[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-37":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,37,50,2821,[13,34,46,58,70,82,94,104,112,124,136,148,156,168,177,189,198,210,222,234,246,258,270,282,294,306,314,326,338,346,358,370,382,394,406,418,430,442,454,462,474,486,498,510,522,534,546,558,570,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},909901,1,"单选题","（2014年考题）工程网络计划中，关键线路是指（）",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","双代号网络计划中无虚箭线",false,{"key":24,"text":25,"correct":22},"B","单代号网络计划中由关键工作组成",{"key":27,"text":28,"correct":29},"C","双代号时标网络计划中无波形线",true,{"key":31,"text":32,"correct":22},"D","双代号网络计划中由关键节点组成","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},909902,"（2015年考题）计划工期与计算工期相等的双代号网络计划中，某工作的开始节点和完成节点均为关键节点时，说明该工作（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"—定是关键工作",{"key":24,"text":41,"correct":22},"总时差为零",{"key":27,"text":43,"correct":29},"总时差等于自由时差",{"key":31,"text":45,"correct":22},"自由时差为零",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},909903,"（2015年考题）某工程双代号网络计划如下图所示。当计划工期等于计算工期时，工作D的自由时差和总时差分别是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"2和2",{"key":24,"text":53,"correct":22},"1和2",{"key":27,"text":55,"correct":22},"0和2",{"key":31,"text":57,"correct":29},"0和1",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},909904,"（2016年考题）某工程双代号网络计划如下图所示，其中关键线路有（）条。",[62,64,66,68],{"key":20,"text":63,"correct":22},"1",{"key":24,"text":65,"correct":22},"2",{"key":27,"text":67,"correct":29},"3",{"key":31,"text":69,"correct":22},"4",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},909905,"（2017年考题）工程网络计划资源优化的目的是通过改变（），使资源按照时间的分布符会优化目标。",[74,76,78,80],{"key":20,"text":75,"correct":22},"工作间逻辑关系",{"key":24,"text":77,"correct":22},"工作的持续时间",{"key":27,"text":79,"correct":29},"工作的开始时间和完成时间",{"key":31,"text":81,"correct":22},"工作的资源强度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},909906,"（2017年考题）其工程双代号网络图如下图所示,存在的绘错误是（）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"多个起点节点",{"key":24,"text":89,"correct":22},"多个终点节点",{"key":27,"text":91,"correct":22},"节点编号有误",{"key":31,"text":93,"correct":22},"存在循环回路",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},909907,"（2018年考题）工程网络计划中，对关键线路描述正确的是（）。",[98,99,101,103],{"key":20,"text":32,"correct":22},{"key":24,"text":100,"correct":29},"单代号网络计划中时间间隔均为零",{"key":27,"text":102,"correct":22},"双代号时标网络计划中无虚工作",{"key":31,"text":25,"correct":22},{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},909908,"（2018年考题）某工程网络计划中，工作M有两项紧后工作，开始时间分别为12和13。工作M的开始时间为8，持续时间为3则工作M的自由时差为（）。",[108,109,110,111],{"key":20,"text":63,"correct":29},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":27,"analysis":33},909909,"（2018年考题）为缩短工期而采取的进度计划调整方法中，不需要改变网络计划中工作间逻辑关系的是（）。",[116,118,120,122],{"key":20,"text":117,"correct":22},"将顺序进行的工作改为平行作业",{"key":24,"text":119,"correct":22},"重新划分施工段组织流水施工",{"key":27,"text":121,"correct":29},"采取措施压缩关键工作持续时间",{"key":31,"text":123,"correct":22},"将顺序进行的工作改为搭接作业",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":20,"analysis":33},909910,"（2019年考题）双代号网络计划中，关于关键节点说法正确的是（）。",[128,130,132,134],{"key":20,"text":129,"correct":29},"关键工作两端等节点必然是关键节点",{"key":24,"text":131,"correct":22},"关键节点的最早时间与最迟时间必然相等",{"key":27,"text":133,"correct":22},"关键节点组成的线路必然是关键线路",{"