均选择初始投资额小的方案",{"key":30,"text":550,"correct":22},"无论AIRR是否大于基准收益率时，均选择初始投资额大的方案",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},908251,"(2015年)在资金时间价值的作用下，下列现金流量图（单位：万元）中，有可能与第2期期末800万元现金流入等值的是()。",[555,556,557,558],{"key":20,"text":20,"correct":32},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},908252,"(2013年)影响利率的因素有多种，通常情况下，利率的最高界限是()。",[563,565,567,569],{"key":20,"text":564,"correct":22},"社会最大利润率",{"key":24,"text":566,"correct":32},"社会平均利润率",{"key":27,"text":568,"correct":22},"社会最大利税率",{"key":30,"text":570,"correct":22},"社会平均利税率",[572,575,578,581,584,587],{"id":15,"name":573,"category":7,"favorite":574},"领导干部任职前廉政法规知识测试题",92,{"id":576,"name":577,"category":7,"favorite":15},595,"建筑结构与设备",{"id":579,"name":580,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":582,"name":583,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":585,"name":586,"category":7,"favorite":8},534,"BIM工程师",{"id":588,"name":586,"category":7,"favorite":8},535]