[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-42":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,42,50,2821,[13,34,46,58,70,82,94,103,113,125,133,145,155,163,175,187,199,209,221,233,245,257,265,274,286,298,310,322,334,346,358,370,382,394,406,416,428,440,452,464,476,487,495,503,515,524,536,548,560,568],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},910151,1,"单选题","（2015年考题）根据《标准施工招标文件》，下列合同文件的内容不一致，或专业合同条款另有约定书，应以（）为准。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","投标函",false,{"key":24,"text":25,"correct":26},"B","中标通知书",true,{"key":28,"text":29,"correct":22},"C","专用合同条款",{"key":31,"text":32,"correct":22},"D","通用合同条款","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},910152,"（2015年考题）实际工程量与统计工程量可能有较大出入时，建设单位应采用的合同计价方式是（）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"单价合同",{"key":24,"text":41,"correct":22},"成本加固定酬金合同",{"key":28,"text":43,"correct":22},"总价合同",{"key":31,"text":45,"correct":22},"成本加浮动酬金合同",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},910153,"（2016年考题）根据《标准施工招标文件》，对于施工现场发掘的文物。发包人、监理人和承包人应按要求采取妥善保护措施，由此导致的费用增加应由（）承担。",[50,52,54,56],{"key":20,"text":51,"correct":22},"承包人",{"key":24,"text":53,"correct":26},"发包人",{"key":28,"text":55,"correct":22},"承包人和发包人",{"key":31,"text":57,"correct":22},"发包人和监理人",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},910154,"（2016年考题）招标人在施工招标文件中规定了暂定金额的分项内容和暂定总价款时，投标人可采用的报价策略是（）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"适当提高暂定金额分项内容的单价",{"key":24,"text":65,"correct":22},"适当减少暂定金额中的分项工程量",{"key":28,"text":67,"correct":22},"适当降低暂定金额分项内容的单价",{"key":31,"text":69,"correct":22},"适当增加暂定金额中的分项工程量",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},910155,"（2017年考题）根据《建设项目工程总承包合同（示范文本）》，发包人应在收到承包人按约定提交的最终竣工结算资料的（）天内，结清竣工结算款项。",[74,76,78,80],{"key":20,"text":75,"correct":22},"14",{"key":24,"text":77,"correct":22},"15",{"key":28,"text":79,"correct":22},"28",{"key":31,"text":81,"correct":26},"30",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},910156,"（2017年考题）关于《标准施工招标文件》中用合同条款的说法,正确的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"通用合同条款适用于设计和施工同属于一个承包商的施工招标",{"key":24,"text":89,"correct":26},"通用合同条款同时适用于单价合同和总价合同",{"key":28,"text":91,"correct":22},"通用合同条款只适用于单价合同",{"key":31,"text":93,"correct":22},"通用合同条款只适用于总价合同",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},910157,"（2018年考题）下列不同计价方式的合同中。施工承包单位风险大，建设单位容易运行造价控制的是（）。",[98,99,100,101],{"key":20,"text":39,"correct":22},{"key":24,"text":45,"correct":22},{"key":28,"text":43,"correct":26},{"key":31,"text":102,"correct":22},"成本加百分比酬金合同",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":28,"analysis":33},910158,"（2019年考题）根据《标准设计施工总承包招标文件》发包人最迟应当在监理人收到进度付款申请单的（）天内，将进度应付款支付给承包人。",[107,108,110,111],{"key":20,"text":75,"correct":22},{"key":24,"text":109,"correct":22},"21",{"key":28,"text":79,"correct":26},{"key":31,"text":112,"correct":22},"35",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":24,"analysis":33},910159,"（2019年考题）根据《标准施工招标文件》，合同价格的准确数据只有在（）后才能确定。",[117,119,121,123],{"key":20,"text":118,"correct":22},"后续工程不再发生工程变更",{"key":24,"text":120,"correct":26},"承包人完成缺陷责任期工作",{"key":28,"text":122,"correct":22},"工程审计全部完成",{"key":31,"text":124,"correct":22},"竣工结算价款已支付完成",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":28,"analysis":33},910160,"（2019年考题）下列不