[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-44":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":722},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,44,50,2821,[13,38,53,68,82,96,111,126,141,155,170,185,199,214,229,243,257,271,285,296,310,323,338,353,366,376,391,405,419,434,448,462,476,491,505,519,533,547,559,570,581,595,609,623,637,652,666,681,695,709],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},910257,2,"多选题","(2014年)根据《房屋建筑和市政基础设施工程施工图设计文件审查管理办法》，施工图审查机构对施工图设计文件审查的内容有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","是否按限额设计标准进行施工图设计",false,{"key":24,"text":25,"correct":26},"B","是否符合工程建设强制性标准",true,{"key":28,"text":29,"correct":22},"C","施工图预算是否超过批准的工程概算",{"key":31,"text":32,"correct":26},"D","地基基础和主体结构的安全性",{"key":34,"text":35,"correct":22},"E","危险性较大的工程是否有专项施工方案","BD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},910258,"(2016年)建设单位在办理工程质量监督注册手续时需提供的资料有()。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"中标通知书",{"key":24,"text":45,"correct":22},"施工进度计划",{"key":28,"text":47,"correct":22},"施工方案",{"key":31,"text":49,"correct":26},"施工组织设计",{"key":34,"text":51,"correct":26},"监理规划","ADE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},910259,"(2013年)根据《关于实行建设项目法人责任制的暂行规定》，建设项目总经理的职权有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"组织审核初步设计文件",{"key":24,"text":60,"correct":26},"组织工程设计招标",{"key":28,"text":62,"correct":22},"审批项目财务预算",{"key":31,"text":64,"correct":26},"组织单项工程预验收",{"key":34,"text":66,"correct":26},"编制项目财务决算","BDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},910260,"关于工程项目后评价的说法，正确的有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"项目后评价应在竣工验收阶段进行",{"key":24,"text":75,"correct":26},"项目后评价的基本方法是对比法",{"key":28,"text":77,"correct":22},"项目效益后评价主要是经济效益后评价",{"key":31,"text":79,"correct":26},"过程后评价是项目后评价的重要内容",{"key":34,"text":81,"correct":22},"项目后评价全部采用实际运营数据",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":52,"analysis":37},910261,"(2018年)工程项目决策阶段编制的项目建议书应包括的内容有（ ）",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"环境影响的初步评价",{"key":24,"text":89,"correct":22},"社会评价和风险分析",{"key":28,"text":91,"correct":22},"主要原材料供应方案",{"key":31,"text":93,"correct":26},"资金筹措方案设想",{"key":34,"text":95,"correct":26},"项目进度安排",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},910263,"(2013年)关于强矩阵制组织形式的说法，正确的有()。",[100,102,104,106,108],{"key":20,"text":101,"correct":26},"项目经理具有较大权限",{"key":24,"text":103,"correct":22},"需要配备训练有素的协调人员",{"key":28,"text":105,"correct":26},"项目组织成员绩效完全由项目经理考核",{"key":31,"text":107,"correct":26},"适用于技术复杂且对时间紧迫的项目",{"key":34,"text":109,"correct":26},"项目经理直接向最高领导负责","ACDE",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},910264,"(2010年)建设工程建设与施工采用总分包模式的特点有()。",[115,117,119,121,123],{"key":20,"text":116,"correct":26},"对总承包商要求高，业主选择范围小",{"key":24,"text":118,"correct":22},"总承包合同价格可较早确定，合同金额较低",{"key":28,"text":120,"correct":26},"业主的合同结构简单，组织协调工作量小",{"key":31,"text":122,"correct":26},"工程设计与施工有机融合，有利于缩短建设工期",{"key":34,"text":124,"correct":22},"分包单位多，弱化了工程质量控制工作","ACD",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},910265,"(2015年)建设工程采用平行承包模式时，建设单位控制工程造价难度大的原因有( )。