[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,36,50,2821,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,354,366,377,385,395,405,414,426,438,450,462,473,485,497,509,521,533,542,553,563,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},909850,1,"单选题","（2018年考题）根据《国务院关于投资体制改革的决定》实行备案制的项目是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","政府直接投资的项目",false,{"key":24,"text":25,"correct":22},"B","采用资金注入方式的政府投资项目",{"key":27,"text":28,"correct":29},"C","政府核准的投资项目目录外的企业投资项目",true,{"key":31,"text":32,"correct":22},"D","政府核准的投资项目目录内的企业投资项目","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},909851,"（2020年真题）应用BIM技术能够强化工程造价管理的主要原因在于（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"BIM可用来构建可视化模型.",{"key":24,"text":41,"correct":22},"BIM可用来模拟施工方案",{"key":27,"text":43,"correct":22},"BIM可用来检查管线碰撞",{"key":31,"text":45,"correct":29},"BIM可用来自动算量",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},909852,"（2020年真题）建设工程项目后评价采用的基本方法（）",[50,52,54,56],{"key":20,"text":51,"correct":29},"对比评价法",{"key":24,"text":53,"correct":22},"效应判断法",{"key":27,"text":55,"correct":22},"影响评估法",{"key":31,"text":57,"correct":22},"效果梳理法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},909853,"（2020年真题）根据《国务院关于投资体制改革的决定》，企业不使用政府资金投资建设需核准的项目时，政府部门在投资决策阶段仅需审批的文件是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"可行性研究报告",{"key":24,"text":65,"correct":22},"初步设计文件",{"key":27,"text":67,"correct":22},"资金申请报告",{"key":31,"text":69,"correct":29},"项目申请报告",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},909854,"（2013年考题）代理型CM合同由建设单位与分包单位直接签订，一般采用（）的合同形式。",[74,76,78,80],{"key":20,"text":75,"correct":22},"固定单价",{"key":24,"text":77,"correct":22},"可调总价",{"key":27,"text":79,"correct":22},"GMP加酬金",{"key":31,"text":81,"correct":29},"简单的成本加酬金",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},909855,"（2014年考题）工程项目承包模式中，建设单位组织协调工作量小，但风险较大的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"总分包模式",{"key":24,"text":89,"correct":29},"合作体承包模式",{"key":27,"text":91,"correct":22},"平行承包模式",{"key":31,"text":93,"correct":22},"联合体承包模式",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},909856,"（2014年考题）工程项目管理组织机构采用直线制形式的主要优点是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"管理业务专门化，易提高工作质量",{"key":24,"text":101,"correct":22},"部门间横向联系强，管理效率高",{"key":27,"text":103,"correct":29},"隶属关系明确，易实现统一指挥",{"key":31,"text":105,"correct":22},"集权与分权结合，管理机构灵活",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},909857,"（2016年考题）CM（ConstructionManagement）承包模式的特点是（）",[110,112,114,116],{"key":20,"text":111,"correct":22},"建设单位与分包单位直接签订合同",{"key":24,"text":113,"correct":22},"采用流水施工法施工",{"key":27,"text":115,"correct":22},"CM单位可赚取总分包之间的差价",{"key":31,"text":117,"correct":29},"采用快速路径法施工",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},909858,"（2016年考题）下列项目管理组织机构形式中，未明确项目经理角色的是（）组织机构。",[122,124,126,128],{"key":20,"text":123,"correct":22},"职能制",{"key":24,"text":125,"correct":29},"弱矩阵制",{"key":27,"text":127,"correct":22},"平衡矩阵制",{"key":31,"text":129,"correct":22},"强矩阵制",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},909859,"（2017年考题）建设工程采用平行承包模式的特点是（）",[134,136,138,140],{"key":20,"text":135,"correct":29},"有利于缩短建设工期",{"key":24,"text":137,"correct":22},"不利于控制工程质量",{"key":27,"text":139,"correct":22},"业主组织管理简单",{"key":31,"text":141,"correct":