同计价方式的合同中，施工承包单位承担控制造价风险最小的合同是（）。",[129,130,131,132],{"key":20,"text":45,"correct":22},{"key":24,"text":39,"correct":22},{"key":28,"text":41,"correct":26},{"key":31,"text":43,"correct":22},{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":20,"analysis":33},910161,"（2015年考题）采用分组计算审查法审查施工图预算的特点是（）。",[137,139,141,143],{"key":20,"text":138,"correct":26},"可加快审查进度，但审查精度较差",{"key":24,"text":140,"correct":22},"审查质量高，但审查时间较长",{"key":28,"text":142,"correct":22},"应用范围广，但审查工作量大",{"key":31,"text":144,"correct":22},"审查效果好，但应用范围有局限性",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},910162,"（2015年考题）根据《建设项目工程总承包合同（示范文本）》，发包人经查收到承包人递交的每月付款申请报告之日起的（）以内审查并支付。",[149,150,152,153],{"key":20,"text":81,"correct":22},{"key":24,"text":151,"correct":26},"25",{"key":28,"text":77,"correct":22},{"key":31,"text":154,"correct":22},"10",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":31,"analysis":33},910163,"（2015年考题）下列合同计价方式中，建设单位最容易控制造价的是（）。",[159,160,161,162],{"key":20,"text":45,"correct":22},{"key":24,"text":39,"correct":22},{"key":28,"text":102,"correct":22},{"key":31,"text":43,"correct":26},{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":28,"analysis":33},910164,"（2017年考题）根据《标准施工招标文件》合同双方发生争议采用争议评审的,除专用合同条款另有约定外,争议评组应在（）内做出书面评审意见。",[167,169,171,173],{"key":20,"text":168,"correct":22},"收到争议评审申请请报告后28天",{"key":24,"text":170,"correct":22},"收到被申请人答辩报告后28天",{"key":28,"text":172,"correct":26},"争议调查会结束后14天",{"key":31,"text":174,"correct":22},"收到合同双方报告后14天",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},910165,"（2017年考题）根据FIDIC《土木工程施工合同条件》，给指定分包商的付款应从（）中开支。",[179,181,183,185],{"key":20,"text":180,"correct":26},"暂定金额",{"key":24,"text":182,"correct":22},"暂估价",{"key":28,"text":184,"correct":22},"分包管理费",{"key":31,"text":186,"correct":22},"应分摊费用",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":28,"analysis":33},910166,"（2017年考题）施工图预算审查方法中，审查速度快，但审查精度较差的是（）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"标准预算审查法",{"key":24,"text":194,"correct":22},"对比审查法",{"key":28,"text":196,"correct":26},"分组计算审查法",{"key":31,"text":198,"correct":22},"全面审查法",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},910167,"（2017年考题）下列不同计价方式的合同中,建设单位最难控制工程造价的是（）。",[203,204,206,208],{"key":20,"text":102,"correct":26},{"key":24,"text":205,"correct":22},"单价全同",{"key":28,"text":207,"correct":22},"目标成本加奖罚合同",{"key":31,"text":43,"correct":22},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":31,"analysis":33},910168,"（2018年考题）根据《标准施工招标文件》,合同价格是指（）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"合同协议书中写明的合同总金额。",{"key":24,"text":216,"correct":22},"合同协议书中写明的不含蓄股价的合同总金额",{"key":28,"text":218,"correct":22},"合同协议书中写明的不含蓄列金额的合同总金额",{"key":31,"text":220,"correct":26},"承包人完成全部承包工作后的工程估算价格。",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":31,"analysis":33},910169,"（2020年真题）根据《标准施工招标文件》对投标文件进行初步评审时，属于投标文件形式审查的是（）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"提交的投标保证金形式是否符合投标须知的规定",{"key":24,"text":228,"correct":22},"投标人是否完全接受招标文件中的合同条款",{"key":28,"text":230,"correct":22},"投标承诺的工期是否满足投标人须知中的要求",{"key":31,"text":232,"correct":26},"投标函是否经法定代表人或其委托代理人签字并加盖单位章",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":28,"analysis":33},910170,"（2020年真题）下列投标报价策略中，（）属于恰当使用不平衡报价方法。",[237,239,241,243],{"key":20,"text":238,"correct":22},"适当降低早结算项目的报价",{