[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":571},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,4,50,2821,[13,34,46,57,65,77,89,101,113,121,133,145,157,169,181,190,202,214,226,235,247,259,271,280,292,304,315,327,339,348,356,367,377,389,401,413,425,437,445,457,468,480,490,501,513,521,531,540,550,559],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},908142,1,"单选题","(2010年)下列工程项目管理组织机构模式中，结构简单，隶属关系明确，易于统一指挥，决策迅速的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","直线制",true,{"key":24,"text":25,"correct":26},"B","矩阵制",false,{"key":28,"text":29,"correct":26},"C","职能制",{"key":31,"text":32,"correct":26},"D","直线职能制","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},908143,"(2015年)关于CM承包模式的说法，正确的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"CM合同采用成本加酬金的计价方式",{"key":24,"text":41,"correct":26},"分包合同由CM单位与分包单位签订",{"key":28,"text":43,"correct":26},"总包与分包之间的差价归CM单位",{"key":31,"text":45,"correct":26},"订立CM合同时需要一次确定施工合同总价",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},908144,"(2016年)下列项目管理组织机构形式中，未明确项目经理角色的是()组织机构。",[50,51,53,55],{"key":20,"text":29,"correct":26},{"key":24,"text":52,"correct":22},"弱矩阵制",{"key":28,"text":54,"correct":26},"平衡矩阵制",{"key":31,"text":56,"correct":26},"强矩阵制",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":28,"analysis":33},908145,"(2015年)某施工组织机构如下图所示，该组织机构属于()组织形式。",[61,62,63,64],{"key":20,"text":21,"correct":26},{"key":24,"text":29,"correct":26},{"key":28,"text":32,"correct":22},{"key":31,"text":25,"correct":26},{"id":66,"libraryId":5,"type":15,"typeLabel":16,"stem":67,"options":68,"answer":31,"analysis":33},908146,"(2013年)代理型CM合同由建设单位与分包单位直接签订，一般采用()的合同形式。",[69,71,73,75],{"key":20,"text":70,"correct":26},"固定单价",{"key":24,"text":72,"correct":26},"可调总价",{"key":28,"text":74,"correct":26},"GMP加酬金",{"key":31,"text":76,"correct":22},"简单的成本加酬金",{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":24,"analysis":33},908147,"(2014年)工程项目承包模式中，建设单位组织协调工作量小，但风险较大的是（）。",[81,83,85,87],{"key":20,"text":82,"correct":26},"总分包模式",{"key":24,"text":84,"correct":22},"合作体承包模式",{"key":28,"text":86,"correct":26},"平等承包模式",{"key":31,"text":88,"correct":26},"联合体承包模式",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":20,"analysis":33},908148,"(2009年)建设工程采用CM承包模式时，CM单位有代理型和非代理型两种。工程分包商的签约对象是()。",[93,95,97,99],{"key":20,"text":94,"correct":22},"代理型为业主，非代理型为CM单位",{"key":24,"text":96,"correct":26},"代理型为CM单位，非代理型为业主",{"key":28,"text":98,"correct":26},"无论代理型或非代理型，均为业主",{"key":31,"text":100,"correct":26},"无论代理型或非代理型，均为CM单位",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":31,"analysis":33},908149,"(2012年)关于CM承包模式的说法，正确的是()。",[105,107,109,111],{"key":20,"text":106,"correct":26},"CM单位负责分包工程的发包",{"key":24,"text":108,"correct":26},"CM合同总价在签订CM合同时即确定",{"key":28,"text":110,"correct":26},"CMP可大大减少CM单位的承包风险",{"key":31,"text":112,"correct":22},"CM单位不赚取总包与分包之间的差价",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":20,"analysis":33},908150,"(2011年)下列工程项目管理组织机构形式中，具有较大的机动性和灵活性，能够实现集权与分权的最优结合，但因有双重领导，容易产生扯皮现象的是()。",[117,118,119,120],{"key":20,"text":25,"correct":22},{"key":24,"text":32,"correct":26},{"key":28,"text":21,"correct":26},{"key":31,"text":29,"correct":26},{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":28,"analysis":33},908151,"(2014年)工程项目管理组织机构采用直线制形式的主要优点是（）。",[