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"合同价值小，建设单位选择承包单位的范围小",{"key":24,"text":133,"correct":22},"合同数量少，组织协调工作量小",{"key":28,"text":135,"correct":26},"总合同价不易在短期内确定，影响造价控制的实施",{"key":31,"text":137,"correct":22},"建设周期长，增加时间成本",{"key":34,"text":139,"correct":26},"工程招标任务量大，需控制多项合同价格","CE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":52,"analysis":37},910266,"(2009年)对业主而言，建设工程采用平行承包模式的特点有()。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"选择承包商的范围大",{"key":24,"text":148,"correct":22},"组织协调工作量小",{"key":28,"text":150,"correct":22},"合同结构简单",{"key":31,"text":152,"correct":26},"工程招标任务量大",{"key":34,"text":154,"correct":26},"工程造价控制难度大",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},910267,"(2014年)下列关于CM承包模式的说法，正确的有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"CM承包模式下采用快速路径法施工",{"key":24,"text":162,"correct":22},"CM单位直接与分包单位签订分包合同",{"key":28,"text":164,"correct":26},"CM合同采用成本加酬金的计价方式",{"key":31,"text":166,"correct":22},"CM单位与分包单位之间的合同价是保密的",{"key":34,"text":168,"correct":26},"CM单位不赚取总包与分包之间的差价","ACE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},910268,"(2012年)建设工程总分包模式的特点有()。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"总承包商的责任重，获利潜力大",{"key":24,"text":177,"correct":26},"业主合同结构简单，组织协调工作量小",{"key":28,"text":179,"correct":22},"业主选择总承包商的范围大，合同总价较低",{"key":31,"text":181,"correct":26},"总包合同价格可以较早确定，业主的风险小",{"key":34,"text":183,"correct":26},"承包商内部增加了控制环节，有利于控制工程质量","ABDE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":198,"analysis":37},910269,"(2011年)建设工程施工联合体承包模式的特点有()。",[189,190,192,194,196],{"key":20,"text":120,"correct":26},{"key":24,"text":191,"correct":22},"通过联合体内部合同约束，增加了工程质量监控环节",{"key":28,"text":193,"correct":22},"施工合同总价可以较早确定，业主可承担较少风险",{"key":31,"text":195,"correct":22},"施工合同风险大，要求各承包商有较高的综合管理水平",{"key":34,"text":197,"correct":26},"能够集中联合体成员单位优势，增强抗风险能力","AE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},910270,"（2019年）项目管理采用矩阵制组织机构形式的特点有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"组织机构稳定性强",{"key":24,"text":206,"correct":22},"容易造成职责不清",{"key":28,"text":208,"correct":26},"组织机构灵活性大",{"key":31,"text":210,"correct":26},"组织机构机动性强",{"key":34,"text":212,"correct":26},"每一个成员受双重领导","CDE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},910272,"(2011年)下列建设工程项目目标控制方法中，可用来判断工程进度偏差的有()。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"直方图法",{"key":24,"text":221,"correct":26},"网络计划法",{"key":28,"text":223,"correct":26},"S曲线法",{"key":31,"text":225,"correct":26},"香蕉曲线法",{"key":34,"text":227,"correct":22},"控制图法","BCD",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":67,"analysis":37},910273,"(2010年)应用控制图法控制生产过程质量时，表明点子在控制界限内排列有缺陷的有()。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"点子连续在中心线一侧出现5个以上",{"key":24,"text":236,"correct":26},"连续7个以上的点子上升或下降",{"key":28,"text":238,"correct":22},"连续7个点中至少有5个点在同一侧",{"key":31,"text":240,"correct":26},"连续3个点落在两倍标准偏差与三倍标准偏差控制界限之间",{"key":34,"text":242,"correct":26},"点子出现周期性波动",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":67,"analysis":37},910274,"(2014年)建设单位编制的工程项目建设总进度计划包括的内容有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"竣工投产交付使用计划表",{"key":24,"text":250,"correct":26},"工程项目一览表",{"key":28,"text":252,"correct":22},"年度建设资金平衡表",{"key":31,"text":254,"correct":26},"工程项目进度平衡表",{"key":34,"text":256,"correct":26},"投资计划年度分配表",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":270,"analysis":37},910275,"(2016年)采用控制图法控制生产过程质量时，说明点子在控制界限内排列有缺陷的情形有()。",[261,263,264,266,268],{"key":20,"text":262,"correct":26},"点子连续在中心线一侧出现7个以上",{"key":24,"text":236,"correct":26},{"key":28,"text":265,"correct":22},"连续11个点子落在一倍标准偏差控制界限之外",{"key":31,"text":267,"correct":22},"点子落在两倍标准偏差控制界限之外",{"key":34,"text":269,"correct":22},"点子落在三倍标准偏差控制界限附近","AB",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":36,"analysis":37},910276,"(2012年)采用频数分布直方图分析工程质量波动情况时，如果出现孤岛型分布，说明()。