"key":24,"text":240,"correct":22},"适当提高晚结算项目的报价.",{"key":28,"text":242,"correct":26},"适当提高预计未来会增加工程量的项目单价",{"key":31,"text":244,"correct":22},"适当提高工程内容说明不清楚的项目单价",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":28,"analysis":33},910171,"（2020年真题）根据标注施工招标文件，发包人应进行工期延长，增加费用，并支付合理利润的情形是（）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"施工过程中发现文物采取措施",{"key":24,"text":252,"correct":22},"遇到不利物质条件采取措施",{"key":28,"text":254,"correct":26},"发包人提供的测量基准点有误导致承包人测量放线工作返工",{"key":31,"text":256,"correct":22},"发包人提供的设备不符合合同要求须进行更换",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},910172,"（2020年真题）下列合同计价方式中，建设单位容易控制造价，施工单位承担风险大的方式有（）。",[261,262,263,264],{"key":20,"text":43,"correct":26},{"key":24,"text":207,"correct":22},{"key":28,"text":39,"correct":22},{"key":31,"text":41,"correct":22},{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":28,"analysis":33},910173,"（2013年考题）根据《标准施工招标文件》，由施工承包单位提出的索赔程序得到了处理，且施工单位接受索赔处理结果的，建设单位应在做出索赔处理答复后（）天内完成赔付。",[269,270,271,272],{"key":20,"text":75,"correct":22},{"key":24,"text":109,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":273,"correct":22},"42",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},910174,"（2013年考题）关于施工成本管理各项工作之间关系的说法，正确的是（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"成本计划能对成本控制的实施进行监督",{"key":24,"text":281,"correct":22},"成本核算是成本计划的基础",{"key":28,"text":283,"correct":22},"成本预算是实现成本目标的保证",{"key":31,"text":285,"correct":26},"成本分析为成本考核提供依据",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},910175,"（2014年考题）下列可导致承包商索赔的原因中，属于业主方违约的是（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"业主指令增加工程量",{"key":24,"text":293,"correct":22},"业主要求提高设计标准",{"key":28,"text":295,"correct":26},"监理人不按时组织验收",{"key":31,"text":297,"correct":22},"材料价格大幅度上涨",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},910176,"（2015年考题）下列施工成本管理方法中，可用于施工成本分析的是（）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"技术进步法",{"key":24,"text":305,"correct":26},"因素分析法",{"key":28,"text":307,"correct":22},"定率估算法",{"key":31,"text":309,"correct":22},"挣值分析法",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},910177,"（2016年考题）按工期-成本同步分析法，造成工程项目实施中出现虚盈现象的原因是（）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"实际成本开支小于计划，实际施工进度落后计划",{"key":24,"text":317,"correct":22},"实际成本开支等于计划，实际施工进度落后计划",{"key":28,"text":319,"correct":22},"实际成本开支大于计划，实际施工进度等于计划",{"key":31,"text":321,"correct":22},"实际成本开支小于计划，实际施工进度等于计划",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},910178,"（2016年考题）采用目标利润法编制成本计划时，目标成本的计算方法是从（）中扣除目标利润。",[326,328,330,332],{"key":20,"text":327,"correct":22},"概算价格",{"key":24,"text":329,"correct":22},"预算价格",{"key":28,"text":331,"correct":26},"合同价格",{"key":31,"text":333,"correct":22},"结算价格",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},910179,"（2016年考题）某工程施工至某月底，经统计分析得：已完工程计划费用1800万元，已完工程实际费用2200万元，拟完工程计划费用1900万元，则该工程此时的进度偏差是（）万元。",[338,340,342,344],{"key":20,"text":339,"correct":26},"-100",{"key":24,"text":341,"correct":22},"-200",{"key":28,"text":343,"correct":22},"-300",{"key":31,"text":345,"correct":22},"-400",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},910180,"（2017年考题）其工程施工至2016年12月底,已完工程计划用2000万元,拟完工程计划费用2500万元,已完工程实际用为1800万元,则此时该工程的费用绩效指数CPI为（）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"0.8",{"key":24,"text":353,"correct":22},"0.9",{"key":28,"text":