125,127,129,131],{"key":20,"text":126,"correct":26},"管理业务专门化，易提高工作质量",{"key":24,"text":128,"correct":26},"部门间横向联系强，管理效率高",{"key":28,"text":130,"correct":22},"隶属关系明确，易实现统一指挥",{"key":31,"text":132,"correct":26},"集权与分权结合，管理机构灵活",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":31,"analysis":33},908152,"(2016年)CM(ConstructionManagement)承包模式的特点是()。",[137,139,141,143],{"key":20,"text":138,"correct":26},"建设单位与分包单位直接签订合同",{"key":24,"text":140,"correct":26},"采用流水施工法施工",{"key":28,"text":142,"correct":26},"CM单位可赚取总分包之间的差价",{"key":31,"text":144,"correct":22},"采用快速路径法施工",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":20,"analysis":33},908153,"（2017年考题）建设工程采用平行承包模式的特点是（ ）",[149,151,153,155],{"key":20,"text":150,"correct":22},"有利于缩短建设工期",{"key":24,"text":152,"correct":26},"不利于控制工程质量",{"key":28,"text":154,"correct":26},"业主组织管理简单",{"key":31,"text":156,"correct":26},"工程造价控制难度小",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":28,"analysis":33},908154,"（2017年考题）下列计划表中,属于建设单位计划体系中工程项目建设总进度计划的是（ ）。",[161,163,165,167],{"key":20,"text":162,"correct":26},"年度计划项目表",{"key":24,"text":164,"correct":26},"年度建设资金平衡表",{"key":28,"text":166,"correct":22},"投资计划年度分配表",{"key":31,"text":168,"correct":26},"年度设备平衡表",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":31,"analysis":33},908155,"（2017年考题）直线职能制组织结构的特点是（ ）。",[173,175,177,179],{"key":20,"text":174,"correct":26},"信息传递路径较短",{"key":24,"text":176,"correct":26},"容易形成多头领导",{"key":28,"text":178,"correct":26},"各职能部门间横向联系强",{"key":31,"text":180,"correct":22},"各职能部门职责清楚",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":31,"analysis":33},908156,"(2018年)对于技术复杂、各职能部门之间的技术界面比较繁杂的大型工程项目，宜采用的项目组织形式是（ ） 组织形式。",[185,186,187,189],{"key":20,"text":21,"correct":26},{"key":24,"text":52,"correct":26},{"key":28,"text":188,"correct":26},"中矩阵制",{"key":31,"text":56,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},908157,"（2019年）关于CM承包模式的说法，正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"使工程项目实现有条件的“边设计，边施工”",{"key":24,"text":197,"correct":26},"要求在工程设计全部结束之后，进行施工招标",{"key":28,"text":199,"correct":26},"工程设计与施工由一个总承包单位统筹安排",{"key":31,"text":201,"correct":26},"所有分包不用通过招标的方式展开竞争",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},908158,"（2019年）根据《国务院关于投资体制改革的决定》,工程代建制是一种针对（ ）的建设实施组织方式",[206,208,210,212],{"key":20,"text":207,"correct":26},"经营性政府投资项目",{"key":24,"text":209,"correct":26},"基础设施投资项目",{"key":28,"text":211,"correct":22},"非经营性政府投资项目",{"key":31,"text":213,"correct":26},"核准目录内企业投资项目",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},908160,"(2013年)根据《建筑施工组织设计规范》，单位工程施工组织设计应由()主持编制。",[218,220,222,224],{"key":20,"text":219,"correct":26},"建设单位项目负责人",{"key":24,"text":221,"correct":22},"施工项目负责人",{"key":28,"text":223,"correct":26},"施工单位技术负责人",{"key":31,"text":225,"correct":26},"施工项目技术负责人",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},908161,"(2012年)下列工程项目计划表中，用来阐明各单位工程的建筑面积、投资额、新增固定资产、新增生产能力等建筑总规模及本年计划完成情况的是()。",[230,232,233,234],{"key":20,"text":231,"correct":22},"年度竣工投产交付使用计划表",{"key":24,"text":162,"correct":26},{"key":28,"text":164,"correct":26},{"key":31,"text":166,"correct":26},{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":28,"analysis":33},908162,"(2012年)下列工程项目目标控制方法中，可用来判断工程造价偏差的是()。",[239,241,243,245],{"key":20,"text":240,"correct":26},"控制图法",{"key":24,"