[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-46":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,46,50,2821,[13,38,53,68,83,98,113,128,142,157,172,187,201,216,231,245,260,273,287,302,316,330,344,359,371,386,401,415,428,443,457,471,485,499,513,527,542,556,570,585,599,613,625,639,653,667,681,695,709,723],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},910361,2,"多选题","(2018年)工程项目多方案比选的内容有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","选址方案",true,{"key":24,"text":25,"correct":22},"B","规模方案",{"key":27,"text":28,"correct":22},"C","污染防治措施方案",{"key":30,"text":31,"correct":32},"D","投产后经营方案",false,{"key":34,"text":35,"correct":22},"E","工艺方案","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},910362,"（2019年）施工合同有多种类型，下列工程中不宜采用总价合同的有( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"没有施工图纸的灾后紧急恢复工程",{"key":24,"text":45,"correct":22},"设计深度不够，工程量清单不够明确的工程",{"key":27,"text":47,"correct":32},"已完成施工图审查的单体住宅工程",{"key":30,"text":49,"correct":32},"工程内容单一，施工图设计已完成的路面铺装工程",{"key":34,"text":51,"correct":22},"采用较多新技术、新工艺的工程","ABE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},910363,"（2019年）投资方案现金流量表中，经营成本的组成项有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":32},"折旧费",{"key":24,"text":60,"correct":32},"摊销费",{"key":27,"text":62,"correct":22},"修理费",{"key":30,"text":64,"correct":32},"利息支出",{"key":34,"text":66,"correct":22},"外购原材科、燃料及动力费","CE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},910364,"（2020年真题）工程项目经济评价应遵循的基本原则有（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":32},"以财务效率为主",{"key":24,"text":75,"correct":22},"效益与费用计算口径对应一致",{"key":27,"text":77,"correct":22},"收益与风险权衡",{"key":30,"text":79,"correct":22},"以定量分析为主",{"key":34,"text":81,"correct":32},"租金包括租赁设备的成本、利息及手续费","BCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},910365,"(2016年)施工图预算的审查内容有()。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"工程量计算的准确性",{"key":24,"text":90,"correct":22},"定额的准确性",{"key":27,"text":92,"correct":32},"施工图纸的准确性",{"key":30,"text":94,"correct":22},"材料价格确定的合理性",{"key":34,"text":96,"correct":22},"相关费用确定的准确性","ABDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},910366,"(2018年)关于建设工程限额设计的说去。正确的有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":32},"限额设计应遵循全寿命期费用最低原则",{"key":24,"text":105,"correct":22},"限额设计的重要依据是批准的投资总额",{"key":27,"text":107,"correct":22},"限额设计时工程使用功能不能减少",{"key":30,"text":109,"correct":22},"限额设计应追求技术经济合理的最佳整体目标",{"key":34,"text":111,"correct":22},"限额设计可分为限额初步设计和限额施工图设计","BCDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},910367,"（2020年真题）采用单指标法评价设计方案时，可采用的评价方法有（）",[117,119,121,123,125],{"key":20,"text":118,"correct":32},"重点抽查法",{"key":24,"text":120,"correct":22},"综合费用法",{"key":27,"text":122,"correct":22},"价值工程法",{"key":30,"text":124,"correct":32},"分类整理法",{"key":34,"text":126,"correct":22},"全寿命期费用法","BCE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":82,"analysis":37},910368,"(2014年)根据《建设项目工程总承包合同（示范文本）》，在合同专用条款中应约定预付款的（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":32},"抵扣保证",{"key":24,"text":135,"correct":22},"抵扣方式",{"key":27,"text":137,"correct":22},"抵扣比例",{"key":30,"text":139,"correct":22},"抵扣时间安排",{"key":34,"text":141,"correct":32},"抵扣币种",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},910369,"(2015年)根据《标准施工招标文件》中的合同条款，签约合同价包含的内