355,"correct":26},"1.11",{"key":31,"text":357,"correct":22},"1.25",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},910181,"（2017年考题）下列偏差分析方法中，既可分析费用偏差，又可分析进度偏差的是（）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"时标网络图和曲线法",{"key":24,"text":365,"correct":22},"曲线法和控制图法",{"key":28,"text":367,"correct":22},"排列图法和时标网络图法",{"key":31,"text":369,"correct":22},"控制图法和表格法",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},910182,"（2017年考题）下列施工成本考核指标中，属于施工企业对项目成本考核的是（）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"项目施工成本降低率",{"key":24,"text":377,"correct":22},"目标总成本降低率",{"key":28,"text":379,"correct":22},"施工责任目标成本实际降低率",{"key":31,"text":381,"correct":22},"施工计划成本实际降低率",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},910183,"（2018年考题）某工程施工至月底时的情况为：已完工程量120m，实际单价8000元\u002Fm，计划工程量100m，计划单价7500元\u002Fm。则该工程在当月底的费用偏差为（）。",[386,388,390,392],{"key":20,"text":387,"correct":26},"超支6万元",{"key":24,"text":389,"correct":22},"节约6万元",{"key":28,"text":391,"correct":22},"超支15万元",{"key":31,"text":393,"correct":22},"节约15万元",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":28,"analysis":33},910184,"（2018年考题）某项固定资产原值为5万元，预计使用年限为6年，净残值为2000元，采用年数总和法进行折旧时，第三年折旧额为（）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"6857",{"key":24,"text":401,"correct":22},"8000",{"key":28,"text":403,"correct":26},"9143",{"key":31,"text":405,"correct":22},"9520",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},910185,"（2018年考题）下列施工成本管理方法中,能预测在建工程尚需成本数额,为后续工程施工成本和进度控制指明方向的方法是（）。",[410,412,414,415],{"key":20,"text":411,"correct":22},"工期一成本同步分析法",{"key":24,"text":413,"correct":22},"价值工程法",{"key":28,"text":309,"correct":26},{"key":31,"text":305,"correct":22},{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},910186,"（2019年考题）按工程进度编制施工阶段资金使用计划，首要进行的工作是（）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"计算单位时间的资金支出目标",{"key":24,"text":423,"correct":26},"编制工程施工进度计划",{"key":28,"text":425,"correct":22},"绘制资金使用时间进度计划s曲线",{"key":31,"text":427,"correct":22},"计算规定时间内累计资金支出额",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},910187,"（2019年考题）工程施工过程中，对于施工承包单位要求的工程变更。施工承包单位提出的程序是（）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"向建设单位提出书面变更请求，阐明变更理由",{"key":24,"text":435,"correct":22},"向设计单位提出书面变更建议，并附变更图纸",{"key":28,"text":437,"correct":22},"向监理人提出书面变更通知，并附变更详图",{"key":31,"text":439,"correct":26},"向监理人提出书面变更建议。阐明变更依据",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},910188,"（2019年考题）施工项目经理部成本核算账务体系应以（）为对象建立。",[444,446,448,450],{"key":20,"text":445,"correct":22},"单项工程",{"key":24,"text":447,"correct":26},"单位工程",{"key":28,"text":449,"correct":22},"分部工程",{"key":31,"text":451,"correct":22},"分项工程",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},910189,"（2014年考题）某工程施工至2014年7月底，已完工程计划费用（BCWP）为600万元，已完工程实际费用（ACWP）为800万元，拟完工程计划费用（BCWS）为700万元，则该工程此时的偏差情况是（）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"费用节约，进度提前",{"key":24,"text":459,"correct":26},"费用超支，进度拖后",{"key":28,"text":461,"correct":22},"费用节约，进度拖后",{"key":31,"text":463,"correct":22},"费用超支，进度提前",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},910190,"（2014年考题）施工成本核算中，固定资产折旧的起算时间和计提方式分别是固定资产投入使用的（）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"当月起，按月计提",{"key":24,"text":471,"correct":26},"次月起，按月计提",{"key":28,"text":473,"correct":22},"当月起，按年计提",{"key":31,"text":475