[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-47":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":696},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,47,50,2821,[13,38,53,68,83,98,113,128,143,157,171,186,201,215,230,245,259,274,289,303,317,329,337,351,365,379,393,404,417,432,446,459,469,483,496,508,519,531,544,555,566,581,593,602,616,630,644,658,672,682],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},910424,2,"多选题","采用净现值和内部收益率指标评价投资方案经济效果的共同特点有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","均不受外部参数的影响",false,{"key":24,"text":25,"correct":26},"B","均是动态评价指标",true,{"key":28,"text":29,"correct":26},"C","均可对独立方案进行评价",{"key":31,"text":32,"correct":22},"D","都要在确定基准收益率的基础上进行计算",{"key":34,"text":35,"correct":22},"E","计算均较简单","BC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},910426,"投资者自行测定完全由自有资金投资的技术方案的最低可接受财务收益率时，应考虑的因素有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"沉没成本",{"key":24,"text":45,"correct":26},"机会成本",{"key":28,"text":47,"correct":26},"资金成本",{"key":31,"text":49,"correct":26},"通货膨胀",{"key":34,"text":51,"correct":26},"投资风险","BCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},910427,"项目盈亏平衡分析中，若其它条件不变，可以降低盈亏平衡点产量的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"提高设计生产能力",{"key":24,"text":60,"correct":26},"降低固定成本",{"key":28,"text":62,"correct":22},"降低产品售价",{"key":31,"text":64,"correct":26},"降低单位产品变动成本",{"key":34,"text":66,"correct":22},"提高营业税金及附加率","BD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},910429,"与发行股票相比，企业通过发行债券筹集资金的特点包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"发挥财务杠杆作用",{"key":24,"text":75,"correct":26},"企业少纳所得税",{"key":28,"text":77,"correct":22},"企业筹资的资金成本较高",{"key":31,"text":79,"correct":22},"可降低企业的负债比率",{"key":34,"text":81,"correct":26},"企业原有投资者的控制权不变","ABE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},910431,"下列关于建筑职工意外伤害保险的表述中，正确的是（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"已在企业所在地参加工伤保险的人员，从事现场施工时不能参加建筑意外伤害保险",{"key":24,"text":90,"correct":22},"建筑职工意外伤害保险属于法定的强制性保险",{"key":28,"text":92,"correct":26},"建筑职工意外伤害保险投保的保险金额不得低于本地区最低保险金额",{"key":31,"text":94,"correct":26},"建筑职工意外伤害保险实行差别费率和浮动费率",{"key":34,"text":96,"correct":22},"建筑职工意外伤害保险以建筑施工企业为单位进行投保","CD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},910432,"计算土地增值税时，允许从房地产转让收入中扣除的项目有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"取得土地使用权支付的金额",{"key":24,"text":105,"correct":26},"旧房及建筑物的评估价格",{"key":28,"text":107,"correct":26},"与转让房地产有关的税金",{"key":31,"text":109,"correct":22},"房地产开发利润",{"key":34,"text":111,"correct":26},"房地产开发成本","ABCE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},910433,"下列实物项目中，可投保建筑工程一切险的有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"工地内现成的建筑物",{"key":24,"text":120,"correct":26},"业主采购并已运抵工地范围内的材料",{"key":28,"text":122,"correct":26},"工地范围内施工用的推土机",{"key":31,"text":124,"correct":22},"工地范围内施工用的规范、文件",{"key":34,"text":126,"correct":22},"工程设计文件及有关批复文件","ABC",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},910434,"资本金现金流量表中，作为现金流出的项目的有（ ）",[132,134,136,138,140],{"key":20,"text":133,"correct":26},"借款本金偿还",{"key":24,"text":135,"correct":22},"回收固定资产余值",{"key":28,"text":137,"correct":26},"借款利息支付",{"key":31,"text":139,"correct":26},"经营成本",{"key":34,"text":141,"correct":22},"回收流动资金","ACD",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":52,"analysis":37},910435,"下列对于工程项目经济评价报表的编制描述正确的有（ ）。