[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,33,50,2821,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,331,343,355,367,379,391,403,412,424,435,443,455,467,478,490,502,513,522,534,546,555,567,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},909697,1,"单选题","下列不属于横道图优点的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","能够较为准确的反映各工作之间的逻辑关系",true,{"key":24,"text":25,"correct":26},"B","简单",false,{"key":28,"text":29,"correct":26},"C","便于掌握工程费用的全貌",{"key":31,"text":32,"correct":26},"D","直观","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},909698,"下列工程费用的纠正措施中属于组织措施的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"进行技术分析",{"key":24,"text":41,"correct":26},"检查资金使用计划有无保障",{"key":28,"text":43,"correct":22},"改善费用控制工作流程",{"key":31,"text":45,"correct":26},"工程变更有无必要",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},909699,"按工程造价构成编制的资金使用计划分为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"单项工程、单位工程和分部分项工程资金使用计划",{"key":24,"text":53,"correct":22},"建筑安装工程费使用计划、设备工器具费使用计划和工程建设其他费使用计划",{"key":28,"text":55,"correct":26},"人工费、材料费、施工机械使用费资金使用计划",{"key":31,"text":57,"correct":26},"人工费、材料费、施工机械使用费、措施费和间接费资金使用计划",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},909700,"下列施工机械折旧方法中，年折旧率为固定值的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"平均年限法和年数总和法",{"key":24,"text":65,"correct":26},"工作量法和加速折旧法",{"key":28,"text":67,"correct":22},"平均年限法和双倍余额递减法",{"key":31,"text":69,"correct":26},"工作量法和年数总和法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},909701,"会计核算法是项目成本核算的一种重要方法，下列属于会计核算法特点的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"人为调节的可能性大",{"key":24,"text":77,"correct":22},"核算范围较大",{"key":28,"text":79,"correct":26},"对核算人员的专业要求不高",{"key":31,"text":81,"correct":26},"核算权债务等较为困难",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},909702,"某固定资产原值为20万元，现评估市值为25万元，预计使用年限为10年，净残值率为5%，采用平均年限法折旧，则年折旧额为（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1.90",{"key":24,"text":89,"correct":26},"2.00",{"key":28,"text":91,"correct":26},"2.38",{"key":31,"text":93,"correct":26},"2.50",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},909703,"施工阶段投资偏差计算，计算方法正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"已完工程计划投资减去已完工程实际投资",{"key":24,"text":101,"correct":26},"拟完工程实际投资减去已完工程计划投资",{"key":28,"text":103,"correct":26},"拟完工程计划投资减去已完工程实际投资",{"key":31,"text":105,"correct":26},"已完工程计划投资减去拟完工程计划投资",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},909704,"在工程项目成本管理中，由进度偏差引起的累计成本偏差可以用（ ）的差值度量。",[110,112,114,116],{"key":20,"text":111,"correct":22},"已完工程预算成本与拟完工程预算成本",{"key":24,"text":113,"correct":26},"已完工程预算成本与已完工程实际成本",{"key":28,"text":115,"correct":26},"已完工程实际成本与拟完工程预算成本",{"key":31,"text":117,"correct":26},"已完工程实际成本与已完工程预算成本",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},909705,"某分部分项工程计划单价6万元\u002Fm3，当月计划完成工程量10m3，当月实际完成工程量16m3，实际单价5万元／m3。