,"correct":22},"次月起，按年计提",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},910191,"（2015年考题）根据《建设工程价款结算暂行办法》，对于施工承包单位递交的金额为6000万元的工程竣工结算报告，建设单位的审查时限是（）天。",[480,481,483,485],{"key":20,"text":81,"correct":22},{"key":24,"text":482,"correct":22},"45",{"key":28,"text":484,"correct":26},"60",{"key":31,"text":486,"correct":22},"90",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},910192,"（2015年考题）为核算施工成本，施工项目管理部应建立和健全以（）为对象的成本核算财务体系。",[491,492,493,494],{"key":20,"text":447,"correct":26},{"key":24,"text":445,"correct":22},{"key":28,"text":449,"correct":22},{"key":31,"text":451,"correct":22},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":28,"analysis":33},910193,"（2016年考题）施工项目经理部应建立和健全以（）为对象的成本核算账务体系。",[499,500,501,502],{"key":20,"text":451,"correct":22},{"key":24,"text":449,"correct":22},{"key":28,"text":447,"correct":26},{"key":31,"text":445,"correct":22},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":31,"analysis":33},910194,"（2017年考题）某固定资产原价为10000元，预计净残值为1000元，预计使用年限为4年，采用年数总和法进行折旧，则第4年的折旧额为（）元。",[507,509,511,513],{"key":20,"text":508,"correct":22},"2250",{"key":24,"text":510,"correct":22},"1800",{"key":28,"text":512,"correct":22},"1500",{"key":31,"text":514,"correct":26},"900",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":28,"analysis":33},910195,"（2020年真题）采用挣值分析法，动态监控工程进度和费用时，若在某一时点计算得到费用绩效指数大于1,进度绩效指数小于1,则表明该工程当前的实际状态是（）。",[519,520,521,522],{"key":20,"text":457,"correct":22},{"key":24,"text":459,"correct":22},{"key":28,"text":461,"correct":26},{"key":31,"text":523,"correct":22},"费用超支，进度超前",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},910196,"（2020年真题）某固定资产原价50000元，预计净残值500元，使用年限5年，采用双倍余额递减法计算折旧时，第三年折旧额为（）元。",[528,530,532,534],{"key":20,"text":529,"correct":22},"7128",{"key":24,"text":531,"correct":26},"7200",{"key":28,"text":533,"correct":22},"9900",{"key":31,"text":535,"correct":22},"10000",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},910197,"（2019年考题）工程竣工结算审查时，对变更签证凭据审查的主要内容是其真实性、合理性和（）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"严密性",{"key":24,"text":543,"correct":22},"包容性",{"key":28,"text":545,"correct":22},"可行性",{"key":31,"text":547,"correct":26},"有效性",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":33},910198,"（2019年考题）某工程合同约定以银行保函替代预留工程质量保证金，合同签约价为800万元。工程价款结算总额为780万元。根据《建设工程质量保证金管理办法》该保函金额最大为（）万元。",[552,554,556,558],{"key":20,"text":553,"correct":22},"15.6",{"key":24,"text":555,"correct":22},"16.0",{"key":28,"text":557,"correct":26},"23.4",{"key":31,"text":559,"correct":22},"24.0",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":31,"analysis":33},910199,"（2020年真题）根据《建设工程质量保证金管理办法》由于发包人原因导致工程未能按规定期限竣工验收，该工程在承包人提交竣工验收报告后（）天后自动进入缺陷责任期。",[564,565,566,567],{"key":20,"text":81,"correct":22},{"key":24,"text":482,"correct":22},{"key":28,"text":484,"correct":22},{"key":31,"text":486,"correct":26},{"id":569,"libraryId":5,"type":570,"typeLabel":571,"stem":572,"options":573,"answer":585,"analysis":33},910200,2,"多选题","（2019年）按国际造价管理联合会(ICE C)做出的定义,全面造价管理制止有效利用专业知识与技术，对项目（ ）进行筹划和控制",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"过程",{"key":24,"text":577,"correct":26},"资源",{"key":28,"text":579,"correct":26},"成本",{"key":31,"text":581,"correct":26},"盈利",{"key":583,"text":584,"correct":26},"E","风险","BCDE",[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]