容有( )。",[146,148,150,152,154],{"key":20,"text":147,"correct":32},"变更价款",{"key":24,"text":149,"correct":22},"暂列金额",{"key":27,"text":151,"correct":32},"索赔费用",{"key":30,"text":153,"correct":32},"结算价款",{"key":34,"text":155,"correct":22},"暂估价","BE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},910370,"(2016年)关于施工标段划分的说法，正确的有()。",[161,163,165,167,169],{"key":20,"text":162,"correct":32},"标段划分多，业主协调工作量小",{"key":24,"text":164,"correct":32},"承包单位管理能力强，标段划分宜多",{"key":27,"text":166,"correct":22},"业主管理能力有限，标段划分宜少",{"key":30,"text":168,"correct":22},"标段划分少，会减少投标者数量",{"key":34,"text":170,"correct":32},"标段划分多，有利于施工现场布置","CD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},910371,"(2016年)根据《建设项目工程总承包合同（示范文本）》，对于经协商或调解确定的发包人应得的索赔款项，发包人可能的获得方式有()。",[176,178,180,182,184],{"key":20,"text":177,"correct":32},"从预付款保函中抵扣",{"key":24,"text":179,"correct":22},"从履约保函中抵扣",{"key":27,"text":181,"correct":32},"从支付保函中抵扣",{"key":30,"text":183,"correct":22},"从当月工程进度款中抵扣",{"key":34,"text":185,"correct":22},"按支付协议支付","BDE",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":82,"analysis":37},910372,"(2015年)根据FIDIC《施工合同条件》的规定，关于争端裁决委员会(DA B)及其裁决的说法，正确的有()。",[191,193,195,197,199],{"key":20,"text":192,"correct":32},"DAB须由3人组成",{"key":24,"text":194,"correct":22},"合同双方共同确定DAB主席",{"key":27,"text":196,"correct":22},"DAB成员的酬金由合同双方各支付一半",{"key":30,"text":198,"correct":22},"合同当事人有权不接受DAB的裁决",{"key":34,"text":200,"correct":32},"合同双方对DAB的约定排除了合同仲裁的可能性",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":215,"analysis":37},910373,"(2013年)下列工程项目中，不宜采用固定总价合同的有（）。",[205,207,209,211,213],{"key":20,"text":206,"correct":22},"建设规模大且技术复杂的工程项目",{"key":24,"text":208,"correct":32},"施工图纸和工程量清单详细而明确的项目",{"key":27,"text":210,"correct":22},"施工中有较大部分采用新技术，且施工单位缺乏经验的项目",{"key":30,"text":212,"correct":22},"施工工期紧的紧急工程项目",{"key":34,"text":214,"correct":32},"承包风险不大，各项费用易于准确估算的项目","ACD",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":230,"analysis":37},910374,"(2018年)根据FIDIC《土木工程施工合同条件》关于争端裁决委员会（DA B）及其解决争端的说法，正确的有（ ）。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"DAB 由1 人或3 人组成",{"key":24,"text":223,"correct":32},"DAB 在收到书面报告后84 天内裁决争端且不需说明理由。",{"key":27,"text":225,"correct":32},"合同一方对DAB 裁决不满时，应在收到裁决后14 天内发出表示不满的通知",{"key":30,"text":227,"correct":22},"合同双方在未通过友好协商或仲裁改变DAB 裁决之前应当执行DAB 载决",{"key":34,"text":229,"correct":22},"合同双方没有发出表示不满DAB 裁决的通知的，DAB 裁决对双方有约束力","ADE",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":171,"analysis":37},910375,"（2020年真题）按索赔目的不同，工程索赔可分为（）。",[235,237,239,241,243],{"key":20,"text":236,"correct":32},"合同时明示的索赔",{"key":24,"text":238,"correct":32},"合同中默示的索赔",{"key":27,"text":240,"correct":22},"工期索赔",{"key":30,"text":242,"correct":22},"费用索赔",{"key":34,"text":244,"correct":32},"工程变更索赔",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":259,"analysis":37},910376,"(2009年)工程项目施工过程中的综合成本分析包括()",[249,251,253,255,257],{"key":20,"text":250,"correct":32},"检验批施工成本分析",{"key":24,"text":252,"correct":22},"分部分项工程成本分析",{"key":27,"text":254,"correct":32},"单位工程施工成本分析",{"key":30,"text":256,"correct":22},"月（季）度施工成本分析",{"key":34,"text":258,"correct":32},"建设项目决算成本分析","BD",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":127,"analysis":37},910377,"(2013年)施工承包单位内部审查工程竣工结算的主要内容有()。",[264,266,267,269,271],{"key":20,"text":265,"correct":32},"工程