[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,31,50,2821,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,368,380,392,401,411,423,431,440,452,460,472,484,496,508,520,532,544,556,568,578,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},909595,1,"单选题","工程项目经济评价包括财务分析和经济分析，其中财务分析采用的标准和参数是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","市场利率和净收益",false,{"key":24,"text":25,"correct":22},"B","社会折现率和净收益",{"key":27,"text":28,"correct":29},"C","市场利率和净利润",true,{"key":31,"text":32,"correct":22},"D","社会折现率和净利润","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},909596,"对于以提供公共产品服务于社会为目标的非经营项目，其项目的财务收益是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"政府补贴",{"key":24,"text":41,"correct":22},"营业收入",{"key":27,"text":43,"correct":22},"经营收费",{"key":31,"text":45,"correct":22},"可供分配利润",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},909597,"下列关于工程项目财务分析和经济分析的说法中，正确的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"经济分析采用预测的市场交易价格计量，财务分析采用影子价格计量",{"key":24,"text":53,"correct":29},"项目财务分析的主要标准和参数是净利润、财务净现值、市场利率等，而项目经济分析的主要标准和参数是净收益、经济净现值、社会折现率等",{"key":27,"text":55,"correct":22},"项目财务分析主要采用费用和效益分析的分析方法",{"key":31,"text":57,"correct":22},"项目经济分析的对象是企业或投资人的财务收益和成本",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},909598,"工程设计中运用价值工程的目标是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"降低建设工程全寿命期成本",{"key":24,"text":65,"correct":29},"提高建设工程价值",{"key":27,"text":67,"correct":22},"增强建设工程功能",{"key":31,"text":69,"correct":22},"降低建设工程造价",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},909599,"对工程量大、结构复杂的工程施工图预算，要求审查时间短、效果好的审查方法是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"重点抽查法",{"key":24,"text":77,"correct":22},"分组计算审查法",{"key":27,"text":79,"correct":22},"对比审查法",{"key":31,"text":81,"correct":22},"分解对比审查法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},909600,"在工程项目设计方案评价与优化过程中，最基本和最重要的工作内容是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"针对不同设计方案，分析其技术经济指标",{"key":24,"text":89,"correct":22},"筛选出各方面都比较满意的比选方案",{"key":27,"text":91,"correct":29},"建立合理的指标体系，采取有效的评价方法进行方案优化",{"key":31,"text":93,"correct":22},"进行方案选择或提出技术优化建议",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},909601,"下列关于限额设计的说法正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"限额设计是通过减少使用功能，使工程造价大幅度降低",{"key":24,"text":101,"correct":22},"限额设计可以降低技术标准，使工程造价大幅度降低",{"key":27,"text":103,"correct":22},"限额设计是通过增加投资额，提升使用功能",{"key":31,"text":105,"correct":29},"限额设计需要在投资额度不变的情况下，实现使用功能和建设规模的最大化",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},909602,"设计方案的评价综合费用法的特点是指（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"没有考虑资金的时间价值",{"key":24,"text":113,"correct":22},"是一种动态价值指标评价方法",{"key":27,"text":115,"correct":22},"全面反映功能、质量、安全、环保等方面的差异",{"key":31,"text":117,"correct":22},"适用于建设周期较长的工程",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},909603,"对于具体方案优化，应综合考虑工程质量、造价、工期、安全和环保五大目标，基于（ ）进行优化",[122,124,126,128],{"key":20,"text":123,"correct":29},"全要素造价管理",{"key":24,"text":125,"correct":22},"全方位造价管理",{"key":27,"text":127,"correct":22},"全过程造价管理",{"key":31,"text":129,"correct":22},"全寿命周期造价管理",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},909604,"审查施工图预算，应首先从审查（ ）开始。",[134,136,138,140],{"key":20,"text":135,"correct":22},"定额使用",{"key":24,"text":137,"correct":29},"工程量",{"key":27,"text":139,"correct":22},"设备材料价格",{"key":31,"text":141,"correct":22},"人工、机械使用价格",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},909605,"限额设计的实施是建设工程造价目标的动态反馈和管理过程，其实施的程序是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":29},"目标制定、目标分解、目标推进和成果评价",{"key":24,"text":149,"correct":22},"目标制定、成果评价、目标分解和目标推进",{"key":27,"text":151,"correct":22},"目标制定、目标推进、目标分解和成果评价",{"key":31,"text":153,"correct":22},"目标制定、目标分解、成果评价和目标推进",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},909607,"下列选项中不属于设计概算的审查内容的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"概算编制依据",{"key":24,"text":161,"correct":22},"概算编制深度",{"key":27,"text":163,"correct":22},"概算主要内容",{"key":31,"text":165,"correct":29},"概算编制进度",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},909608,"审查工程设计概算时，总概算投资超过批准投资估算（ ）以上的，需重新上报审批。",[170,172,174,176],{"key":20,"text":171,"correct":22},"5％",{"key":24,"text":173,"correct":22},"8％",{"key":27,"text":175,"correct":29},"10％",{"key":31,"text":177,"correct":22},"15％",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},909609,"设计方案评价与优化过程在完成按照使用功能、技术标准、投资限额的要求，结合工程所在地实际情况，探讨和建立可能的设计方案后紧跟着的工作是（）。",[182,184,186,188],{"key":20,"text":183,"correct":29},"从所有可能的设计方案中初步筛选出各方面都较为满意的方案作为比选方案",{"key":24,"text":185,"correct":22},"根据设计方案的评价目的，明确评价的任务和范围",{"key":27,"text":187,"correct":22},"确定能反映方案特征并能满足评价目的的指标体系",{"key":31,"text":189,"correct":22},"根据设计方案计算各项指标及对比参数",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},909610,"下列关于工程项目设计方案评价综合费用法的说法中，不正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"综合费用法以综合费用最小为最佳方案",{"key":24,"text":197,"correct":22},"综合费用法是一种静态价值指标评价方法",{"key":27,"text":199,"correct":22},"综合费用法只适用于建设周期较短的工程",{"key":31,"text":201,"correct":29},"利用综合费用法能使工程的价值大幅提高",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},909611,"限额设计方式中，采用综合费用法评价设计方案的不足是没有考虑（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"投资方案全寿命期费用",{"key":24,"text":209,"correct":22},"建设周期对投资效益的影响",{"key":27,"text":211,"correct":22},"投资方案投产后的使用费",{"key":31,"text":213,"correct":29},"资金的时间价值",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},909612,"（ ）是对产品进行功能分析，研究如何以最低的寿命期成本实现产品的必要功能，从而提高产品价值",[218,220,222,224],{"key":20,"text":219,"correct":22},"多指标法",{"key":24,"text":221,"correct":22},"单指标法",{"key":27,"text":223,"correct":29},"价值工程法",{"key":31,"text":225,"correct":22},"综合费用法",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},909613,"限额设计的关键是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":29},"投资决策阶段",{"key":24,"text":233,"correct":22},"初步设计阶段",{"key":27,"text":235,"correct":22},"施工图设计阶段",{"key":31,"text":237,"correct":22},"实施阶段",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},909614,"工程造价人员在进行限额设计时，需要满足的要求是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"工程使用功能不变",{"key":24,"text":245,"correct":22},"技术标准不变",{"key":27,"text":247,"correct":22},"工程规模不变",{"key":31,"text":249,"correct":29},"投资额度不变",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},909615,"设计方案的评价方法主要包括（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"多指标法、单指标法以及单因素评分法",{"key":24,"text":257,"correct":22},"单指标法、多因素评分法、功能成本法",{"key":27,"text":259,"correct":29},"多指标法、单指标法以及多因素评分法",{"key":31,"text":261,"correct":22},"多指标法、功能成本法以及多因素评分法",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},909616,"根据FIDIC《土木工程施工合同条件》，给指定分包商的付款应从（ ）中开支。",[266,268,270,272],{"key":20,"text":267,"correct":29},"暂定金额",{"key":24,"text":269,"correct":22},"暂估价",{"key":27,"text":271,"correct":22},"分包管理费",{"key":31,"text":273,"correct":22},"应分摊费用",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},909617,"从投标人的报价策略来说，下列情形中报价可高一些的情形是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"工作简单、工程量大，施工条件好的工程",{"key":24,"text":281,"correct":22},"投标单位急于打人某一市场",{"key":27,"text":283,"correct":22},"投标对手多，竞争激烈",{"key":31,"text":285,"correct":29},"投标对手少的工程",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},909618,"根据《标准施工招标文件》的相关规定，适用于（ ）工程施工招标。",[290,292,294,296],{"key":20,"text":291,"correct":29},"设计和施工不是由同一承包商承担的",{"key":24,"text":293,"correct":22},"设计和施工由同一承包商承担的",{"key":27,"text":295,"correct":22},"采购和施工不是由同一承包商承担的",{"key":31,"text":297,"correct":22},"采购和施工由同一承包商承担的",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},909619,"报价技巧是指投标中具体采用的对策和方法，常用的报价技巧有不平衡报价法、多方案报价法、无利润竞标法和突然降价法等。下列不平衡报价方法的描述中正确的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"前期措施费可以适当降低报价",{"key":24,"text":305,"correct":22},"装饰工程可适当提高报价",{"key":27,"text":307,"correct":22},"预计今后工程量会减少的项目，适当提高单价",{"key":31,"text":309,"correct":29},"单价与包干混合制合同中，招标人要求有些项目采用包干报价时，宜报高价",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},909620,"下列合同计价方式中，建设单位最容易控制造价的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"成本加浮动酬金合同",{"key":24,"text":317,"correct":22},"单价合同",{"key":27,"text":319,"correct":22},"成本加百分比酬金合同",{"key":31,"text":321,"correct":29},"总价合同",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},909621,"下列工程，不适宜无利润报价法的情形是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"有可能在中标后，将大部分工程分包给索价较低的一些分包商",{"key":24,"text":329,"correct":22},"较长时期内，投标单位没有在建工程项目",{"key":27,"text":331,"correct":22},"先以低价获得首期工程，而后赢得机会创造第二期工程中的竞争优势",{"key":31,"text":333,"correct":29},"迷惑对手，提高中标概率",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},909622,"根据《标准施工招标文件》，由发包人提供的材料由于发包人原因发生交易地点变更的，发包人应承担的责任是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"由此增加的费用，工期延误",{"key":24,"text":341,"correct":22},"工期延误，但不考虑费用和利润的增加",{"key":27,"text":343,"correct":22},"由此增加的费用和合理利润，但不考虑工期延误",{"key":31,"text":345,"correct":29},"由此增加的费用，工期延误，以及承包商合理利润",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},909623,"根据《标准施工招标文件》，关于缺陷责任期内缺陷责任的表述正确的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"发包人发现已接收使用的工程存在新的缺陷的，发包人应负责修复",{"key":24,"text":353,"correct":29},"发包人在使用过程中，发现已修复的缺陷部位又遭损坏的，承包人应负责修复",{"key":27,"text":355,"correct":22},"经查验缺陷属承包人原因造成的，应由承包人承担修复费用，发包人承担查验费用",{"key":31,"text":357,"correct":22},"经查验缺陷属发包人原因造成的，应由发包人承担修复费用，但不支付承包人相应的合理利润",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},909624,"针对不同计价方式的合同比较，建设单位造价控制最容易的方式是指（ ）。",[362,363,364,366],{"key":20,"text":321,"correct":29},{"key":24,"text":317,"correct":22},{"key":27,"text":365,"correct":22},"百分比酬金合同",{"key":31,"text":367,"correct":22},"固定酬金合同",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},909625,"下列不属于不可抗力的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":29},"大风",{"key":24,"text":375,"correct":22},"水灾",{"key":27,"text":377,"correct":22},"地震",{"key":31,"text":379,"correct":22},"瘟疫",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},909626,"工程施工过程中，由于承包人的原因引起的暂停施工，如承包人在收到监理人暂停施工指示后（ ）天内不认真采取有效的复工措施，造成工期延误，可视为承包人违约，由承包人承担违约责任。",[384,386,388,390],{"key":20,"text":385,"correct":22},"14",{"key":24,"text":387,"correct":22},"28",{"key":27,"text":389,"correct":22},"42",{"key":31,"text":391,"correct":29},"56",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},909627,"施工图审查中按预算定额顺序或施工的先后顺序逐一进行全面审查，且审查得全面、细致、质量高，但工作量大的审查方法是（ ）。",[396,398,399,400],{"key":20,"text":397,"correct":29},"全面审查法",{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":22},{"key":31,"text":81,"correct":22},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},909628,"施工合同中应用广泛，建设单位造价控制容易，施工单位需要承担较大风险的合同是（ ）。",[405,406,407,409],{"key":20,"text":321,"correct":29},{"key":24,"text":317,"correct":22},{"key":27,"text":408,"correct":22},"固定酬金",{"key":31,"text":410,"correct":22},"浮动酬金",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},909629,"在邀请招标中，被邀请的对象最少不应少于（ ）家。",[415,417,419,421],{"key":20,"text":416,"correct":22},"2",{"key":24,"text":418,"correct":29},"3",{"key":27,"text":420,"correct":22},"5",{"key":31,"text":422,"correct":22},"10",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":20,"analysis":33},909630,"《标准施工招标文件》适用于（ ）工程施工招标。",[427,428,429,430],{"key":20,"text":291,"correct":29},{"key":24,"text":293,"correct":22},{"key":27,"text":295,"correct":22},{"key":31,"text":297,"correct":22},{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":31,"analysis":33},909631,"根据《标准施工招标文件》的相关规定，发包人在收到承包人竣工验收申请报告（ ）日后未进行验收的，视为验收合格。",[435,436,437,439],{"key":20,"text":385,"correct":22},{"key":24,"text":387,"correct":22},{"key":27,"text":438,"correct":22},"30",{"key":31,"text":391,"correct":29},{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},909632,"公开招标与邀请招标比较其优点是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"缩短了招标时间",{"key":24,"text":447,"correct":22},"节约了招标费用",{"key":27,"text":449,"correct":22},"不进行资格预审",{"key":31,"text":451,"correct":29},"可以在较广的范围内选择承包商",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},909633,"如果实际工程量与预计工程量可能有较大出入时，应优先选择（ ）。",[456,457,458,459],{"key":20,"text":321,"correct":22},{"key":24,"text":317,"correct":29},{"key":27,"text":365,"correct":22},{"key":31,"text":367,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":20,"analysis":33},909634,"根据《标准施工招标文件》，出现下列情况时，应由发包人负责赔偿的是（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":29},"工程或工程的任何部分对土地的占用所造成的第三者财产损失",{"key":24,"text":467,"correct":22},"在施工场地内造成的第三者人身伤亡",{"key":27,"text":469,"correct":22},"在施工场地毗邻地带造成的第三者人身伤亡",{"key":31,"text":471,"correct":22},"在施工场地毗邻地带造成的第三者财产损失",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},909635,"FIDIC《土木工程施工合同条件》适用于土木工程施工的单价合同形式。由通用条件和专用条件两部分组成，并附有（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":29},"合同协议书、投标函和争端仲裁协议书",{"key":24,"text":479,"correct":22},"合同协议书、设计图纸和争端仲裁协议书",{"key":27,"text":481,"correct":22},"投标函、设计图和争端仲裁协议书",{"key":31,"text":483,"correct":22},"投标函、设计图和资料表",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":24,"analysis":33},909636,"根据FIDIC《土木工程施工合同条件》，下列关于指定分包商的说法正确的是（ ）。",[488,490,492,494],{"key":20,"text":489,"correct":22},"指定分包商承包的工程是承包商承包工程的一部分",{"key":24,"text":491,"correct":29},"给指定分包商的付款应从暂定金额内开支",{"key":27,"text":493,"correct":22},"指定分包商是与业主签订分包合同，由承包商管理",{"key":31,"text":495,"correct":22},"在任何情况下，业主不得直接支付工程款给指定分包商",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},909637,"评标报告应由评标委员会全体成员签字，下列处理方式错误的是（ ）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"对评标结果有不同意见的评标委员会成员应以书面形式说明其不同意见和理由",{"key":24,"text":503,"correct":22},"评标报告应注明该不同意见",{"key":27,"text":505,"correct":22},"评标委员会成员拒绝在评标报告上签字的，视为同意评标结果",{"key":31,"text":507,"correct":29},"评标委员会成员拒绝在评标报告上签字的，视为弃权",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":33},909638,"根据FIDIC《土木工程施工合同条件》，下列关于履约担保的说法中，错误的是（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":22},"承包商应在收到中标函后28夭内向业主提交履约担保",{"key":24,"text":515,"correct":22},"业主应在收到履约证书副本后21天内，将履约担保退还承包商",{"key":27,"text":517,"correct":22},"履约保函应担保承包商圆满完成施工和保修的义务",{"key":31,"text":519,"correct":29},"履约保函应担保工程师颁发工程接收证书为止",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},909639,"采用多方案报价法，可降低投标风险，但投标工作量较大。通常不适用的情形是（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"招标文件中的工程范围不很明确",{"key":24,"text":527,"correct":29},"单价与包干混合制合同中，招标人要求有些项目采用包干报价时",{"key":27,"text":529,"correct":22},"条款不很清楚或很不公正",{"key":31,"text":531,"correct":22},"技术规范要求过于苛刻的工程",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":20,"analysis":33},909640,"对施工承包单位而言，承担风险大的合同计价方式是（ ）方式。",[536,538,540,542],{"key":20,"text":537,"correct":29},"总价",{"key":24,"text":539,"correct":22},"单价",{"key":27,"text":541,"correct":22},"成本加百分比酬金",{"key":31,"text":543,"correct":22},"成本加固定酬金",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},909641,"招标项目设有标底的，标底应当保密，并在（ ）公布。",[548,550,552,554],{"key":20,"text":549,"correct":29},"开标时",{"key":24,"text":551,"correct":22},"开始评标时",{"key":27,"text":553,"correct":22},"宣布中标时",{"key":31,"text":555,"correct":22},"签订书面合同后",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},909642,"采用分组计算审查法审查施工图预算的特点是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":29},"可加快审查进度，但审查精度较差",{"key":24,"text":563,"correct":22},"审查质量高，但审查时间较长",{"key":27,"text":565,"correct":22},"应用范围广，但审查工作量大",{"key":31,"text":567,"correct":22},"审查效果好，但应用范围有局限性",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":27,"analysis":33},909643,"采用邀请招标方式时，邀请对象应以5-10家为宜，至少不应少于（ ）家。",[572,574,575,576],{"key":20,"text":573,"correct":22},"1",{"key":24,"text":416,"correct":22},{"key":27,"text":418,"correct":29},{"key":31,"text":577,"correct":22},"4",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},909644,"实际工程量与预计工程量可能有较大出入时，建设单位应优先选择的合同计价方式是（ ）。",[582,583,585,586],{"key":20,"text":317,"correct":29},{"key":24,"text":584,"correct":22},"成本加固定酬金合同",{"key":27,"text":321,"correct":22},{"key":31,"text":315,"correct":22},{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":31,"analysis":33},909645,"多方案报价法不适用于下列工程项目（ ）。",[591,593,595,597],{"key":20,"text":592,"correct":22},"招标文件中的工程范围不很明确，条款不很清楚",{"key":24,"text":594,"correct":22},"招标文件中的合同条款很不公正",{"key":27,"text":596,"correct":22},"技术规范要求过于苛刻",{"key":31,"text":598,"correct":29},"可能会提前完工的项目",[600,603,606,609,612,615],{"id":15,"name":601,"category":7,"favorite":602},"领导干部任职前廉政法规知识测试题",92,{"id":604,"name":605,"category":7,"favorite":15},595,"建筑结构与设备",{"id":607,"name":608,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":610,"name":611,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":613,"name":614,"category":7,"favorite":8},534,"BIM工程师",{"id":616,"name":614,"category":7,"favorite":8},535]