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"投资现金流量表反映投资方案在生产运营期内现金的流入和流出",{"key":24,"text":150,"correct":26},"资本金现金流量表是从投资方案权益投资者整体角度出发",{"key":28,"text":152,"correct":26},"投资各方现金流量表是分别从投资方案各个投资者的角度出发",{"key":31,"text":154,"correct":26},"投资各方现金流量表以投资者的出资额作为计算的基础",{"key":34,"text":156,"correct":26},"财务计划现金流量表用于计算累计盈余资金，分析投资方案的财务生存能力",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":52,"analysis":37},910436,"下列选项中属于施工图预算的审查方法是（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"联合会审法",{"key":24,"text":164,"correct":26},"对比审查法",{"key":28,"text":166,"correct":26},"重点抽查法",{"key":31,"text":168,"correct":26},"筛选审查法",{"key":34,"text":170,"correct":26},"全面审查法",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},910437,"对工程项目施工图预算的审查内容包括（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":26},"工程量的审查",{"key":24,"text":178,"correct":26},"定额使用的审查",{"key":28,"text":180,"correct":26},"设备材料及人工、机械价格的审查",{"key":31,"text":182,"correct":26},"相关费用的审查",{"key":34,"text":184,"correct":22},"工程环境影响程度的审查","ABCD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":200,"analysis":37},910438,"根据《标准施工招标文件》，除专用合同条款另有约定外，因不可抗力导致后果，下列关于合同双方承担原则说法正确的是（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"已运至施工场地的材料和工程设备的损害由发包人和承包人共同承担",{"key":24,"text":193,"correct":22},"发包人承担所有人员伤亡的损失",{"key":28,"text":195,"correct":22},"承包人设备的损坏由发包人承担",{"key":31,"text":197,"correct":26},"合同一方当事人延迟履行，在延迟履行期间发生不可抗力的，不免除其责任",{"key":34,"text":199,"correct":26},"停工期间应监理人要求清理和修复工程的金额由发包人承担","DE",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":127,"analysis":37},910440,"根据《标准施工招标文件》，下列工作属于发包人应承担的义务是（ ）。",[205,207,209,211,213],{"key":20,"text":206,"correct":26},"协助承包人办理法律规定的有关施工证件",{"key":24,"text":208,"correct":26},"委托监理人发出开工通知",{"key":28,"text":210,"correct":26},"提供施工场地内地下管线和地下设施等有关资料",{"key":31,"text":212,"correct":22},"负责施工场地周边环境与生态的保护",{"key":34,"text":214,"correct":22},"避免施工对公众与他人的利益造成损害",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},910442,"根据《标准施工招标文件》中的合同条款，需要由承包人承担的有（ ）。",[219,221,223,225,227],{"key":20,"text":220,"correct":26},"承包人协助监理人使用施工控制网所发生的费用",{"key":24,"text":222,"correct":26},"承包人车辆外出行驶所发生的场外公共道路通行费用",{"key":28,"text":224,"correct":22},"发包人提供的测量基准点有误导致承包人测量放线返工所发生的费用",{"key":31,"text":226,"correct":22},"监理人剥离检查已覆盖合格隐蔽工程所发生的费用",{"key":34,"text":228,"correct":22},"承包人修建临时设施需要临时占地所发生的费用","AB",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},910443,"根据《建设项目工程总承包合同（示范文本）》，对于经协商或调解确定的发包人应得的索赔款项，发包人可能的获得方式有（ ）。