竣工结算的完备性",{"key":24,"text":88,"correct":22},{"key":27,"text":268,"correct":22},"取费标准执行的严格性",{"key":30,"text":270,"correct":32},"工程结算资料递交程序的合法性",{"key":34,"text":272,"correct":22},"取费依据的时效性",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":259,"analysis":37},910378,"(2012年)分部分项工程成本分析中，“三算对比”主要是进行()的对比。",[277,279,281,283,285],{"key":20,"text":278,"correct":32},"实际成本与投资估算",{"key":24,"text":280,"correct":22},"实际成本与预算成本",{"key":27,"text":282,"correct":32},"实际成本与竣工决算",{"key":30,"text":284,"correct":22},"实际成本与目标成本",{"key":34,"text":286,"correct":32},"施工预算与设计概算",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},910379,"(2011年)施工合同签订后，工程项目施工成本计划的常用编制方法有()。",[291,293,295,297,299],{"key":20,"text":292,"correct":32},"专家意见法",{"key":24,"text":294,"correct":32},"功能指数法",{"key":27,"text":296,"correct":22},"目标利润法",{"key":30,"text":298,"correct":22},"技术进步法",{"key":34,"text":300,"correct":22},"定率估算法","CDE",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":171,"analysis":37},910380,"(2014年)按工程项目组成编制施工阶段资金使用计划时，建筑安装工程费中可直接分解到各个工程分项的费用有（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":32},"企业管理费",{"key":24,"text":309,"correct":32},"临时设施费",{"key":27,"text":311,"correct":22},"材料费",{"key":30,"text":313,"correct":22},"施工机具使用费",{"key":34,"text":315,"correct":32},"职工养老保险费",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":301,"analysis":37},910381,"(2016年)施工成本管理中，企业对项目经理部可控责任成本进行考核的指标有()。",[320,322,324,326,328],{"key":20,"text":321,"correct":32},"直接成本降低率",{"key":24,"text":323,"correct":32},"预算总成本降低率",{"key":27,"text":325,"correct":22},"责任目标总成本降低率",{"key":30,"text":327,"correct":22},"施工责任目标成本实际降低率",{"key":34,"text":329,"correct":22},"施工计划成本实际降低率",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":156,"analysis":37},910382,"(2013年)某工程施工至某月底，经偏差分析得到费用偏差(CV)＜0，进度偏差(SV)＜0，则表明()。",[334,336,338,340,342],{"key":20,"text":335,"correct":32},"已完工程实际费用节约",{"key":24,"text":337,"correct":22},"已完工程实际费用＞已完工程计划费用",{"key":27,"text":339,"correct":32},"拟完工程计划费用＞已完工程实际费用",{"key":30,"text":341,"correct":32},"已完工程实际进度超前",{"key":34,"text":343,"correct":22},"拟完工程计划费用＞已完工程计划费用",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":358,"analysis":37},910383,"(2014年)进行施工成本对比分析时，可采用的对比方式有（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"本期实际值与目标值对比",{"key":24,"text":351,"correct":32},"本期实际值与上期目标值对比",{"key":27,"text":353,"correct":22},"本期实际值与上期实际值对比",{"key":30,"text":355,"correct":32},"本期目标值与上期实际值对比",{"key":34,"text":357,"correct":22},"本期实际值与行业先进水平对比","ACE",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":259,"analysis":37},910384,"(2015年)按工程项目组成编制施工阶段资金使用计划时，不能分解到各个工程分项的费用有( )。",[363,365,367,369,370],{"key":20,"text":364,"correct":32},"人工费",{"key":24,"text":366,"correct":22},"保险费",{"key":27,"text":368,"correct":32},"二次搬运费",{"key":30,"text":309,"correct":22},{"key":34,"text":313,"correct":32},{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":385,"analysis":37},910385,"(2013年)关于分部分项工程成本分析资料来源的说法，正确的有()。",[375,377,379,381,383],{"key":20,"text":376,"correct":22},"预算成本以施工图和定额为依据确定",{"key":24,"text":378,"correct":32},"预算成本的各种信息是成本核算的依据",{"key":27,"text":380,"correct":32},"计划成本通过目标成本与预算成本的比较来确定",{"key":30,"text":382,"correct":32},"实际成本来自实际工程量、实耗人工和实耗材料",{"key":34,"text":384,"correct":22},"目标成本是分解到分部分项工程上的计划成本","AE",