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"数据分组不当",{"key":24,"text":278,"correct":26},"少量材料不合格",{"key":28,"text":280,"correct":22},"组距确定不当",{"key":31,"text":282,"correct":26},"短时间内工人操作不熟练",{"key":34,"text":284,"correct":22},"两个分布相混淆",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":228,"analysis":37},910277,"(2015年)下列项目目标控制方法中，可用于控制工程质量的有( )。",[289,290,291,293,294],{"key":20,"text":223,"correct":22},{"key":24,"text":227,"correct":26},{"key":28,"text":292,"correct":26},"排列图法",{"key":31,"text":219,"correct":26},{"key":34,"text":295,"correct":22},"横道图法",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":228,"analysis":37},910278,"(2016年)根据《建筑施工组织设计规范》，单位工程施工组织设计中的施工部署应包括()。",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"施工资源配置计划",{"key":24,"text":303,"correct":26},"施工进度安排和空间组织",{"key":28,"text":305,"correct":26},"施工重点和难点分析",{"key":31,"text":307,"correct":26},"工程项目管理组织机构",{"key":34,"text":309,"correct":22},"施工现场平面布置",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":322,"analysis":37},910279,"（2019年）下列工程项目目标控制方法中,可用来控制工程造价和工程进度的方法有（）。",[314,315,317,318,320],{"key":20,"text":225,"correct":26},{"key":24,"text":316,"correct":22},"目标管理法",{"key":28,"text":223,"correct":26},{"key":31,"text":319,"correct":22},"责任矩阵法",{"key":34,"text":321,"correct":22},"因果分析图法","AC",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":337,"analysis":37},910282,"(2015年)建设工程组织加快的成倍节拍流水施工的特点有( )。",[327,329,331,333,335],{"key":20,"text":328,"correct":26},"各专业工作队在施工段上能够连续作业",{"key":24,"text":330,"correct":26},"相邻施工过程的流水步距均相等",{"key":28,"text":332,"correct":26},"不同施工过程的流水节拍成倍数关系",{"key":31,"text":334,"correct":22},"施工段之间可能有空闲时间",{"key":34,"text":336,"correct":26},"专业工作队数大干施工过程数","ABCE",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":352,"analysis":37},910283,"(2016年)下列流水施工参数中，用来表达流水施工在空间布置上开展状态的参数有()。",[342,344,346,348,350],{"key":20,"text":343,"correct":22},"流水能力",{"key":24,"text":345,"correct":22},"施工过程",{"key":28,"text":347,"correct":22},"流水强度",{"key":31,"text":349,"correct":26},"工作面",{"key":34,"text":351,"correct":26},"施工段","DE",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":228,"analysis":37},910284,"(2013年)非节奏流水施工的特点有()。",[357,359,361,363,364],{"key":20,"text":358,"correct":22},"各施工段上的流水节拍均相等",{"key":24,"text":360,"correct":26},"相邻施工过程的流水步距不尽相等",{"key":28,"text":362,"correct":26},"专业工作队数等于施工过程数",{"key":31,"text":334,"correct":26},{"key":34,"text":365,"correct":22},"有的专业工作队不能连续作业",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":375,"analysis":37},910285,"(2014年)固定节拍流水施工的特点有（ ）。",[370,371,372,373,374],{"key":20,"text":358,"correct":26},{"key":24,"text":330,"correct":26},{"key":28,"text":362,"correct":26},{"key":31,"text":334,"correct":22},{"key":34,"text":365,"correct":22},"ABC",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":390,"analysis":37},910286,"（2019年）建设工程组织固定节拍流水施工的特点有（ ）。",[380,382,384,386,388],{"key":20,"text":381,"correct":22},"专业工作队数大于施工过程数",{"key":24,"text":383,"correct":26},"施工段之间没有空闲时间",{"key":28,"text":385,"correct":26},"相邻施工过程的流水步距相等",{"key":31,"text":387,"correct":26},"各施工段上的流水节拍相等",{"key":34,"text":389,"correct":26},"各专业工作队能够在各施工段上连续作业","BCDE",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":110,"analysis":37},910287,"(2009年)组织建设工程流水施工时，划分施工段的原则有()。",[395,397,399,401,403],{"key":20,"text":396,"correct":26},"同一专业工作队在各个施工段上的劳动量应大致相等",{"key":24,"text":398,"correct":22},"施工段的数量应尽可能多",{"key":28,"text":400,"correct":26},"每个施工段内要有足够的工作面",{"key":31,"text":402,"correct":26},"施工段的界限应尽可能与结构界限相吻合",{"key":34,"text":404,"correct":26},"多层建筑物应既分施工段又分施工层",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":36,"analysis":37},910288,"(2013年)工程网络计划中，关键工作是指()的工作。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"自由时差最小",{"key":24,"text":412,"correct":26},"总时差最小",{"key":28,"text":414,"correct":22},"时间间隔为零",{"key":31,"text":416,"correct":26},"最迟完成时间与最早完成时间的差值最小",{"key":34,"text":418,"correct":22},"开始接节点和完成点均为关键节点",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":433,"analysis":37},910289,"(2015年)某工程时标网络图如下图所示。计划执行到第5周检查实际进度。发现D工作需要3周完成，E工作需1周完成，F工作刚刚开始。由此可以判断出( )。",[423,425,427,429,431],{"key":20,"text":424,"correct":26},"C工作均已完成",{"key":24,"text":426,"correct":26},"D工程按计划进行",{"key":28,"text":428,"correct":22},"E工作提前1周",{"key":31,"text":430,"correct":22},"F工作进度不影响工期",{"key":34,"text":432,"correct":26},"总工期需要延长一周","ABE",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":52,"analysis":37},910290,"(2018年)某工作双代号网络计划如下图所示，存在的绘图错误有（ ）",[438,440,442,444,446],{"key":20,"text":439,"correct":26},"多个起点节点",{"key":24,"text":441,"correct":22},"多个终点节点",{"key":28,"text":443,"correct":22},"存在循环回路",{"key":31,"text":445,"correct":26},"节点编号有误",{"key":34,"text":447,"correct":26},"有多余虚工作",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":36,"analysis":37},910291,"(2018年)某工程网络计划执行到第8 周末检查进度情况见下表（单位：周） 从中可得到的正确结论有（ ）",[452,454,456,458,460],{"key":20,"text":453,"correct":22},"工作H 影响总工期1 周",{"key":24,"text":455,"correct":26},"工作K 提前一周",{"key":28,"text":457,"correct":22},"工作K 尚有总时差为零",{"key":31,"text":459,"correct":26},"工作M 按计划进行",{"key":34,"text":461,"correct":22},"工作H 尚有总时差1 周",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":337,"analysis":37},910292,"（2019年）工程网络计划优化是指( ) 的过程。",[466,468,470,472,474],{"key":20,"text":467,"correct":26},"寻求工程总成本最低时工期安排",{"key":24,"text":469,"correct":26},"使计算工期满足要求工期",{"key":28,"text":471,"correct":26},"按要求工期寻求最低成本",{"key":31,"text":473,"correct":22},"在工期保持不变的条件下使资源需用量最少",{"key":34,"text":475,"correct":26},"在满足资源限制条件下使工期延长最少",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":490,"analysis":37},910293,"(2018年)工程风险管理计划实施过程中的监控内容包括（ ）",[480,482,484,486,488],{"key":20,"text":481,"correct":22},"制定风险控制措施",{"key":24,"text":483,"correct":26},"评估风险控制措施产生的效果",{"key":28,"text":485,"correct":26},"跟踪和评估风险的变化程度",{"key":31,"text":487,"correct":22},"确定风险的可接受性",{"key":34,"text":489,"correct":26},"监控潜在风险的发展","BCE",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":67,"analysis":37},910294,"（2019年）根据九部委联合发布的《标准材料采购招标文件》和《标准设备采购招标文件》, 关于当事人义务的说法,正确的有( ) 