下列关于该月投资偏差分析的结果，正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"进度相对偏差为20万元，进度提前",{"key":24,"text":125,"correct":26},"进度绝对偏差为-20万元，进度提前",{"key":28,"text":127,"correct":22},"进度绝对偏差为36万元，进度提前",{"key":31,"text":129,"correct":26},"进度绝对偏差为-36万元，进度提前",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},909706,"施工成本核算中，固定资产折旧的起算时间和计提方式分别是固定资产投入使用的（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"当月起，按月计提",{"key":24,"text":137,"correct":22},"次月起，按月计提",{"key":28,"text":139,"correct":26},"当月起，按年计提",{"key":31,"text":141,"correct":26},"次月起，按年计提",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},909707,"下列关于施工合同内容的改变，不属于工程变更的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"取消一项施工任务",{"key":24,"text":149,"correct":26},"延长合同工期",{"key":28,"text":151,"correct":22},"解除施工合同",{"key":31,"text":153,"correct":26},"改变合同工程的基线",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},909708,"在工程施工过程中，费用偏差是指工程项目或成本的（ ）之间的差额。",[158,160,162,164],{"key":20,"text":159,"correct":26},"预测值与计划值",{"key":24,"text":161,"correct":22},"实际值与计划值",{"key":28,"text":163,"correct":26},"预测值与实际值",{"key":31,"text":165,"correct":26},"实际值与最大值",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},909709,"施工合同履行过程中，监理人在收到施工单位的变更书面建议后，经研究同意变更的，应由（ ）书面答复施工单位。",[170,172,174,176],{"key":20,"text":171,"correct":26},"建设单位",{"key":24,"text":173,"correct":26},"监理单位",{"key":28,"text":175,"correct":22},"监理人",{"key":31,"text":177,"correct":26},"质量监督部门",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},909710,"根据《标准施工招标文件》，施工单位接受索赔处理结果的，建设单位应在作出索赔处理答复后（ ）天内完成赔付，施工承包单位不接受索赔处理结果的，按合同中争议解决条款的约定处理。",[182,184,186,188],{"key":20,"text":183,"correct":26},"14",{"key":24,"text":185,"correct":26},"21",{"key":28,"text":187,"correct":22},"28",{"key":31,"text":189,"correct":26},"42",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},909711,"某固定资产原价为10000元，预计净残值为1000元，预计使用年限为4年，采用年数总和法进行折旧，则第四年的折旧额为（ ）元。",[194,196,198,200],{"key":20,"text":195,"correct":26},"2250",{"key":24,"text":197,"correct":26},"1800",{"key":28,"text":199,"correct":26},"1500",{"key":31,"text":201,"correct":22},"900",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},909712,"下列施工成本考核指标中，属于施工企业对项目成本考核的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"项目施工成本降低率",{"key":24,"text":209,"correct":26},"目标总成本降低率",{"key":28,"text":211,"correct":26},"施工责任目标成本实际降低率",{"key":31,"text":213,"correct":26},"施工计划成本实际降低率",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},909713,"下列偏差分析方法中，既可分析费用偏差，又可分析进度偏差的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"时标网络图和曲线法",{"key":24,"text":221,"correct":26},"曲线法和控制图法",{"key":28,"text":223,"correct":26},"排列图法和时标网络图法",{"key":31,"text":225,"correct":26},"控制图法和表格法",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},909714,"在工程项目施工成本管理过程中，施工成本核算是以（ ）为核算对象的。",[230,232,234,236],{"key":20,"text":231,"correct":26},"建设单位的可控责任成本",{"key":24,"text":233,"correct":26},"施工单位的可控责任成本",{"key":28,"text":235,"correct":22},"项目经理授权范围相对应的可控责任成本",{"key":31,"text":237,"correct":26},"监理单位的可控责任成本",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},909715,"某企业固定资产原价为10000元，预计净残值600元，预计可使用5年。采用平均年限法计算第4年的折旧额为（ ）元。",[242,244,246,248],{"key":20,"text":243,"correct":26},"1900",{"key":24,"text":245,"correct":26},"2000",{"key":28,"text":247,"correct":22},"1880",{"key":31,"text":249,"correct":26},"830",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},909716,"在工程索赔过程中，工期索赔是指由于（ ）的原因导致施工进度拖延，而要求批准延长合同工期的索赔。",[254,256,258,260],{"key":20,"text":255,"correct":22},"非施工承包单位",{"key":24,"text":257,"correct":26},"施工承包单位",{"key":28,"text":259,"correct":26},"不可抗力",{"key":31,"text":261,"correct":26},"施工单位项目经理",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},909717,"施工项目成本分析的基本方法是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"差额计算法",{"key":24,"text":269,"correct":26},"平均年限法",{"key":28,"text":271,"correct":26},"三点估算法",{"key":31,"text":273,"correct":26},"指数平滑法",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},909718,"根据我国现行合同条款，在合同履行过程中，承包人发现有变更情况的，可向监理人提出（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"变更指示",{"key":24,"text":281,"correct":26},"变更意向书",{"key":28,"text":283,"correct":22},"变更建议书",{"key":31,"text":285,"correct":26},"变更报价书",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},909719,"根据我国现行合同条件，关于工程索赔的说法中，正确的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"监理人未能及时发出指令不能视为发包人违约",{"key":24,"text":293,"correct":26},"因政策法令的变化不能提出索赔",{"key":28,"text":295,"correct":26},"机械停工按照机械台班单价计算索赔",{"key":31,"text":297,"correct":22},"监理人指令承包商加速施工有时也会产生索赔",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},909720,"某工程施工至2013年9月底，已完工程计划费用（BCWP）为800万元，已完工程实际费用（ACWP）为600万元，拟完工程计划费用（BCWS）为700万元，则该工程此时的偏差情况是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"费用节约，进度提前",{"key":24,"text":305,"correct":26},"费用超支，进度拖后",{"key":28,"text":307,"correct":26},"费用节约，进度拖后",{"key":31,"text":309,"correct":26},"费用超支，进度提前",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},909721,"中标人确定后，招标人应当向中标人发出中标通知书，同时通知未中标人，并与中标人在（ ）日内签订书面合同。",[314,316,318,320],{"key":20,"text":315,"correct":26},"5",{"key":24,"text":317,"correct":26},"10",{"key":28,"text":319,"correct":26},"15",{"key":31,"text":321,"correct":22},"30",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},909722,"招标人与中标人签订合同后（ ）个工作日内，应当向中标人和未中标的投标人退还投标保证金。",[326,328,329,330],{"key":20,"text":327,"correct":26},"3",{"key":24,"text":315,"correct":22},{"key":28,"text":317,"correct":26},{"key":31,"text":321,"correct":26},{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":28,"analysis":33},909723,"某工程施工至2016年12月底，已完工程计划费用2000万元，拟完工程计划费用2500万元，已完工程实际费用为1800万元，则此时该工程的费用绩效指数CPI为（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":26},"0.8",{"key":24,"text":338,"correct":26},"0.9",{"key":28,"text":340,"correct":22},"1.11",{"key":31,"text":342,"correct":26},"1.25",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},909724,"在施工合同履行过程中，下列引起费用偏差产生的原因中，不属于客观原因的是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":26},"建筑材料涨价",{"key":24,"text":350,"correct":26},"利率变化",{"key":28,"text":352,"correct":22},"投资规划不当",{"key":31,"text":354,"correct":26},"交通原因",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},909725,"在施工合同履行过程中，下列引起费用偏差产生的原因中，属于施工原因的是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"质量事故",{"key":24,"text":362,"correct":26},"设计标准变更",{"key":28,"text":364,"correct":26},"建设手续不健全",{"key":31,"text":366,"correct":26},"设备涨价",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":31,"analysis":33},909726,"在工程费用监控过程中，明确费用控制人员的任务和职责分工，改善费用控制工作流程等措施，属于费用偏差纠正的（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":26},"合同措施",{"key":24,"text":374,"correct":26},"技术措施",{"key":28,"text":376,"correct":26},"经济措施",{"key":31,"text":378,"correct":22},"组织措施",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":20,"analysis":33},909727,"为核算施工成本，施工项目经理部应建立和健全以（ ）为对象的成本核算财务体系。",[383,385,387,389],{"key":20,"text":384,"correct":22},"单位工程",{"key":24,"text":386,"correct":26},"单项工程",{"key":28,"text":388,"correct":26},"分部工程",{"key":31,"text":390,"correct":26},"分项工程",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},909728,"下列施工成本管理方法中，可用于施工成本分析的是（ ）",[395,397,399,401],{"key":20,"text":396,"correct":26},"技术进步法",{"key":24,"text":398,"correct":22},"因素分析法",{"key":28,"text":400,"correct":26},"定率估算法",{"key":31,"text":402,"correct":26},"挣值分析法",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},909729,"在施工合同履行过程中，如因施工当地发生停电而导致工期延长，则施工单位应当在知道或者应当知道这一索赔事件发生后（ ）天内，向监理人递交索赔意向通知书。",[407,408,410,411],{"key":20,"text":327,"correct":26},{"key":24,"text":409,"correct":26},"7",{"key":28,"text":317,"correct":26},{"key":31,"text":187,"correct":22},{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":28,"analysis":33},909730,"承包企业项目成本考核，包括企业对项目成本的考核和企业对项目经理部可控责任成本的考核，下列属于项目经理部可控责任考核指标的是（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":26},"项目施工成本降低额=项目施工合同成本-项目实际施工成本",{"key":24,"text":419,"correct":26},"项目设计成本降低额=项目设计成本降低额／项目设计合同成本×100%",{"key":28,"text":421,"correct":22},"目标总成本降低额=项目经理责任目标总成本-工程竣工结算总成本",{"key":31,"text":423,"correct":26},"施工责任目标成本实际降低额=项目施工合同成本-工程竣工结算总成本",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},909731,"在建设工程合同实施过程中，用于纠正费用偏差的合同措施是（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":26},"落实费用控制人员",{"key":24,"text":431,"correct":22},"落实合同规定责任",{"key":28,"text":433,"correct":26},"制定合理的技术方案",{"key":31,"text":45,"correct":26},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},909732,"某工程施工至2018年7月底，已完工程计划费用(BCWP)为600万元，已完工程实际费用(ACWP)为800万元，拟完工程计划费用(BCWS)为700万元，则该工程此时的偏差情况是（ ）。",[439,440,441,442],{"key":20,"text":303,"correct":26},{"key":24,"text":305,"correct":22},{"key":28,"text":307,"correct":26},{"key":31,"text":309,"correct":26},{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":31,"analysis":33},909733,"关于施工成本核算中折旧描述正确的是（ ）。",[447,449,451,453],{"key":20,"text":448,"correct":26},"固定资产折旧从固定资产投入使用月份起，按月计提",{"key":24,"text":450,"correct":26},"停止使用的固定资产，从停用月份起，停止计提折旧",{"key":28,"text":452,"correct":26},"企业无权选择具体折旧方法和折旧年限",{"key":31,"text":454,"correct":22},"折旧年限和折旧方法一经确定，不得随意变更",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":20,"analysis":33},909734,"某工程计划外购商品混凝土3000m3，计划单价420元／m3，实际采购3100m3，实际单价450元／m3，则由于采购量增加而使外购商品混凝土成本增加（）万元。",[459,461,463,465],{"key":20,"text":460,"correct":22},"4．2",{"key":24,"text":462,"correct":26},"4．5",{"key":28,"text":464,"correct":26},"9．0",{"key":31,"text":466,"correct":26},"9．3",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},909735,"下列方法中，可用于编制工程项目成本计划的是（）。",[471,472,474,476],{"key":20,"text":402,"correct":26},{"key":24,"text":473,"correct":22},"目标利润法",{"key":28,"text":475,"correct":26},"工期—成本同步分析法",{"key":31,"text":477,"correct":26},"成本分析表法",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},909736,"在保修期限内，下列缺陷或事故，应由承包人承担保修费用的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":26},"发包人指定的分包人造成的质量缺陷",{"key":24,"text":485,"correct":22},"由承包人采购的建筑构配件不符合质量要求",{"key":28,"text":487,"correct":26},"使用人使用不当造成的损坏",{"key":31,"text":489,"correct":26},"不可抗力造成的质量缺陷",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},909738,"根据财政部、建设部关于印发《建设工程价款结算暂行办法》的通知（财建[2004]369号），单项工程竣工后，施工承包单位应按规定程序向建设单位递交竣工结算报告及完整的结算资料，建设单位针对500万元以下和500万～2000万元的审查时限分别是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"20天和30天",{"key":24,"text":497,"correct":26},"30天和40天",{"key":28,"text":499,"correct":26},"20天和45天",{"key":31,"text":501,"correct":26},"30天和60天",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},909739,"根据《建设工程价款结算暂行办法》，对于施工承包单位递交的金额为6000万元的竣工结算报告，建设单位的审查时限是（ ）天。