text":242,"correct":26},"鱼刺图法",{"key":28,"text":244,"correct":22},"S曲线法",{"key":31,"text":246,"correct":26},"网络计划法",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},908163,"(2011年)下列工程项目目标控制方法组中，控制的原理基本相同、目的也相同的是()。",[251,253,255,257],{"key":20,"text":252,"correct":22},"香蕉曲线法和S曲线法",{"key":24,"text":254,"correct":26},"网络计划法和香蕉曲线法",{"key":28,"text":256,"correct":26},"排列图法和网络计划法",{"key":31,"text":258,"correct":26},"S曲线法和排列图法",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},908164,"(2010年)下列进度计划表中，用来明确各种设计文件交付日期，主要设备交货日期，施工单位进场日期，水、电及道路接通日期等的是()。",[263,265,267,269],{"key":20,"text":264,"correct":26},"工程项目总进度计划表",{"key":24,"text":266,"correct":22},"工程项目进度平衡表",{"key":28,"text":268,"correct":26},"工程项目施工总进度表",{"key":31,"text":270,"correct":26},"单位工程总进度计划表",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},908165,"(2014年)下列工程项目目标控制方法中，可用来掌握产品质量波动情况及质量特征的分布规律，以便对质量状况进行分析判断的是（ ）。",[275,277,278,279],{"key":20,"text":276,"correct":22},"直方图法",{"key":24,"text":242,"correct":26},{"key":28,"text":240,"correct":26},{"key":31,"text":244,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":28,"analysis":33},908166,"(2016年)香蕉曲线法和S曲线法均可用来控制工程造价和工程进度。二者的主要区别是：香蕉曲线以()为基础绘制。",[284,286,288,290],{"key":20,"text":285,"correct":26},"施工横道计划",{"key":24,"text":287,"correct":26},"流水施工计划",{"key":28,"text":289,"correct":22},"工程网络计划",{"key":31,"text":291,"correct":26},"挣值分析计划",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},908167,"(2014年)根据《建筑施工组织设计规范》，按编制对象不同，施工组织设计的三个层次是指（）。",[296,298,300,302],{"key":20,"text":297,"correct":26},"施工总平面图、施工总进度计划和资源需求计划",{"key":24,"text":299,"correct":22},"施工组织总设计、单位工程施工组织设计和施工方案",{"key":28,"text":301,"correct":26},"施工总平面图、施工总进度计划和专项施工方案",{"key":31,"text":303,"correct":26},"施工组织总设计、单位工程施工进度计划和施工作业计划",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},908168,"(2016年)根据《建筑施工组织设计规范》，施工组织设计有三个层次是指()。",[308,309,311,313],{"key":20,"text":299,"correct":22},{"key":24,"text":310,"correct":26},"施工组织总设计、单项工程施工组织设计和施工进度计划",{"key":28,"text":312,"correct":26},"施工组织设计、施工进度计划和施工方案",{"key":31,"text":314,"correct":26},"指导性施工组织设计、实施性施工组织设计和施工方案",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":31,"analysis":33},908169,"(2009年)作为施工承包单位计划体系的重要内容，项目管理实施规划应由()编制。",[319,321,323,325],{"key":20,"text":320,"correct":26},"企业管理层在投标之前",{"key":24,"text":322,"correct":26},"项目经理部在投标之前",{"key":28,"text":324,"correct":26},"企业管理层在开工之前",{"key":31,"text":326,"correct":22},"项目经理部在开工之前",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},908170,"(2009年)为了有效地控制建设工程项目目标，可采取的组织措施之一是()。",[331,333,335,337],{"key":20,"text":332,"correct":22},"制订工作考核标准",{"key":24,"text":334,"correct":26},"论证技术方案",{"key":28,"text":336,"correct":26},"审查工程付款",{"key":31,"text":338,"correct":26},"选择合同计价方式",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":28,"analysis":33},908171,"(2013年)下列工程项目目标控制方法中，可用来找出工程质量主要影响因素的是()。",[343,344,345,347],{"key":20,"text":276,"correct":26},{"key":24,"text":242,"correct":26},{"key":28,"text":346,"correct":22},"排列图法",{"key":31,"text":244,"correct":26},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":28,"analysis":33},908172,"(2011年)下列进度计划表中，用来确定年度施工项目的投资额和年末形象进度，并阐明建设条件落实情况的是()。",[352,353,354,355],{"key":20,"text":166,"correct":26},{"key":24,"text":164,"correct":26},{"key":28,"text":162,"correct":22},{"key":