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},910386,"(2018年)根据《标准施工招标文件》工程变更的情形有（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"改变合同中某项工作的质量",{"key":24,"text":393,"correct":22},"改变合同工程原定的位置",{"key":27,"text":395,"correct":22},"改变合同中已批准的施工顺序",{"key":30,"text":397,"correct":22},"为完成工程需要追加的额外工作",{"key":34,"text":399,"correct":32},"取消某项工作改由建设单位自行完成","ABCD",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":156,"analysis":37},910387,"（2019年）某工程开工至第三个月末累计已完工程计划费用1200万元，已完工程实际费用1500万元，拟完工程计划费用1300万元，此时进行偏差分析可得到的正确结论有（ ）",[405,407,409,411,413],{"key":20,"text":406,"correct":32},"进度提前300万元",{"key":24,"text":408,"correct":22},"进度拖后100万元",{"key":27,"text":410,"correct":32},"费用节约100万",{"key":30,"text":412,"correct":32},"工程节约300万元",{"key":34,"text":414,"correct":22},"费用超过300万元",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":301,"analysis":37},910388,"（2019年）施工成本分析的基本方法有（ ）",[419,421,422,424,426],{"key":20,"text":420,"correct":32},"经验判断法",{"key":24,"text":292,"correct":32},{"key":27,"text":423,"correct":22},"比较法",{"key":30,"text":425,"correct":22},"因素分析法",{"key":34,"text":427,"correct":22},"比率法",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":442,"analysis":37},910390,"根据《注册造价师管理办法》，注册造价工程师的权利有（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"发起设立工程造价咨询企业",{"key":24,"text":435,"correct":22},"保管和使用本人的注册证书",{"key":27,"text":437,"correct":32},"执行工程计价标准和方法",{"key":30,"text":439,"correct":22},"参加注册造价师继续教育",{"key":34,"text":441,"correct":32},"保守执业中知悉的商业秘密","ABD",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":400,"analysis":37},910391,"根据现行规定，造价工程师执业范围包括（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"工程结算和竣工决算的审核",{"key":24,"text":450,"correct":22},"项目经济评价",{"key":27,"text":452,"correct":22},"工程投标报价的编制",{"key":30,"text":454,"correct":22},"建设项目建议书的编制和审核",{"key":34,"text":456,"correct":32},"工程投资估算的审批",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":67,"analysis":37},910393,"根据《工程造价咨询企业管理办法》，乙级工程造价咨询企业资质标准包括（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":32},"企业注册资本不少于人民币30 万元",{"key":24,"text":464,"correct":32},"专职从事工程造价专业工作的人员不少于12 人",{"key":27,"text":466,"correct":22},"企业人均办公建筑面积不少于10 平方米",{"key":30,"text":468,"correct":32},"近3 年工程造价咨询营业收入累计不低于人民币50 万元",{"key":34,"text":470,"correct":22},"企业专职从事工程造价专业工作的人员中注册造价工程师不少于6 人",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":230,"analysis":37},910394,"下列费用中，属于建设工程静态投资的是（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"基本预备费",{"key":24,"text":478,"correct":32},"涨价预备费",{"key":27,"text":480,"correct":32},"建设期贷款利息",{"key":30,"text":482,"correct":22},"建筑安装工程费",{"key":34,"text":484,"correct":22},"设备工器具购置费",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":52,"analysis":37},910396,"根据《工程造价咨询企业管理办法》，工程造价咨询企业设立的分支机构不得以自己名字进行的工作有（ ）。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"承接工程造价咨询业务",{"key":24,"text":492,"correct":22},"订立工程造价咨询合同",{"key":27,"text":494,"correct":32},"委托工程造价咨询项目负责人",{"key":30,"text":496,"correct":32},"组建工程造价咨询项目管理机构",{"key":34,"text":498,"correct":22},"出具工程造价成果文件",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":358,"analysis":37},910398,"为了有效地控制建设工程造价，造价工程师可采取的技术措施包括（ ）。