。",[495,497,499,501,503],{"key":20,"text":496,"correct":22},"迟延交付违约金的总额不得超过合同价格的5%",{"key":24,"text":498,"correct":26},"支付迟延交货违约金不能免除交方继续交付合同材料的义务",{"key":28,"text":500,"correct":22},"采购合同订立时的卖方营业地为标的物交付地",{"key":31,"text":502,"correct":26},"卖方在交货时应将产品合格证随同产品交方据以验收",{"key":34,"text":504,"correct":26},"迟延付款违约金的总额不得超过合同价留的10%",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":433,"analysis":37},910295,"(2009年)在工程经济分析中，影响资金等值的因素有()。",[509,511,513,515,517],{"key":20,"text":510,"correct":26},"资金额度",{"key":24,"text":512,"correct":26},"资金发生的时间",{"key":28,"text":514,"correct":22},"资金支付方式",{"key":31,"text":516,"correct":22},"货币种类",{"key":34,"text":518,"correct":26},"利率的大小",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":52,"analysis":37},910296,"(2010年)下列评价方法中，属于互斥型投资方案经济效果动态评价方法的有()。",[523,525,527,529,531],{"key":20,"text":524,"correct":26},"增量投资内部收益率法",{"key":24,"text":526,"correct":22},"年折算费用法",{"key":28,"text":528,"correct":22},"增量投资回收期法",{"key":31,"text":530,"correct":26},"方案重复法",{"key":34,"text":532,"correct":26},"无限计算期法",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":213,"analysis":37},910297,"(2012年)某企业从银行借入一笔1年期的短期借款，年利率12%，按月复利计息，则关于该项借款利率的说法，正确的有()。",[537,539,541,543,545],{"key":20,"text":538,"correct":22},"利率为连续复利",{"key":24,"text":540,"correct":22},"年有效利率为12%",{"key":28,"text":542,"correct":26},"月有效利率为1%",{"key":31,"text":544,"correct":26},"月名义利率为1%",{"key":34,"text":546,"correct":26},"季有效利率大于3%",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":67,"analysis":37},910298,"(2013年)对于计算期相同的互斥方案，可采用的经济效果动态评价方法有()。",[551,553,555,556,558],{"key":20,"text":552,"correct":22},"增量投资收益率法",{"key":24,"text":554,"correct":26},"净现值法",{"key":28,"text":528,"correct":22},{"key":31,"text":557,"correct":26},"净年值法",{"key":34,"text":524,"correct":26},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":125,"analysis":37},910299,"(2014年)下列评价方法中，属于互斥投资方案静态评价方法的（ ）。",[563,564,566,567,569],{"key":20,"text":526,"correct":26},{"key":24,"text":565,"correct":22},"净现值率法",{"key":28,"text":528,"correct":26},{"key":31,"text":568,"correct":26},"增量投资收益率发",{"key":34,"text":524,"correct":22},{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":390,"analysis":37},910300,"(2012年)互斥型投资方案经济效果评价可采用的静态分析方法有()。",[574,576,577,578,580],{"key":20,"text":575,"correct":22},"最小公倍数法",{"key":24,"text":552,"correct":26},{"key":28,"text":528,"correct":26},{"key":31,"text":579,"correct":26},"综合总费用法",{"key":34,"text":526,"correct":26},{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":169,"analysis":37},910301,"(2011年)关于现金流量图绘制规则的说法，正确的有()。",[585,587,589,591,593],{"key":20,"text":586,"correct":26},"横轴为时间轴，整个横轴表示经济系统寿命期",{"key":24,"text":588,"correct":22},"横轴的起点表示时间序列第一期期末",{"key":28,"text":590,"correct":26},"横轴上每一间隔代表一个计息周期",{"key":31,"text":592,"correct":22},"与横轴相连的垂直箭线代表现金流量",{"key":34,"text":594,"correct":26},"垂直箭线的长短应体现各时点现金流量的大小",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":490,"analysis":37},910302,"（2019年）某人向银行申请住房按揭贷款50万元，期限10年,年利率为4．8% ,还款方式为按月等额本息还款，复利计息。关于该项贷款的说法,正确的有( ) 。",[599,601,603,605,607],{"key":20,"text":600,"correct":22},"宜采用偿债基金系数直接计算每月还款额",{"key":24,"text":602,"correct":26},"借款年名义利率为4．8%",{"key":28,"text":604,"correct":26},"借款的还款期数为120期",{"key":31,"text":606,"correct":22},"借款期累计支付利息比按月等额本金还款少",{"key":34,"text":608,"correct":26},"该项借款的月利率为0．