31,"text":266,"correct":26},{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},908173,"(2010年)下列方法中，可同时用来控制工程造价和工程进度的是()。",[360,362,364,366],{"key":20,"text":361,"correct":26},"S曲线和直方图法",{"key":24,"text":363,"correct":26},"直方图和控制图法",{"key":28,"text":365,"correct":26},"排列图法和香蕉曲线法",{"key":31,"text":252,"correct":22},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},908174,"(2015年)根据《建筑施工组织设计规范》，施工组织总设计应由()主持编制。",[371,373,374,376],{"key":20,"text":372,"correct":26},"总承包单位技术负责人",{"key":24,"text":221,"correct":22},{"key":28,"text":375,"correct":26},"总承包单位法定代表人",{"key":31,"text":225,"correct":26},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},908175,"(2015年)下列控制措施中，属于工程项目目标被动控制措施的是( )。",[381,383,385,387],{"key":20,"text":382,"correct":26},"制定实施计划时，考虑影响目标实现和计划实施的不利因素",{"key":24,"text":384,"correct":26},"说明和揭示影响目标实现和计划实施的潜在风险因素",{"key":28,"text":386,"correct":26},"制定必要的备用方案，以应对可能出现的影响目标实现的情况",{"key":31,"text":388,"correct":22},"跟踪目标实施情况，发现目标偏离时及时采取纠偏措施",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},908176,"（2017年考题）编制单位工程施工进度计划时,确定工作项目持续时间需要考虑每班工人数量、限定每班工人数量上限的因素是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":26},"工作项目工程量",{"key":24,"text":396,"correct":26},"最小劳动组合",{"key":28,"text":398,"correct":26},"人工产量定额",{"key":31,"text":400,"correct":22},"最小工作面",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},908177,"（2017年考题）应用直方图法分析工程质量状况时,直方图出现折齿型分布的原因是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"数据分组不当或组距确定不当",{"key":24,"text":408,"correct":26},"少量材料不合格",{"key":28,"text":410,"correct":26},"短时间內工人操作不熟练",{"key":31,"text":412,"correct":26},"数据分类不当",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},908182,"(2013年)下列流水施工参数中，均属于时间参数的是()。",[417,419,421,423],{"key":20,"text":418,"correct":22},"流水节拍和流水步距",{"key":24,"text":420,"correct":26},"流水步距和流水强度",{"key":28,"text":422,"correct":26},"流水强度和流水段",{"key":31,"text":424,"correct":26},"流水段和流水节拍",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},908183,"(2013年)某工程划分为3个施工过程、4个施工段，组织加快的成倍节拍流水施工，流水节拍分别为4天、4天和2天，则应派()个专业工作队参与施工。",[429,431,433,435],{"key":20,"text":430,"correct":26},"2",{"key":24,"text":432,"correct":26},"3",{"key":28,"text":434,"correct":26},"4",{"key":31,"text":436,"correct":22},"5",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},908184,"(2012年)某分部工程划分为两个施工过程、3个施工段组织流水施工，流水节拍分别为3、4、2d和3、5、4d，则流水步距为()。",[441,442,443,444],{"key":20,"text":430,"correct":26},{"key":24,"text":432,"correct":26},{"key":28,"text":434,"correct":22},{"key":31,"text":436,"correct":26},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":31,"analysis":33},908185,"(2012年)关于建设工程等步距异节奏流水施工特点的说法，正确的是()。",[449,451,453,455],{"key":20,"text":450,"correct":26},"施工过程数大于施工段数",{"key":24,"text":452,"correct":26},"流水步距等于流水节拍",{"key":28,"text":454,"correct":26},"施工段之间可能有空闲时间",{"key":31,"text":456,"correct":22},"专业工作队数大于施工过程数",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":31,"analysis":33},908186,"(2011年)关于建设工程等步距异节奏流水施工特点的说法，正确的是()。",[461,463,464,466],{"key":20,"text":462,"correct":26},"专业工作队数等于施工过程数",{"key":24,"text":452,"correct":26},{"key":28,"text":465,"correct":26},"施工段之间可能存在空闲时间",{"key":31,"text":467,"correct":22},"同一施工过程各个施工段的流水节拍相等",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},908187,"(2010年)下列流水施工参数中，属于工艺参数的是()",[472,474,476,478],{"key":20,"text":473,"correct":22},"施工过程",{"key":24,"text":475,"correct":26},"施工段",{"key":28,"text":477,"correct":26},"流水步距",{"key":31,"text":479,"correct":26},"流水节拍",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":31,"analysis":33},908188,"(2010年)某分部工程划分为3个施工过程、4个施工段。