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"从预付款保函中抵扣",{"key":24,"text":237,"correct":26},"从履约保函中抵扣",{"key":28,"text":239,"correct":22},"从支付保函中抵扣",{"key":31,"text":241,"correct":26},"从当月工程进度款中抵扣",{"key":34,"text":243,"correct":26},"按协商支付协议支付","BDE",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":185,"analysis":37},910444,"根据《标准施工招标文件》工程变更的情形有（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"改变合同中某项工作的质量",{"key":24,"text":252,"correct":26},"改变合同工程原定的位置",{"key":28,"text":254,"correct":26},"改变合同中已批准的施工顺序",{"key":31,"text":256,"correct":26},"为完成工程需要追加的额外工作",{"key":34,"text":258,"correct":22},"取消某项工作改由建设单位自行完成",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":273,"analysis":37},910445,"根据《标准施工招标文件》，下列事件中，承包人向发包人既可索赔工期又可索赔费用的有（ ）。",[263,265,267,269,271],{"key":20,"text":264,"correct":26},"提供图纸延误",{"key":24,"text":266,"correct":26},"承包人遇到不利物质条件",{"key":28,"text":268,"correct":22},"发包人的原因造成试运行失败",{"key":31,"text":270,"correct":26},"施工过程发现文物",{"key":34,"text":272,"correct":22},"法律变化导致的价格调整","ABD",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":288,"analysis":37},910446,"某工程施工至某月底，经偏差分析得到费用偏差（CV）＞0，进度偏差（SV）＞0，则表明（ ）。",[278,280,282,284,286],{"key":20,"text":279,"correct":26},"已完工程实际费用节约",{"key":24,"text":281,"correct":22},"已完工程实际费用＞已完工程计划费用",{"key":28,"text":283,"correct":22},"拟完工程计划费用＞已完工程实际费用",{"key":31,"text":285,"correct":26},"已完工程实际进度超前",{"key":34,"text":287,"correct":22},"拟完工程计划费用＞已完工程计划费用","AD",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":229,"analysis":37},910448,"建设工程组织流水施工时，确定流水节拍的方法有（ ）。",[293,295,297,299,301],{"key":20,"text":294,"correct":26},"定额计算法",{"key":24,"text":296,"correct":26},"经验估计法",{"key":28,"text":298,"correct":22},"价值工程法",{"key":31,"text":300,"correct":22},"ABC 分析法",{"key":34,"text":302,"correct":22},"风险概率法",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":36,"analysis":37},910449,"价值工程方案评价中，可针对方案进行综合评价的定量方法有（ ）",[307,309,311,313,315],{"key":20,"text":308,"correct":22},"头脑风暴法",{"key":24,"text":310,"correct":26},"直接评分法",{"key":28,"text":312,"correct":26},"加权评分法",{"key":31,"text":314,"correct":22},"优缺点列举法",{"key":34,"text":316,"correct":22},"专家检查法",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":97,"analysis":37},910450,"应用价值工程，对所提出的替代方案进行定量综合评价可采用的方法有（ ）。",[321,322,324,325,327],{"key":20,"text":314,"correct":22},{"key":24,"text":323,"correct":22},"德尔菲法",{"key":28,"text":312,"correct":26},{"key":31,"text":326,"correct":26},"强制评分法",{"key":34,"text":328,"correct":22},"连环替代法",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":36,"analysis":37},910451,"下列评价方法中,用于互斥投资方案静态分析评价的有（ ）。 A. 增量投资内部收益率法 B. 增量投资收益率法 C. 增量投资回收期法 D. 净年值法",[333,334,335,336],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":142,"analysis":37},910452,"关于施工图预算的审查方法，下列说法正确的是（ ）",[341,343,345,347,349],{"key":20,"text":342,"correct":26},"标准预算审查法适用于通用图纸施工且上部结构和做法相同的工程",{"key":24,"text":344,"correct":22},"筛选审查法不适用住宅工程",{"key":28,"text":346,"correct":26},"分组计算审查法能够加快审查工程量的速度",{"key":31,"text":348,"correct":26},"逐项审查法适用于工艺较简单的工程",{"key":34,"text":350,"correct":22},"利用手册审查法不能简化预结算的编审工作",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":127,"analysis":37},910454,"运用费用效率法进行寿命周期成本分析时，估算费用的常用方法包括（ ）",[355,357,359,361,363],{"key":20,"text":356,"correct":26},"费用模型估算法",{"key":24,"text":358,"correct":26},"参数估算法",{"key":28,"text":360,"correct":26},"类比估算法",{"key":31,"text":362,"correct":22},"权衡估算法",{"key":34,"text":364,"correct":22},"效率估算法",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":273,"analysis":37},910455,"常用的寿命周期成本评价方法有（ ）",[369,371,373,375,377],{"key":20,"text":370,"correct":26},"费用效率法",{"key":24,"text":372,"correct":26},"固定费用法",{"key":28,"text":374,"correct":22},"目标成本法",{"key":31,"text":376,"correct":26},"权衡分析法",{"key":34,"text":378,"correct":22},"盈亏平衡法",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":36,"analysis":37},910456,"在价值工程活动中，可用来确定功能重要性系数的强制评分法包括（ ）",[383,385,387,389,391],{"key":20,"text":384,"correct":22},"环比评分法",{"key":24,"text":386,"correct":26},"0-1 评分法",{"key":28,"text":388,"correct":26},"0-4 评分法",{"key":31,"text":390,"correct":22},"逻辑评分法",{"key":34,"text":392,"correct":22},"多比例评分法",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":142,"analysis":37},910457,"价值工程活动中，用来确定产品功能评价值的方法有（ ）。P",[397,398,400,401,402],{"key":20,"text":384,"correct":26},{"key":24,"text":399,"correct":22},"替代评分法",{"key":28,"text":326,"correct":26},{"key":31,"text":390,"correct":26},{"key":34,"text":403,"correct":22},"循环评分法",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":416,"analysis":37},910460,"常用的寿命周期成本评价方法包括（ ）",[408,410,412,413,415],{"key":20,"text":409,"correct":22},"敏感因素法",{"key":24,"text":411,"correct":22},"强制确定法",{"key":28,"text":376,"correct":26},{"key":31,"text":414,"correct":22},"记忆模型法",{"key":34,"text":370,"correct":26},"CE",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":431,"analysis":37},910461,"下列评价指标中，属于投资方案经济效果静态评价指标的有（ ）。",[421,423,425,427,429],{"key":20,"text":422,"correct":22},"内部收益率",{"key":24,"text":424,"correct":26},"利息备付率",{"key":28,"text":426,"correct":26},"投资收益率",{"key":31,"text":428,"correct":26},"资产负债率",{"key":34,"text":430,"correct":22},"净现值率","BCD",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":142,"analysis":37},910462,"下列评价方法，属于互斥投资方案静态评价方法的有（ ）",[436,438,440,442,444],{"key":20,"text":437,"correct":26},"年折算费用法",{"key":24,"text":439,"correct":22},"净现值率法",{"key":28,"text":441,"correct":26},"增量投资回收期法",{"key":31,"text":443,"correct":26},"增量投资收益率法",{"key":34,"text":445,"correct":22},"增量投资内部收益率法",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":458,"analysis":37},910463,"在价值工程活动中进行功能评价时，可用于确定功能重要性系数的方法有（ ）",[450,452,454,455,457],{"key":20,"text":451,"correct":26},"强制打分法",{"key":24,"text":453,"correct":22},"排列图法",{"key":28,"text":392,"correct":26},{"key":31,"text":456,"correct":22},"因素分析法",{"key":34,"text":384,"correct":26},"ACE",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":127,"analysis":37},910464,"施工图预算审查的方法有（ ）",[463,464,465,466,468],{"key":20,"text":170,"correct":26},{"key":24,"text":166,"correct":26},{"key":28,"text":164,"correct":26},{"key":31,"text":467,"correct":22},"系数估算审查法",{"key":34,"text":162,"correct":22},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":416,"analysis":37},910465,"在下列建设工程项目目标控制方法中，可用来综合控制工程进度和工程造价的方法有（ ）",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"树枝图法",{"key":24,"text":476,"correct":22},"网络计划法",{"key":28,"text":478,"correct":26},"S 曲线法",{"key":31,"text":480,"correct":22},"决策树法",{"key":34,"text":482,"correct":26},"香蕉曲线法",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":495,"analysis":37},910466,"施工项目成本分析的基本方法包括（ ）。",[487,488,490,491,493],{"key":20,"text":456,"correct":26},{"key":24,"text":489,"correct":26},"差额计算法",{"key":28,"text":326,"correct":22},{"key":31,"text":492,"correct":26},"动态比率法",{"key":34,"text":494,"correct":26},"相关比率法","ABDE",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":507,"analysis":37},910467,"在价值工程活动中，常用的方案综合评价方法包括（ ）",[500,501,502,503,505],{"key":20,"text":314,"correct":26},{"key":24,"text":453,"correct":22},{"key":28,"text":326,"correct":26},{"key":31,"text":504,"correct":22},"相关因素法",{"key":34,"text":506,"correct":22},"分层法","AC",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":52,"analysis":37},910468,"在价值工程活动中，常用于方案综合评价的定量方法包括（ ）。",[512,513,514,515,517],{"key":20,"text":314,"correct":22},{"key":24,"text":310,"correct":26},{"key":28,"text":312,"correct":26},{"key":31,"text":516,"correct":26},"比较价值评分法",{"key":34,"text":518,"correct":26},"几何平均值评分法",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":530,"analysis":37},910469,"下列评价方法中，属于互斥型投资方案经济效果动态评价方法的有（ ）",[523,524,525,526,528],{"key":20,"text":445,"correct":26},{"key":24,"text":437,"correct":22},{"key":28,"text":441,"correct":22},{"key":31,"text":527,"correct":26},"方案重复法",{"key":34,"text":529,"correct":26},"无限计算期法","ADE",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":36,"analysis":37},910470,"在下列投资方案经济效果评价方法中，属于动态评价方法的有（ ）",[535,537,539,541,542],{"key":20,"text":536,"correct":22},"增量投资收益法",{"key":24,"text":538,"correct":26},"增量内部收益率法",{"key":28,"text":540,"correct":26},"最小公倍数法",{"key":31,"text":441,"correct":22},{"key":34,"text":543,"correct":22},"综合总费用法",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":244,"analysis":37},910471,"对于计算周期相同的互斥方案，可采用的经济效果动态评价方法有（ ）",[548,549,551,552,554],{"key":20,"text":443,"correct":22},{"key":24,"text":550,"correct":26},"净现值法",{"key":28,"text":441,"correct":22},{"key":31,"text":553,"correct":26},"净年值法",{"key":34,"text":445,"correct":26},{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":431,"analysis":37},910472,"下列建设工程项目目标控制方法中，可用来判断工程进度偏差的有（ ）",[559,561,562,563,564],{"key":20,"text":560,"correct":22},"直方图法",{"key":24,"text":476,"correct":26},{"key":28,"text":478,"correct":26},{"key":31,"text":482,"correct":26},{"key":34,"text":565,"correct":22},"控制图法",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":580,"analysis":37},910474,"施工合同签订后，工程项目施工成本计划的常用编制方法有（ ）",[570,572,574,576,578],{"key":20,"text":571,"correct":22},"专家意见法",{"key":24,"text":573,"correct":22},"功能指数法",{"key":28,"text":575,"correct":26},"目标利润法",{"key":31,"text":577,"correct":26},"技术进步法",{"key":34,"text":579,"correct":26},"定律估算法","CDE",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":580,"analysis":37},910475,"采用净现值法评价计算期不同的互斥方案时，确定共同计算期的方法有（ ）",[585,587,589,590,592],{"key":20,"text":586,"correct":22},"最大公约数法",{"key":24,"text":588,"correct":22},"平均寿命期法",{"key":28,"text":540,"correct":26},{"key":31,"text":591,"correct":26},"研究期法",{"key":34,"text":529,"correct":26},{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":52,"analysis":37},910476,"互斥型投资方案经济效果评价可采用的静态分析方法有（ ）。",[597,598,599,600,601],{"key":20,"text":540,"correct":22},{"key":24,"text":443,"correct":26},{"key":28,"text":441,"correct":26},{"key":31,"text":543,"correct":26},{"key":34,"text":437,"correct":26},{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":97,"analysis":37},910477,"为有效控制工程造价，应将工程造价管理的重点放在（ ）阶段。",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"施工招标",{"key":24,"text":609,"correct":22},"施工",{"key":28,"text":611,"correct":26},"策划决策",{"key":31,"text":613,"correct":26},"设计",{"key":34,"text":615,"correct":22},"竣工验收",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":185,"analysis":37},910478,"工程造价管理是指综合运用管理学、经济学和工程技术等方面的知识和技能，对工程造价进行（ ）等的过程。",[620,622,624,626,628],{"key":20,"text":621,"correct":26},"预测",{"key":24,"text":623,"correct":26},"计划",{"key":28,"text":625,"correct":26},"控制",{"key":31,"text":627,"correct":26},"核算",{"key":34,"text":629,"correct":22},"管理",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":495,"analysis":37},910479,"建设工程全要素造价管理是指除控制建设工程本身的建造成本外，还应同时考虑对建设工程（ ）的控制。",[634,636,638,640,642],{"key":20,"text":635,"correct":26},"工期成本",{"key":24,"text":637,"correct":26},"质量成本",{"key":28,"text":639,"correct":22},"运营成本",{"key":31,"text":641,"correct":26},"安全成本",{"key":34,"text":643,"correct":26},"环境成本",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":82,"analysis":37},910480,"下列选项中属于国务院建设主管部门造价管理机构的主要职责有（ ）。",[648,650,652,654,656],{"key":20,"text":649,"correct":26},"制定法规、制度",{"key":24,"text":651,"correct":26},"编制、修订全国定额",{"key":28,"text":653,"correct":22},"本行业大型或重点项目的概算审批",{"key":31,"text":655,"correct":22},"审核国家投资工程的标底",{"key":34,"text":657,"correct":26},"监督指导全国定额实施",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":244,"analysis":37},910481,"实施有效的工程造价管理，应遵循（）原则。",[662,664,666,668,670],{"key":20,"text":663,"correct":22},"以施工阶段为重点进行控制",{"key":24,"text":665,"correct":26},"以设计阶段为重点进行全过程造价管理",{"key":28,"text":667,"correct":22},"实施全过程造价控制",{"key":31,"text":669,"correct":26},"技术与经济相结合",{"key":34,"text":671,"correct":26},"主动控制与被动控制相结合",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":244,"analysis":37},910482,"为有效地控制工程造价，应做到（ ）。",[676,677,679,680,681],{"key":20,"text":663,"correct":22},{"key":24,"text":678,"correct":26},"以设计阶段为重点进行控制",{"key":28,"text":667,"correct":22},{"key":31,"text":669,"correct":26},{"key":34,"text":671,"correct":26},{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":458,"analysis":37},910483,"有效控制建设工程造价的技术措施包括（ ）。",[686,688,690,692,694],{"key":20,"text":687,"correct":26},"重视工程设计多方案的选择",{"key":24,"text":689,"correct":22},"明确工程造价管理职能分工",{"key":28,"text":691,"correct":26},"严格审查施工组织设计",{"key":31,"text":693,"correct":22},"严格审核各项费用支出",{"key":34,"text":695,"correct":26},"严格审查施工图设计",[697,701,704,707,710,713],{"id":698,"name":699,"category":7,"favorite":700},1,"领导干部任职前廉政法规知识测试题",92,{"id":702,"name":703,"category":7,"favorite":698},595,"建筑结构与设备",{"id":705,"name":706,"category":7,"favorite":698},715,"招标采购专业知识与法律法规",{"id":708,"name":709,"category":7,"favorite":698},848,"市政方向-通用基础",{"id":711,"name":712,"category":7,"favorite":8},534,"BIM工程师",{"id":714,"name":712,"category":7,"favorite":8},535]