22},"工程造价控制难度小",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},909861,"（2019年考题）关于CM承包模式的说法，正确的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":29},"使工程项目实现有条件的“边设计，边施工”",{"key":24,"text":149,"correct":22},"秉承在工程设计全部结束之后，进行施工招标",{"key":27,"text":151,"correct":22},"工程设计与施工由一个总承包单位统筹安排",{"key":31,"text":153,"correct":22},"所有分包不通过招标的方式展开竞争",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},909862,"（2015年考题）关于CM承包模式的说法，正确的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":29},"CM合同采用成本加酬金的计价方式",{"key":24,"text":161,"correct":22},"分包合同由CM单位与分包单位签订",{"key":27,"text":163,"correct":22},"总包与分包之间的差价归CM单位",{"key":31,"text":165,"correct":22},"订立CM合同时需要一次确定施工合同总价",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},909863,"（2015年考题）某施工组织机构如下图所示，该组织结构属于（）组织形式。",[170,172,173,175],{"key":20,"text":171,"correct":22},"直线制",{"key":24,"text":123,"correct":22},{"key":27,"text":174,"correct":29},"直线职能制",{"key":31,"text":176,"correct":22},"矩阵制",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},909864,"（2017年考题）直线职能制组织结构的特点是（）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"信息传递路径较短",{"key":24,"text":184,"correct":22},"容易形成多头领导",{"key":27,"text":186,"correct":22},"各职能部门间横向联系强",{"key":31,"text":188,"correct":29},"各职能部门职责清楚",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},909865,"（2020年真题）关于工程项目管理组织机构特点的说法，正确的是（）",[193,195,197,199],{"key":20,"text":194,"correct":29},"矩阵制组织中，项目成员受双重领导",{"key":24,"text":196,"correct":22},"职能制组织中指令唯一且职责清晰",{"key":27,"text":198,"correct":22},"直线制组织中可实现专业化管理",{"key":31,"text":200,"correct":22},"强矩阵制组织中，项目成员仅对职能经理负责",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},909866,"（2014年考题）根据《建筑施工组织设计规范》，按编制对象不同，施工组织设计的三个层次是指（）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"施工总平面图、施工总进度计划和资源需求计划",{"key":24,"text":208,"correct":29},"施工组织总设计、单位工程施工组织设计和施工方案",{"key":27,"text":210,"correct":22},"施工总平面图、施工总进度计划和专项施工方案",{"key":31,"text":212,"correct":22},"施工组织总设计、单位工程施工进度计划和施工作业计划",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},909867,"（2014年考题）下列工程项目目标控制方法中，可用来掌握产品质量波动情况及质量特征的分布规律，以便对质量状况进行分析判断的是（）。",[217,219,221,223],{"key":20,"text":218,"correct":29},"直方图法",{"key":24,"text":220,"correct":22},"鱼刺图法",{"key":27,"text":222,"correct":22},"控制图法",{"key":31,"text":224,"correct":22},"S曲线法",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},909868,"（2015年考题）下列控制措施中，属于工程项目目标被动控制措施的是（）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"制定实施计划时，考虑影响目标实现和计划实施的不利因素",{"key":24,"text":232,"correct":22},"说明和揭示影响目标实现和计划实施的潜在风险因素",{"key":27,"text":234,"correct":22},"制定必要的备用方案，以应对可能出现的影响目标实现的情况",{"key":31,"text":236,"correct":29},"跟踪目标实施情况，发现目标偏离时及时采取纠偏措施",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},909869,"（2016年考题）根据《建筑施工组织设计规范》，施工组织设计有三个层次是指（）",[241,243,245,247],{"key":20,"text":242,"correct":29},"施工组织总设计，单位工程施工组织设计和施工方案",{"key":24,"text":244,"correct":22},"施工组织总设计，单位工程施工组织设计和施工进度计划",{"key":27,"text":246,"correct":22},"施工组织设计，施工进度计划和施工方案",{"key":31,"text":248,"correct":22},"指导性施工组织设计，实时性施工组织设计和施工方案",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":27,"analysis":33},909870,"（2016年考题）香蕉曲线法和S曲线法均可用来控制工程造价和工程进度。