4%",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":375,"analysis":37},910303,"（2020年真题）影响利率高低的主要因素有（）",[613,615,617,619,621],{"key":20,"text":614,"correct":26},"借贷资本供求情况",{"key":24,"text":616,"correct":26},"借贷风险",{"key":28,"text":618,"correct":26},"借贷期限",{"key":31,"text":620,"correct":22},"内部收益率",{"key":34,"text":622,"correct":22},"行业基准收益率",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":490,"analysis":37},910304,"(2009年)下列关于投资方案偿债能力指标的说法中，正确的有()。",[627,629,631,633,635],{"key":20,"text":628,"correct":22},"借款偿还期指标适用于给定借款偿还期的项目",{"key":24,"text":630,"correct":26},"利息备付率反映投资方案偿付债务利息的保障程度",{"key":28,"text":632,"correct":26},"偿债备付率反映可用于还本付息的资金保障程度",{"key":31,"text":634,"correct":22},"利息备付率和偿债备付率均应大于2",{"key":34,"text":636,"correct":26},"利息备付率和偿债备付率均应分年计算",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":651,"analysis":37},910305,"(2012年)下列评价指标中，可用于评价投资方案盈利能力的动态指标有()。",[641,643,645,647,649],{"key":20,"text":642,"correct":22},"净产值",{"key":24,"text":644,"correct":26},"净现值",{"key":28,"text":646,"correct":26},"净年值",{"key":31,"text":648,"correct":22},"投资收益率",{"key":34,"text":650,"correct":22},"偿债备付率","BC",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":169,"analysis":37},910306,"(2010年)下列关于投资方案经济效果评价指标的说法中正确的有()。",[656,658,660,662,664],{"key":20,"text":657,"correct":26},"投资收益率指标计算的主观随意性强",{"key":24,"text":659,"correct":22},"投资回收期从建设开始年算起",{"key":28,"text":661,"correct":26},"投资回收期指标不能反映投资回收之后的情况",{"key":31,"text":663,"correct":22},"利息备付率和偿债备付率应分月计算",{"key":34,"text":665,"correct":26},"净现值法与净年值法在方案评价中能得出相同结论",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":680,"analysis":37},910307,"(2010年)应用净现值指标评价投资方案经济效果的优越性有()。",[670,672,674,676,678],{"key":20,"text":671,"correct":22},"能够直观反映项目单位投资的使用效率",{"key":24,"text":673,"correct":26},"能够全面考虑项目在整个计算期内的经济状况",{"key":28,"text":675,"correct":22},"能够直接说明项目计算期各年的经营成果",{"key":31,"text":677,"correct":22},"能够全面反映项目投资过程的收益程度",{"key":34,"text":679,"correct":26},"能够直接以金额表示项目的盈利水平","BE",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":110,"analysis":37},910308,"(2010年)下列关于投资项目不确定分析的说法中，正确的有()。",[685,687,689,691,693],{"key":20,"text":686,"correct":26},"盈亏平衡分析只适用于项目的财务评价",{"key":24,"text":688,"correct":22},"敏感性分析只适用于项目的财务评价",{"key":28,"text":690,"correct":26},"风险分析可同时用于项目的财务评价和国民经济评价",{"key":31,"text":692,"correct":26},"盈亏平衡点反映了项目的抗风险能力",{"key":34,"text":694,"correct":26},"敏感性分析指标应与确定性经济指标一致",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":490,"analysis":37},910309,"(2014年)采用净现值和内部收益率指标评价投资方案经济效果的共同特点有（ ）。",[699,701,703,705,707],{"key":20,"text":700,"correct":22},"均受外部参数的影响",{"key":24,"text":702,"correct":26},"均考虑资金的时间和价值",{"key":28,"text":704,"correct":26},"均可对独立方案进行评价",{"key":31,"text":706,"correct":22},"均能反映投资回收过程的收益程度",{"key":34,"text":708,"correct":26},"均能全面考虑整个计算期内经济状况",{"id":710,"libraryId":5,"type":15,"typeLabel":16,"stem":711,"options":712,"answer":228,"analysis":37},910310,"(2013年)下列评价指标中，属于投资方案经济效果静态评价指标的有()。",[713,715,717,718,720],{"key":20,"text":714,"correct":22},"内部效益率",{"key":24,"text":716,"correct":26},"利息备付率",{"key":28,"text":648,"correct":26},{"key":31,"text":719,"correct":26},"资产负债率",{"key":34,"text":721,"correct":22},"净现值率",[723,727,730,733,736,739],{"id":724,"name":725,"category":7,"favorite":726},1,"领导干部任职前廉政法规知识测试题",92,{"id":728,"name":729,"category":7,"favorite":724},595,"建筑结构与设备",{"id":731,"name":732,"category":7,"favorite":724},715,"招标采购专业知识与法律法规",{"id":734,"name":735,"category":7,"favorite":724},848,"市政方向-通用基础",{"id":737,"name":738,"category":7,"favorite":8},534,"BIM工程师",{"id":740,"name":738,"category":7,"favorite":8},535]