key":31,"text":135,"correct":22},"两端是关键节点的工作必然是关键工作",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":20,"analysis":33},909911,"（2013年考题）工程网络计划费用优化的目的是为了寻求（）。",[140,142,144,146],{"key":20,"text":141,"correct":29},"工程总成本最低时的最优工期安排",{"key":24,"text":143,"correct":22},"工期固定条件下的工程费用均衡安排",{"key":27,"text":145,"correct":22},"工程总成本固定条件下的最短工期安排",{"key":31,"text":147,"correct":22},"工期最短条件下的最低工程总成本安排",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":31,"analysis":33},909912,"（2013年考题）某工程双代号网络计划如下图所示，其中关键线路由（）条。",[152,153,154,155],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":29},{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":31,"analysis":33},909913,"（2015年考题）单代号网络计划中，关键线路是指（）的线路。",[160,162,164,166],{"key":20,"text":161,"correct":22},"由关键工作组成",{"key":24,"text":163,"correct":22},"相邻两项工作之间时距均为零",{"key":27,"text":165,"correct":22},"由关键节点组成",{"key":31,"text":167,"correct":29},"相邻两项工作之间时间间隔均为零",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":24,"analysis":33},909914,"（2016年考题）单代号网络计划中，关键线路是指（）的线路。",[172,173,174,175],{"key":20,"text":161,"correct":22},{"key":24,"text":167,"correct":29},{"key":27,"text":165,"correct":22},{"key":31,"text":176,"correct":22},"相邻两项工作之间间隔时间均相等",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},909915,"（2016年考题）工程网络计划费用优化的基本思路是，在网络计划中，当有多条关键线路时，应通过不断缩短（）的关键工作持续时间来达到优化目的。",[181,183,185,187],{"key":20,"text":182,"correct":22},"直接费总和最大",{"key":24,"text":184,"correct":22},"组合间接费用率最小",{"key":27,"text":186,"correct":22},"间接费总和最大",{"key":31,"text":188,"correct":29},"组合直接费用率最小",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":31,"analysis":33},909916,"（2017年考题）工程网络计划中工作，D有两项紧后工作,最早开始时同分别为17和20，工作D的最开始时间为12,持续时间为3,则工作D的自由时差为（）。",[193,195,196,197],{"key":20,"text":194,"correct":22},"5",{"key":24,"text":69,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":65,"correct":29},{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},909917,"（2020年真题）工程网络计划中，应将（）的关键工作作为压缩持续时间的对象。",[202,204,206,208],{"key":20,"text":203,"correct":29},"直接费率最小的",{"key":24,"text":205,"correct":22},"持续时间最长的",{"key":27,"text":207,"correct":22},"直接费率最大的",{"key":31,"text":209,"correct":22},"资源强度最大的",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},909918,"（2020年真题）某工程网络计划执行过程中，工作M的实际进度拖后的时间已经超过其自由时差，但未超过总时差，则工作M实际进度拖后产生的影响是（）",[214,216,218,220],{"key":20,"text":215,"correct":22},"既不影响后续工作的正常进行，也不影响总工期",{"key":24,"text":217,"correct":29},"影响紧后工作中的最早开始时间，但不影响总工期",{"key":27,"text":219,"correct":22},"影响紧后工作的最迟开始时间，同时影响总工期",{"key":31,"text":221,"correct":22},"影响今后工作的最迟开始时间，但不影响总工期",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},909919,"（2019年考题）根据《标准设计施工总承包招标文件》（2012年版）；合同文件包括下列内容:①发包人要求，②中标通知书，③承包人建议，仅就上述三项内容而言，合同文件优先解释顺序为（）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"①②③",{"key":24,"text":229,"correct":29},"②①③",{"key":27,"text":231,"correct":22},"③①②",{"key":31,"text":233,"correct":22},"③②①",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},909920,"（2018年考题）根据《标准施工招标文件》,施工合同文件包括下列内容:①已标价工程量清单；②技术标准和要求:③中标通知书,仅就上述三项内容而言,合同文件的优先解释顺序是（）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"①→②→③",{"key":24,"text":241,"correct":22},"④→①→②",{"key":27,"text":243,"correct":22},"②→①→③",{"key":31,"text":245,"correct":29},"③→②→①",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},909921,"（2020年真题）某工程项目完工后，承包单位于2019年8月8日向业主方提交竣工验收报告。