组织成倍节拍流水施工，流水节拍分别为6，4，4d，则专业工作队数为()个。",[484,485,486,488],{"key":20,"text":432,"correct":26},{"key":24,"text":434,"correct":26},{"key":28,"text":487,"correct":26},"6",{"key":31,"text":489,"correct":22},"7",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},908189,"(2015年)下列流水施工参数中，属于空间参数的是( )。",[494,496,498,500],{"key":20,"text":495,"correct":26},"施工过程和流水强度",{"key":24,"text":497,"correct":26},"工作面和流水步距",{"key":28,"text":499,"correct":22},"施工段和工作面",{"key":31,"text":422,"correct":26},{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},908190,"(2015年)某工程划分为3个施工过程、4个施工段组织固定节拍流水施工，流水节拍为5天，累计间歇时间为2天，累计提前插入时间为3天，该工程流水施工工期为( )天。",[505,507,509,511],{"key":20,"text":506,"correct":22},"29",{"key":24,"text":508,"correct":26},"30",{"key":28,"text":510,"correct":26},"34",{"key":31,"text":512,"correct":26},"35",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},908191,"(2016年)某工程划分为3个施工过程，4个施工段组织加快的成倍节拍流水施工，流水节拍分别为4天、6天和4天，则需要派出()个专业工作队。",[517,518,519,520],{"key":20,"text":489,"correct":22},{"key":24,"text":487,"correct":26},{"key":28,"text":434,"correct":26},{"key":31,"text":432,"correct":26},{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},908192,"(2014年)建设工程组织流水施工时，某施工过程（专业工作队）在单位时间内完成的工程量称为（ ）。",[525,526,527,529],{"key":20,"text":479,"correct":26},{"key":24,"text":477,"correct":26},{"key":28,"text":528,"correct":26},"流水节奏",{"key":31,"text":530,"correct":22},"流水能力",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},908193,"(2009年)在组织建设工程流水施工时，用来表达流水施工在空间布置上开展状态的参数是()。",[535,536,537,539],{"key":20,"text":479,"correct":26},{"key":24,"text":475,"correct":22},{"key":28,"text":538,"correct":26},"流水强度",{"key":31,"text":473,"correct":26},{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":28,"analysis":33},908194,"(2009年)等节奏流水施工与非节奏流水施工的共同特点是()。",[544,546,547,548],{"key":20,"text":545,"correct":26},"相邻施工过程的流水步距相等",{"key":24,"text":454,"correct":26},{"key":28,"text":462,"correct":22},{"key":31,"text":549,"correct":26},"各施工过程在各施工段的流水节拍相等",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},908195,"(2009年)某分部工程划分为4个施工过程、3个施工段，组织加快的成倍节拍流水施工，如果流水节拍分别为6、4、4、2天，则流水步距为()天。",[554,556,557,558],{"key":20,"text":555,"correct":26},"1",{"key":24,"text":430,"correct":22},{"key":28,"text":434,"correct":26},{"key":31,"text":487,"correct":26},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},908196,"(2009年)某分部工程由3个施工过程组成，分为3个施工段进行流水施工，流水节拍分别为3、4、2天，4、3、2天和2、4、3天。则流水施工工期为()天。",[563,565,567,569],{"key":20,"text":564,"correct":26},"14",{"key":24,"text":566,"correct":26},"15",{"key":28,"text":568,"correct":26},"16",{"key":31,"text":570,"correct":22},"17",[572,575,578,581,584,587],{"id":15,"name":573,"category":7,"favorite":574},"领导干部任职前廉政法规知识测试题",92,{"id":576,"name":577,"category":7,"favorite":15},595,"建筑结构与设备",{"id":579,"name":580,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":582,"name":583,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":585,"name":586,"category":7,"favorite":8},534,"BIM工程师",{"id":588,"name":586,"category":7,"favorite":8},535]