（2016年）",[506,507,509,511],{"key":20,"text":321,"correct":26},{"key":24,"text":508,"correct":26},"45",{"key":28,"text":510,"correct":22},"60",{"key":31,"text":512,"correct":26},"90",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":28,"analysis":33},909740,"某工程项目竣工结算报告金额为3500万元，则根据《建设工程价款结算暂行办法》，建设单位对结算报告的审查时限为（ ）日。",[517,519,520,521],{"key":20,"text":518,"correct":26},"20",{"key":24,"text":321,"correct":26},{"key":28,"text":508,"correct":22},{"key":31,"text":510,"correct":26},{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":28,"analysis":33},909741,"关于缺陷责任期内的工程维修及费用承担，下列说法错误的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":26},"不可抗力造成的缺陷，建设单位负责维修，承包单位不承担费用，建设单位不得从保证金中扣除",{"key":24,"text":529,"correct":26},"承包单位造成的缺陷，承包单位负责维修并承担费用后，不免除对工程的一般损失赔偿责任",{"key":28,"text":531,"correct":22},"施工单位不能在合理时间内修复缺陷的，建设单位可自行修得或委托其他人修复，所需的费用和利润由由建设单位自行承担",{"key":31,"text":533,"correct":26},"承包单位造成工程无法使用而需再次检验、修复的，发包人有权要求承包人延长缺陷责任期",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},909742,"下列不适用发承包双方对缺陷责任期约定的期限的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":26},"15个月",{"key":24,"text":541,"correct":26},"12个月",{"key":28,"text":543,"correct":26},"24个月",{"key":31,"text":545,"correct":22},"36个月",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},909743,"在建设工程竣工结算审查时，实行总承包的工程，由（ ）编制单位工程竣工结算，在总包单位审查的基础上由建设单位审查。",[550,552,553,554],{"key":20,"text":551,"correct":26},"总包单位",{"key":24,"text":171,"correct":26},{"key":28,"text":173,"correct":26},{"key":31,"text":257,"correct":22},{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},909744,"工程价款结算主要包括（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":26},"单位工程竣工结算、单项工程竣工结算和工程项目竣工总结算",{"key":24,"text":562,"correct":22},"竣工结算、分阶段结算、专业分包结算和合同中止结算",{"key":28,"text":564,"correct":26},"工程预付款、工程进度款、工程竣工价款结算",{"key":31,"text":566,"correct":26},"按月结算和分段结算",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":28,"analysis":33},909745,"工程项目竣工结算在最后一个单项工程竣工计算审查确认后（ ）天内汇总，送建设单位后30天内审查完成。",[571,572,573,574],{"key":20,"text":315,"correct":26},{"key":24,"text":317,"correct":26},{"key":28,"text":319,"correct":22},{"key":31,"text":518,"correct":26},{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":28,"analysis":33},909746,"发承包双方对缺陷责任期约定的期限最长不超过（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":26},"6个月",{"key":24,"text":582,"correct":26},"1年",{"key":28,"text":584,"correct":22},"2年",{"key":31,"text":586,"correct":26},"3年",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":24,"analysis":33},909747,"根据《标准施工招标文件》(2007年版)中的通用合同条件，由于施工承包单位原因造成某项缺陷不能按原定目标使用而需要再次检查、检验和修复的，建设单位有权要求施工承包单位相应延长缺陷责任期，但缺陷责任期最长不超过（）年。",[591,593,595,596],{"key":20,"text":592,"correct":26},"1",{"key":24,"text":594,"correct":22},"2",{"key":28,"text":327,"correct":26},{"key":31,"text":315,"correct":26},[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]