业主方为尽早投入使用，在未组织竣工验收的情况下，于2019年9月11日提前使用该工程，后经承包单位催促下，建设单位于11月12日组织验收，11月13日参与工程竣工验收的各方签署了竣工验收合格意见，该工程的实际竣工时间为（）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"8月8日",{"key":24,"text":253,"correct":29},"9月11日",{"key":27,"text":255,"correct":22},"11月12日",{"key":31,"text":257,"correct":22},"11月13日",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":27,"analysis":33},909922,"（2020年真题）根据《标准施工招标文件》中的通用条款中，属于发包人义务的是（）",[262,264,266,268],{"key":20,"text":263,"correct":22},"发出开工通知",{"key":24,"text":265,"correct":22},"编制施工组织总设计",{"key":27,"text":267,"correct":29},"组织设计交底",{"key":31,"text":269,"correct":22},"施工期间照管工程",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},909923,"（2019年考题）保证工程项目管理信息系统正常运行的基础是（）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"结构化数据",{"key":24,"text":277,"correct":29},"信息管理制度",{"key":27,"text":279,"correct":22},"计算机网络环境",{"key":31,"text":281,"correct":22},"非结构化数据",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},909924,"（2013年考题）某企业年初从银行借款600万元，年利率12%，按月计算并支付利息，则每月末应支付利息（）万元。",[286,288,290,292],{"key":20,"text":287,"correct":22},"5.69",{"key":24,"text":289,"correct":29},"6.00",{"key":27,"text":291,"correct":22},"6.03",{"key":31,"text":293,"correct":22},"6.55",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},909925,"（2015年考题）某项两年期借款，年名义利率12%，按季度计息，则每季度的有效利率为（）。",[298,300,302,304],{"key":20,"text":299,"correct":29},"3.00%",{"key":24,"text":301,"correct":22},"3.03%",{"key":27,"text":303,"correct":22},"3.14%",{"key":31,"text":305,"correct":22},"3.17%",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},909926,"（2015年考题）在资金时间价值的作用下，下列现金流量图（单位：万元）中，有可能与第2期期末800万元现金流入等值的是（）。",[310,311,312,313],{"key":20,"text":20,"correct":29},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":27,"analysis":33},909927,"（2016年考题）某企业年初借款2000万元，按年复利计息，年利率为8%。第3年末还款1200万元，剩余本息在第5年末全部还清，则第5年末需还本付息（）万元。",[318,320,322,324],{"key":20,"text":319,"correct":22},"1388.80",{"key":24,"text":321,"correct":22},"1484.80",{"key":27,"text":323,"correct":29},"1538.98",{"key":31,"text":325,"correct":22},"1738.66",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},909928,"（2016年考题）某项借款，年名义利率10%，按季复利计息，则季有效利率为（）",[330,332,334,336],{"key":20,"text":331,"correct":22},"2.41%",{"key":24,"text":333,"correct":29},"2.50%",{"key":27,"text":335,"correct":22},"2.52%",{"key":31,"text":337,"correct":22},"3.23%",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},909929,"（2016年考题）在资金时间价值的作用下，下列现金流量图（单位：万元）中，有可能与第2期末1000万元现金流入等值的是（）",[342,343,344,345],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},909930,"（2017年考题）某项借款,名义利率10%,计息周期为月,则有效利率是（）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"8.33%",{"key":24,"text":353,"correct":22},"10.38%",{"key":27,"text":355,"correct":29},"10.47%",{"key":31,"text":357,"correct":22},"10.52%",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},909931,"（2018年考题）关于利率及其影响因素的说法，正确的是（）。",[362,364,366,368],{"key":20,"text":363,"correct":29},"借出资本承担的风险越大利率就越高",{"key":24,"text":365,"correct":22},"社会借贷资本供过于求时，利率就上升",{"key":27,"text":367,"correct":22},"社会平均利润率是利率的最低界限",{"key":31,"text":369,"correct":22},"借出资本的借款期限越长，利率就越低",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},909932,"（2018年考题）