二者的主要区别是：香蕉曲线以（）为基础绘制。",[253,255,257,259],{"key":20,"text":254,"correct":22},"施工横道计划",{"key":24,"text":256,"correct":22},"流水施工计划",{"key":27,"text":258,"correct":29},"工程网络计划",{"key":31,"text":260,"correct":22},"挣值分析计划",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},909871,"（2017年考题）编制单位工程施工进度计划时,确定工作项目持续时间需要考虑每班工人数量、限定每班工人数量上限的因素是（）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"工作项目工程量",{"key":24,"text":268,"correct":22},"最小劳动组合",{"key":27,"text":270,"correct":22},"人工产量定额",{"key":31,"text":272,"correct":29},"最小工作面",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},909872,"（2017年考题）下列计划表中,属于建设单位计划体系中工程项目建设总进度计划的是（）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"年度计划项目表",{"key":24,"text":280,"correct":22},"年度建设资金平衡表",{"key":27,"text":282,"correct":29},"投资计划年度分配表",{"key":31,"text":284,"correct":22},"年度设备平衡表",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},909873,"（2017年考题）应用直方图法分析工程质量状况时,直方图出现折齿型分布的原因是（）。",[289,291,293,295],{"key":20,"text":290,"correct":29},"数据分组不当或组距确定不当",{"key":24,"text":292,"correct":22},"少量材料不合格",{"key":27,"text":294,"correct":22},"短时间内工人操作不熟练",{"key":31,"text":296,"correct":22},"数据分类不当",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},909874,"（2018年考题）施工承包单位的项目管理实施规划应由（）组织编制。",[301,303,305,307],{"key":20,"text":302,"correct":22},"施工企业经营负责人",{"key":24,"text":304,"correct":29},"施工项目经理",{"key":27,"text":306,"correct":22},"施工项目技术负责人",{"key":31,"text":308,"correct":22},"施工企业技术负责人",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},909875,"（2018年考题）适用于分析和描述某种质量问题产生原因的统计分析工具是（）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"直方图",{"key":24,"text":316,"correct":22},"控制图",{"key":27,"text":318,"correct":29},"因果分析图",{"key":31,"text":320,"correct":22},"主次因素分析图",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},909876,"（2018年考题）下列组成内容中，属于单位工程施工组织设计纲领性内容的是（）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"施工进度计划",{"key":24,"text":328,"correct":22},"施工方法",{"key":27,"text":330,"correct":22},"施工现场平面布置。",{"key":31,"text":332,"correct":29},"施工部署",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},909877,"（2019年考题）根据《建设工程安全生产管理条例》，专项施工方案由（）专业技术部门组织审核。",[337,339,341,343],{"key":20,"text":338,"correct":22},"建设单位",{"key":24,"text":340,"correct":22},"监理单位",{"key":27,"text":342,"correct":22},"监督机构",{"key":31,"text":344,"correct":29},"施工单位技术部门",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},909878,"（2019年考题）下列工程项目目标控制方法中，可用来随时了解生产过程中质量变化情况的方法是（）。",[349,350,352,353],{"key":20,"text":222,"correct":29},{"key":24,"text":351,"correct":22},"排列图法",{"key":27,"text":218,"correct":22},{"key":31,"text":220,"correct":22},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},909879,"（2013年考题）按工程进度绘制的资金使用计划S曲线必然包括在&ldquo;香蕉图&rdquo;内，该&ldquo;香蕉图&rdquo;是由工程网络计划中全部工程分别按（）绘制的两条S曲线组成。",[358,360,362,364],{"key":20,"text":359,"correct":22},"最早开始时间（ES）开始和最早完成时间（E F）完成",{"key":24,"text":361,"correct":29},"最早开始时间（ES）开始和最迟完成时间（LS）完成",{"key":27,"text":363,"correct":22},"最迟开始时间（LS）开始和最迟完成时间（L完成",{"key":31,"text":365,"correct":22},"最迟开始时间（LS）开始和最早完成时间（E完成",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},909880,"（2013年考题）根据《建筑施工组织设计规范》，单位工程施工组织设计应由（）主持编制。",[370,372,374,376],{"key":20,"text":371,"correct":22},"建设单位项目负责人",{"key":24,"text":373,"correct":29},"施工项目负责人",{"key":27,"text":375,"correct":22},"施工单位技术负责人",{"key":31,"text":306,"correct":22},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},909881,"（2013年考题）下列工程项目目标控制方