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"重视工程设计多方案的选择",{"key":24,"text":506,"correct":32},"明确工程造价管理职能分工",{"key":27,"text":508,"correct":22},"严格审查施工组织设计",{"key":30,"text":510,"correct":32},"严格审查各项费用支出",{"key":34,"text":512,"correct":22},"严格审查施工图设计",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":400,"analysis":37},910401,"根据《建筑法》的规定，申请领取施工许可证，应具备的条件包括（ ）。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"已办理工程用地批准手续",{"key":24,"text":520,"correct":22},"已确定建筑施工企业",{"key":27,"text":522,"correct":22},"需要拆迁的，其拆迁进度符合施工要求",{"key":30,"text":524,"correct":22},"有满足施工需要的施工图纸及技术资料",{"key":34,"text":526,"correct":32},"建设资金已经到位",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":541,"analysis":37},910402,"根据《建筑法》，关于建筑工程承包的说法，正确的有（ ）。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"承包单位应在其资质等级许可的业务范围内承揽工程",{"key":24,"text":534,"correct":22},"大型建筑工程可由两个以上的承包单位联合共同承包",{"key":27,"text":536,"correct":22},"除总承包合同约定的分包外，工程分包须经建设单位认可",{"key":30,"text":538,"correct":32},"总承包单位就分包工程对建设单位不承担责任",{"key":34,"text":540,"correct":32},"分包单位可将其分包的工程再分包","ABC",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":97,"analysis":37},910403,"根据《建设工程质量管理条例》的规定，建设工程竣工验收应当具备的条件包括（ ）。",[546,548,550,552,554],{"key":20,"text":547,"correct":22},"有施工单位签署的工程保修书",{"key":24,"text":549,"correct":22},"有完整的技术档案和施工管理资料",{"key":27,"text":551,"correct":32},"建设单位和施工企业已签署工程结算文件",{"key":30,"text":553,"correct":22},"完成建设工程设计和合同约定的各项内容",{"key":34,"text":555,"correct":22},"有勘察、设计、施工单位分别签署的质量合格文件",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":67,"analysis":37},910405,"根据《合同法》，可变更或可撤销合同是指（ ）的和合同。",[560,562,564,566,568],{"key":20,"text":561,"correct":32},"恶意串通损害国家利益",{"key":24,"text":563,"correct":32},"恶意串通损害集体利益",{"key":27,"text":565,"correct":22},"因重大误解订立",{"key":30,"text":567,"correct":32},"限制民事行为能力人订立的合同",{"key":34,"text":569,"correct":22},"订立合同时显示公平",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":584,"analysis":37},910406,"根据我国《合同法》，下列关于要约和承诺的说明，正确的有（ ）。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"合同的订立，必须要经过要约和承诺两个阶段",{"key":24,"text":577,"correct":32},"要约达到受要约人时生效，承诺通知发出时生效",{"key":27,"text":579,"correct":32},"要约可以不具备合同的主要条款",{"key":30,"text":581,"correct":22},"要约可以撤回，也可以撤销",{"key":34,"text":583,"correct":32},"承诺通知一经发出不得撤回","AD",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":230,"analysis":37},910407,"根据《合同法》，下列各类合同中，属于无效合同的有（ ）。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"恶意串通损害第三人利益的合同",{"key":24,"text":592,"correct":32},"一方以欺诈手段订立的合同",{"key":27,"text":594,"correct":32},"一方乘人之危订立的合同",{"key":30,"text":596,"correct":22},"损害社会公共利益的合同",{"key":34,"text":598,"correct":22},"以合法形式掩盖非法目的的合同",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":442,"analysis":37},910408,"根据《关于实行建设项目法人责任制的暂行规定》，项目董事会的职权之一是（ ）。",[603,605,607,609,611],{"key":20,"text":604,"correct":22},"提出项目开工报告",{"key":24,"text":606,"correct":22},"审核项目初步设计和概算文件",{"key":27,"text":608,"correct":32},"组织工程招标工作",{"key":30,"text":610,"correct":22},"上报年度投资计划",{"key":34,"text":612,"correct":32},"编制和确定招标方案",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":82,"analysis":37},910409,"对于实行项目法人责任制的项目，属于项目总经理职权的是（ ）",[617,619,620,622,624],{"key":20,"text":618,"correct":32},"审核项目概算文件",{"key":24,"text":608,"correct":22},{"key":27,"text":621,"correct":22},"编制项目财务决算",{"key":30,"text":623,"correct":22},"拟定生产经营计划",{"key":34,"text":604,"correct":32},{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":97,"analysis":37},910412,"建设工程总分包模式的特点有（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":22},"总承包商的责任重，获利潜力大",{"key":24,"text":632,"correct":22},"业主合同结构简单，组织协调工作量小",{"key":27,"text":634,"correct":32},"业主选择总承包商的范围大，合同总价较低",{"key":30,"text":636,"correct":22},"总包合同价格可以较早确定，业主的风险小",{"key":34,"text":638,"correct":22},"承包商内部增加了控制环节，有利于控制工程质量",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":186,"analysis":37},910413,"下列关于总分包模式特点的说明，正确的是（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":32},"不利于控制工程造价",{"key":24,"text":646,"correct":22},"有利于缩短建设工期",{"key":27,"text":648,"correct":32},"不利于业主方的合同管理",{"key":30,"text":650,"correct":22},"有利于控制工程质量",{"key":34,"text":652,"correct":22},"对总承包商而言风险较大",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":358,"analysis":37},910415,"下列关于CM 承包模式的说法，正确的有（ ）。",[657,659,661,663,665],{"key":20,"text":658,"correct":22},"CM 承包模式下采用快速路径法施工",{"key":24,"text":660,"correct":32},"CM 单位直接与分包单位签订分包合同",{"key":27,"text":662,"correct":22},"CM 合同采用成本加酬金的计价方式",{"key":30,"text":664,"correct":32},"CM 单位与分包单位之间的合同价是保密的",{"key":34,"text":666,"correct":22},"CM 单位不赚取总包与分包之间的差价",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":186,"analysis":37},910417,"在组织建设工程流水施工时，等步距异节奏流水施工的特点包括（ ）。",[671,673,675,677,679],{"key":20,"text":672,"correct":32},"同一施工过程中各施工段的流水节拍不尽相等",{"key":24,"text":674,"correct":22},"相邻专业工作队之间的流水步距全部相等",{"key":27,"text":676,"correct":32},"所有施工过程所有施工段的流水节拍全部相等",{"key":30,"text":678,"correct":22},"专业工作队数大于施工过程数，从而使流水施工工期缩短",{"key":34,"text":680,"correct":22},"各专业工作队在施工段上能够连续作业",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":230,"analysis":37},910418,"某工作双代号网络计划如下图所示，存在的绘图错误有（ ）。",[685,687,689,691,693],{"key":20,"text":686,"correct":22},"多个起点节点",{"key":24,"text":688,"correct":32},"多个终点节点",{"key":27,"text":690,"correct":32},"存在循环回路",{"key":30,"text":692,"correct":22},"节点编号有误",{"key":34,"text":694,"correct":22},"有多余虚工作",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":358,"analysis":37},910419,"关于利率高低影响因素的说法，正确的有（ ）。",[699,701,703,705,707],{"key":20,"text":700,"correct":22},"通常情况下，利率的最高界限是社会平均利润率",{"key":24,"text":702,"correct":32},"借出资本所承担的风险越大，利率越低",{"key":27,"text":704,"correct":22},"资本借出期间的不可预见因素越多，利率越高",{"key":30,"text":706,"correct":32},"社会平均利润率不变的情况下，借贷资本供过于求会导致利率上升",{"key":34,"text":708,"correct":22},"借出资本期限越长，利率越高",{"id":710,"libraryId":5,"type":15,"typeLabel":16,"stem":711,"options":712,"answer":541,"analysis":37},910420,"关于现金流量绘图规则的说法，正确的有（ ）。",[713,715,717,719,721],{"key":20,"text":714,"correct":22},"箭线长短要能适当体现各时点现金流量数值大小的差异",{"key":24,"text":716,"correct":22},"箭线与时间轴的交点表示现金流量发生的时点",{"key":27,"text":718,"correct":22},"横轴是时间轴，向右延伸表示时间的延续",{"key":30,"text":720,"correct":32},"现金流量的性质对不同的人而言是相同的",{"key":34,"text":722,"correct":32},"时间轴上的点通常表示该时间单位的起始时点",{"id":724,"libraryId":5,"type":15,"typeLabel":16,"stem":725,"options":726,"answer":737,"analysis":37},910421,"下列关于资金时间价值和利率的说明，正确的是（ ）。",[727,729,731,733,735],{"key":20,"text":728,"correct":32},"利率要大于或等于社会平均利润率",{"key":24,"text":730,"correct":32},"在平均利润率不变的情况下，借贷资本供不应求时，利率便下降",{"key":27,"text":732,"correct":32},"利率是衡量资金时间价值的绝对尺度",{"key":30,"text":734,"correct":22},"利息可以看作资金的一种机会成本",{"key":34,"text":736,"correct":22},"风险越大，利率就越高","DE",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]