企业从银行借入资金500万元，年利率6%期限1年，按季复利计息，到期还本付息，该项借款的年有效利率是（）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"6.00%",{"key":24,"text":377,"correct":22},"6.09%",{"key":27,"text":379,"correct":22},"6.121%",{"key":31,"text":381,"correct":29},"6.136%",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},909933,"（2019年考题）某笔借款年利率6%，每季度复利计息一次，则该笔借款的年实际利率为（）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"6.03%",{"key":24,"text":389,"correct":22},"6.05%",{"key":27,"text":391,"correct":29},"6.14%",{"key":31,"text":393,"correct":22},"6.17%",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},909934,"（2013年考题）某工程建设期2年，建设单位在建设期第1年初和第2年初分别从银行借入资金600万元和400万元，年利率85%；按年计息，建设单位在运营期第3年末偿还贷款500万元后，自运营期第5年末应偿还（）万元才能还清贷款本息。",[398,400,402,404],{"key":20,"text":399,"correct":22},"925.78",{"key":24,"text":401,"correct":22},"956.66",{"key":27,"text":403,"correct":29},"1079.84",{"key":31,"text":405,"correct":22},"1163.04",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},909935,"（2014年考题）某工程建设期2年，建设单位在建设期第1年初和第2年初分别从银行借入700万元和500万元，年利率8%，按年计息，建设单位在运营期前3年每年末等额偿还贷款本息，则每年应偿还（）万元。",[410,412,414,416],{"key":20,"text":411,"correct":22},"452.16",{"key":24,"text":413,"correct":22},"487.37",{"key":27,"text":415,"correct":29},"526.36",{"key":31,"text":417,"correct":22},"760.67",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},909936,"（2014年考题）某企业年初从银行贷款800万元，年名义利率10%，按季度计算并支付利息，则每季度末应支付利息（）万元。",[422,424,426,428],{"key":20,"text":423,"correct":22},"19.29",{"key":24,"text":425,"correct":29},"20.00",{"key":27,"text":427,"correct":22},"20.76",{"key":31,"text":429,"correct":22},"26.67",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},909937,"（2015年考题）某企业借款1000万元，期限2年，年利率8%，按年复利计息，到期一次性还本付息，则第2年应计的利息为（）万元。",[434,436,438,440],{"key":20,"text":435,"correct":22},"40.0",{"key":24,"text":437,"correct":22},"80.0",{"key":27,"text":439,"correct":22},"83.2",{"key":31,"text":441,"correct":29},"86.4",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},909938,"（2017年考题）其企业前3年每年初借款1000万元,按年复利计息，年利率为8%,第5年末还款3000万元,剩余本息在第8年末全面还清,则第8年末需还本付息（）万元。",[446,448,450,452],{"key":20,"text":447,"correct":22},"981.49",{"key":24,"text":449,"correct":22},"990.89",{"key":27,"text":451,"correct":22},"1270.83",{"key":31,"text":453,"correct":29},"1372.49",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},909939,"（2017年考题）在资金时间价值的作用下，下列现金流量图（单位：万元）中，有可能与现金流入现值1200万元等值的是（）。",[458,459,460,461],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":29},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":27,"analysis":33},909940,"（2020年真题）假设年名义利率为5%，计息周期为季度，则年有效利率为（）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"5.00%",{"key":24,"text":469,"correct":22},"5.06%",{"key":27,"text":471,"correct":29},"5.09%",{"key":31,"text":473,"correct":22},"5.12%",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},909941,"（2020年真题）某公司年初借款1000万，年利率5%，按复利计息。若在10年内等额偿还本息，则每年年末应偿还（）万元。",[478,480,482,484],{"key":20,"text":479,"correct":29},"129.50",{"key":24,"text":481,"correct":22},"140.69",{"key":27,"text":483,"correct":22},"150.00",{"key":31,"text":485,"correct":22},"162.89",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},909942,"（2020年真题）现金流量图中表示现金流量三要素的是（）",[490,492,494,496],{"key":20,"text":491,"correct":22},"利率、利息、净现值",{"key":24,"text":493,"correct":22},"时长、方向、作用点",{"key":27,"text":495,"correct":22},"现值、终值、计算期",{"key":31,"text":497,"correct":29},"大小、方向、作用点",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},909943,"（2019年考题）某企业向银行借款1000万，借款期为四年，年利率6%，复利计息，年末结息。