法中，可用来找出工程质量主要影响因素的是（）。",[381,382,383,384],{"key":20,"text":218,"correct":22},{"key":24,"text":220,"correct":22},{"key":27,"text":351,"correct":29},{"key":31,"text":224,"correct":22},{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},909882,"（2015年考题）根据《建筑施工组织设计规范》，施工组织总设计应由（）主持编制。",[389,391,392,394],{"key":20,"text":390,"correct":22},"总承包单位技术负责人",{"key":24,"text":373,"correct":29},{"key":27,"text":393,"correct":22},"总承包单位法定代表人",{"key":31,"text":306,"correct":22},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},909883,"（2020年真题）根据建设工程安全管理条例，危险性较大的分部分项工程专家论证应由（）组织。",[399,400,402,404],{"key":20,"text":338,"correct":22},{"key":24,"text":401,"correct":29},"施工单位",{"key":27,"text":403,"correct":22},"设计单位",{"key":31,"text":340,"correct":22},{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},909884,"（2020年真题）工程项目计划体系中，用来阐明各单位工程建设规模，投资额，新增固定资产，新增生产能力等建设总规模及本年计划完成情况的计划表是（）",[409,410,412,413],{"key":20,"text":278,"correct":22},{"key":24,"text":411,"correct":29},"年度竣工投产交付使用计划表",{"key":27,"text":280,"correct":22},{"key":31,"text":282,"correct":22},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":27,"analysis":33},909885,"（2020年真题）S曲线法比较实际进度和计划进度时，实际累计在计划累计线上，表示（）",[418,420,422,424],{"key":20,"text":419,"correct":22},"实际进度落后于计划进度",{"key":24,"text":421,"correct":22},"计划进度编制过于保守",{"key":27,"text":423,"correct":29},"实际进度超前于计划进度",{"key":31,"text":425,"correct":22},"计划进度偏于紧迫",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},909886,"（2013年考题）下列流水施工多数中，均属于时间参数的是（）。",[430,432,434,436],{"key":20,"text":431,"correct":29},"流水节拍和流水步距",{"key":24,"text":433,"correct":22},"流水步距和流水强度",{"key":27,"text":435,"correct":22},"流水强度和流水段",{"key":31,"text":437,"correct":22},"流水段和流水节拍",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},909887,"（2014年考题）建设工程组织流水施工时，某施工过程（专业工作队）在单位时间内完成的工程量为（）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"流水节拍",{"key":24,"text":445,"correct":22},"流水步距",{"key":27,"text":447,"correct":22},"流水节奏",{"key":31,"text":449,"correct":29},"流水能力",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},909888,"（2015年考题）某工程划分为3个施工工程、4个施工段组织固定节拍流水施工，流水节拍为5天，累计间歇时间为2天，累计提前插入时间为3天，该工程流水施工工期为（）天。",[454,456,458,460],{"key":20,"text":455,"correct":29},"29",{"key":24,"text":457,"correct":22},"30",{"key":27,"text":459,"correct":22},"34",{"key":31,"text":461,"correct":22},"35",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":27,"analysis":33},909889,"（2015年考题）下列流水施工参数中，属于空间参数的是（）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"施工过程和流水强度",{"key":24,"text":469,"correct":22},"工作面和流水步距",{"key":27,"text":471,"correct":29},"施工段和工作面",{"key":31,"text":435,"correct":22},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},909890,"（2016年考题）工程项目组织非节奏流水施工的特点是（）",[477,479,481,483],{"key":20,"text":478,"correct":22},"相邻施工过程的流水步距相等",{"key":24,"text":480,"correct":22},"各施工段上的流水节拍相等",{"key":27,"text":482,"correct":22},"施工段之间没有空闲时间",{"key":31,"text":484,"correct":29},"专业工作队数等于施工过程数",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},909891,"（2016年考题）某工程划分为3个施工过程，4个施工段组织加快的成倍节拍流水施工，流水节拍分别为4天、6天和4天，则需要派出（）个专业作业队。",[489,491,493,495],{"key":20,"text":490,"correct":29},"7",{"key":24,"text":492,"correct":22},"6",{"key":27,"text":494,"correct":22},"4",{"key":31,"text":496,"correct":22},"3",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":31,"analysis":33},909892,"（2017年考题）其工程有3个施工过程,分为4个施工段组织流水施工。