则第四年末企业需向银行支付多少（ ）万元。",[502,504,506,508],{"key":20,"text":503,"correct":22},"1030",{"key":24,"text":505,"correct":22},"1060",{"key":27,"text":507,"correct":22},"1240",{"key":31,"text":509,"correct":29},"1262",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},909944,"（2013年考题）采用投资收益率指标评价投资方案经济效果的优点是（）。",[514,516,518,520],{"key":20,"text":515,"correct":29},"指标的经济意义明确，直观",{"key":24,"text":517,"correct":22},"考虑了投资收益的时间因素",{"key":27,"text":519,"correct":22},"容易选择正常生产年份",{"key":31,"text":521,"correct":22},"反映了资本的周转速度",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},909945,"（2013年考题）采用盈亏平衡分析法进行投资方案不确定性分析的优点是能够（）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"揭示产生项目风险的根源",{"key":24,"text":529,"correct":29},"度量项目风险的大小",{"key":27,"text":531,"correct":22},"投资项目风险的降低途径",{"key":31,"text":533,"correct":22},"说明不确定因素的变动情况",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},909946,"（2013年考题）偿债备代付率是指投资方案在借款偿还期内（）的比值。",[538,540,542,544],{"key":20,"text":539,"correct":22},"息税前利润与当期应还本付息金额",{"key":24,"text":541,"correct":22},"税后利润与上期应还本付息金额",{"key":27,"text":543,"correct":22},"可用于还本付息的资金与上期应还本付息金额",{"key":31,"text":545,"correct":29},"用于还本付息的资金与当期应还本付息金额",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":27,"analysis":33},909947,"（2013年考题）与净现值相比较，采用内部收益率法评价投资方案经济效果的优点最能够（）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"考虑资金的时间价值",{"key":24,"text":553,"correct":22},"反映项目投资中单位投资的盈利能力",{"key":27,"text":555,"correct":29},"反映投资过程的收益程度",{"key":31,"text":557,"correct":22},"考虑项目在整个计算期内的经济状况",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},909948,"（2014年考题）采用净现值指标评价投资方法经济效果的优点是（）",[562,564,566,568],{"key":20,"text":563,"correct":22},"能够全面反映投资方案中单位投资的使用效果",{"key":24,"text":565,"correct":29},"能够全面反映投资方案在整个计划期内的经济状况",{"key":27,"text":567,"correct":22},"能够直接反映投资方案运营期各年的经营成果",{"key":31,"text":569,"correct":22},"能够直接反映投资方案中的资本调整速度",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":31,"analysis":33},909949,"（2014年考题）采用投资收益率指标评价投资方案经济效果的缺点是（）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"考虑了投资收益的时间因素，因而使指标计算较复杂",{"key":24,"text":577,"correct":22},"虽在一定程度上反映了投资效果的优劣，但仅适用于投资规模大的复杂工程",{"key":27,"text":579,"correct":22},"只能考虑正常生产年份的投资收益，不能全面考虑整个计算期的投资收益",{"key":31,"text":581,"correct":29},"正常生产年份的选择比较困难，因而使指标计算的主观随意性较大",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":27,"analysis":33},909950,"（2014年考题）采用增量内部投资收益率（IRR）法，挑选计算期相同的两个可行互斥方案时，基准收益率为ic，则保留投资额大的方案的前提条件是（）",[586,588,590,592],{"key":20,"text":587,"correct":22},"IRR>0",{"key":24,"text":589,"correct":22},"IRR\u003C0",{"key":27,"text":591,"correct":29},"IRR>ic",{"key":31,"text":593,"correct":22},"IRR\u003Cic",[595,598,601,604,607,610],{"id":15,"name":596,"category":7,"favorite":597},"领导干部任职前廉政法规知识测试题",92,{"id":599,"name":600,"category":7,"favorite":15},595,"建筑结构与设备",{"id":602,"name":603,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":605,"name":606,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":608,"name":609,"category":7,"favorite":8},534,"BIM工程师",{"id":611,"name":609,"category":7,"favorite":8},535]