流水节拍分别为2、3、4、3天；4、2、3、5天；3、2、2、4天。则流水施工工期为（）",[501,503,505,507],{"key":20,"text":502,"correct":22},"17",{"key":24,"text":504,"correct":22},"19",{"key":27,"text":506,"correct":22},"20",{"key":31,"text":508,"correct":29},"21",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},909893,"（2017年考题）下列流水施工参数中,属于时间参数的是（）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"施工过程和流水步距",{"key":24,"text":516,"correct":29},"流水步距和流水节拍",{"key":27,"text":518,"correct":22},"施工段和流水强度",{"key":31,"text":520,"correct":22},"流水强度和工作面",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},909894,"（2018年考题）某分部工程流水施工计划如下图所示，该流水施工的组织形式是（）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"异步距异节奏流水施工",{"key":24,"text":528,"correct":22},"等步距异节奏流水施工",{"key":27,"text":530,"correct":22},"有提前插入时间的固定节拍流水施工",{"key":31,"text":532,"correct":29},"有间歇时间的固定节拍流水施工",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},909895,"（2018年考题）某工程有3个施工过程，分为3个施工段组织流水施工。3个施L过程的流水节拍依次为3.3.4天，5.2.1天和4.1.5天，则流水施工工期为（）天。",[537,538,539,541],{"key":20,"text":492,"correct":22},{"key":24,"text":502,"correct":22},{"key":27,"text":540,"correct":29},"18",{"key":31,"text":504,"correct":22},{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":27,"analysis":33},909896,"（2019年考题）建设工程组织流水施工时，用来表述流水施工在施工工艺方面进展状态的参数是（）。",[546,548,550,551],{"key":20,"text":547,"correct":22},"施工段和流水步距",{"key":24,"text":549,"correct":22},"流水步距和施工过程",{"key":27,"text":467,"correct":29},{"key":31,"text":552,"correct":22},"流水强度和施工段",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":31,"analysis":33},909897,"（2013年考题）某工程划分为三个施工过程、4个施工段，组织加快的成倍节拍流水施工，流水节拍分别为4天、4天和2天，则应派（）个专业工作队参与施工。",[557,559,560,561],{"key":20,"text":558,"correct":22},"2",{"key":24,"text":496,"correct":22},{"key":27,"text":494,"correct":22},{"key":31,"text":562,"correct":29},"5",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":31,"analysis":33},909898,"（2014年考题）某工程划分为三个施工过程、4个施工段组织流水施工，流水节拍见下表，则该工程流水施工工期为（）天。 流水节拍表（单位：天）",[567,569,571,573],{"key":20,"text":568,"correct":22},"22",{"key":24,"text":570,"correct":22},"23",{"key":27,"text":572,"correct":22},"26",{"key":31,"text":574,"correct":29},"27",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},909899,"（2020年真题）建设工程组织流水施工时，用来表达流水施工在施工工艺方面进展状态的参数（）",[579,581,583,585],{"key":20,"text":580,"correct":29},"流水强度和施工过程",{"key":24,"text":582,"correct":22},"流水节拍和施工段",{"key":27,"text":584,"correct":22},"工作面和施工过程",{"key":31,"text":586,"correct":22},"流水步距和施工段",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":31,"analysis":33},909900,"（2019年考题）某工程有3个施工过程，分为3个施工段组织流水施工。3个施L过程的流水节拍依次为3、3、4天，5、2、1天和4、1、5天，则流水施工工期为( )天。",[591,593,595,597],{"key":20,"text":592,"correct":22},"10",{"key":24,"text":594,"correct":22},"12",{"key":27,"text":596,"correct":22},"16",{"key":31,"text":540,"correct":29},[599,602,605,608,611,614],{"id":15,"name":600,"category":7,"favorite":601},"领导干部任职前廉政法规知识测试题",92,{"id":603,"name":604,"category":7,"favorite":15},595,"建筑结构与设备",{"id":606,"name":607,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":609,"name":610,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":612,"name":613,"category":7,"favorite":8},534,"BIM工程师",{"id":615,"name":613,"category":7,"favorite":8},535]