[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,25,50,2821,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,201,212,223,235,247,259,271,283,292,304,316,328,340,351,363,375,387,399,411,423,435,444,456,468,480,492,504,516,523,535,547,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},909284,1,"单选题","与净现值相比较，采用内部收益率法评价投资方案经济效果的优点是能够（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","考虑资金的时间价值",false,{"key":24,"text":25,"correct":22},"B","反映项目投资中单位投资的盈利能力",{"key":27,"text":28,"correct":29},"C","反映投资过程的收益程度",true,{"key":31,"text":32,"correct":22},"D","考虑项目在整个计算期内的经济状况","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},909285,"某技术方案的现金流量为常规现金流量，当基准收益率为8%时，净现值为400万元。若基准收益率变为10%，该技术方案的NPV将（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"大于400万元",{"key":24,"text":41,"correct":29},"小于400万元",{"key":27,"text":43,"correct":22},"等于400万元",{"key":31,"text":45,"correct":22},"不确定",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},909286,"进行独立性投资方案经济效果评价时，认为方案在经济上可行、能够通过绝对经济效果检验的条件是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"增量投资收益率不小于基准投资收益率",{"key":24,"text":53,"correct":29},"静态投资回收期不超过基准投资回收期",{"key":27,"text":55,"correct":22},"投资收益率非负",{"key":31,"text":57,"correct":22},"增量投资回收期不超过基准投资回收期",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},909287,"甲乙两个互斥方案寿命期相同，甲方案的财务内部收益率为16%，乙方案的财务内部收益率为18%，两个方案的增量财务内部收益率为8%，当基准收益率为12%时，（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"NPV甲＞NPV乙",{"key":24,"text":65,"correct":29},"NPV乙＞NPV甲",{"key":27,"text":67,"correct":22},"NPV甲=NPV乙",{"key":31,"text":69,"correct":22},"无法确定",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},909288,"以生产能力利用率表示的项目盈亏平衡点越低，表明项目建成投产后的（ ）越小。",[74,76,78,80],{"key":20,"text":75,"correct":22},"盈利可能性",{"key":24,"text":77,"correct":22},"适应市场能力",{"key":27,"text":79,"correct":22},"抗风险能力",{"key":31,"text":81,"correct":29},"盈亏平衡总成本",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},909289,"下列参数中能判断项目盈利能力的参数是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"资产负债率",{"key":24,"text":89,"correct":22},"流动比率",{"key":27,"text":91,"correct":22},"利息备付率",{"key":31,"text":93,"correct":29},"财务内部收益率",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},909290,"用来评价投资方案经济效果的净现值率指标是指项目净现值与（ ）的比值。",[98,100,102,104],{"key":20,"text":99,"correct":22},"固定资产投资总额",{"key":24,"text":101,"correct":22},"建筑安装工程投资总额",{"key":27,"text":103,"correct":29},"项目全部投资现值",{"key":31,"text":105,"correct":22},"建筑安装工程全部投资现值",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},909291,"工程项目盈亏平衡分析的特点是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"能够预测项目风险发生的概率，但不能确定项目风险的影响程度",{"key":24,"text":113,"correct":22},"能够确定项目风险的影响范围，但不能量化项目风险的影响效果",{"key":27,"text":115,"correct":22},"能够分析产生项目风险的根源，但不能提出应对项目风险的策略",{"key":31,"text":117,"correct":29},"能够度量项目风险的大小，但不能揭示产生项目风险的根源",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},909292,"利息备付率是指投资方案在借款偿还期内的（ ）的比值。",[122,124,126,128],{"key":20,"text":123,"correct":29},"息税前利润与当期应付利息",{"key":24,"text":125,"correct":22},"税后利润与上期应还本付息金额",{"key":27,"text":127,"correct":22},"可用于还本付息的资金与上期应还本付息金额",{"key":31,"text":129,"correct":22},"可用于还本付息的资金与当期应还本付息金额",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},909293,"已知某项目设计生产能力为年产100万件产品，根据资料分析，估计单位产品价格为100元，单位产品可变成本80元，全年固定成本为500万元，单位产品销售税金及附加的合并税率为6%，则盈亏平衡生产能力利用率和盈亏平衡单位产品可变成本分别是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"25%，20元",{"key":24,"text":137,"correct":29},"35.71%，89元",{"key":27,"text":139,"correct":22},"25%，14元",{"key":31,"text":141,"correct":22},"35.71%，14元",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},909294,"采用增量投资内部收益率（AIRR）法比选计算期相同的两个可行互斥方案时，基准收益率为ic，则保留投资额大的方案的前提条件是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"△IRR＞0",{"key":24,"text":149,"correct":22},"△IRR＜0",{"key":27,"text":151,"correct":29},"△IRR＞ic",{"key":31,"text":153,"correct":22},"△IRR＜ic",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},909295,"利用投资回收期指标评价投资方案经济效果的不足是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"不能全面反映资本的周转速度",{"key":24,"text":161,"correct":29},"不能全面考虑投资方案整个计算期内的现金流量",{"key":27,"text":163,"correct":22},"不能反映投资回收之前的经济效果",{"key":31,"text":165,"correct":22},"不能反映回收全部投资所需要的时间",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},909296,"投资方案经济效果评价指标中，利息备付率是指投资方案在借款偿还期内的（ ）的比值。",[170,172,174,176],{"key":20,"text":171,"correct":29},"息税前利润与当期应付利息金额",{"key":24,"text":173,"correct":22},"息税前利润与当期应还本付息金额",{"key":27,"text":175,"correct":22},"税前利润与当期应付利息金额",{"key":31,"text":177,"correct":22},"税前利润与当期应还本付息金额",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},909297,"对于效益基本相同但效益难以用货币直接计量的互斥投资方案，在进行比选时常用（ ）替代净现值。",[182,184,186,188],{"key":20,"text":183,"correct":22},"增量投资",{"key":24,"text":185,"correct":29},"费用现值",{"key":27,"text":187,"correct":22},"年折算费用",{"key":31,"text":189,"correct":22},"净现值率",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},909298,"下列经济效果评价方法中，属于动态评价方法的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":29},"净现值法",{"key":24,"text":197,"correct":22},"增量投资收益率",{"key":27,"text":199,"correct":22},"增量投资回收期",{"key":31,"text":187,"correct":22},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},909299,"偿债备付率是指投资方案在借款偿还期内各年（ ）的比值。",[205,207,209,211],{"key":20,"text":206,"correct":22},"可用于偿还利息的资金与当期应付利息",{"key":24,"text":208,"correct":22},"可用于还本付息的资金与当期应付利息",{"key":27,"text":210,"correct":22},"可用于偿还利息的资金与当期应还本付息金额",{"key":31,"text":129,"correct":29},{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},909300,"下列指标中，属于动态指标的是（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"投资收益率",{"key":24,"text":219,"correct":29},"内部收益率",{"key":27,"text":221,"correct":22},"偿债备付率",{"key":31,"text":91,"correct":22},{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},909301,"在分析工程项目抗风险能力时，应分析工程项目在不同阶段可能遇到的不确定性因素和随机因素对其经济效果的影响，这些阶段包括工程项目的（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"策划期和建设期",{"key":24,"text":230,"correct":29},"建设期和运营期",{"key":27,"text":232,"correct":22},"运营期和拆除期",{"key":31,"text":234,"correct":22},"建设期和达产期",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},909302,"采用投资回收期指标评价投资方案的经济效果时，其优点是能够（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"全面考虑整个计算期内的现金流量",{"key":24,"text":242,"correct":22},"作为投资方案选择的可靠性依据",{"key":27,"text":244,"correct":29},"在一定程度上反映资本的周转速度",{"key":31,"text":246,"correct":22},"准确衡量整个计算期内的经济效果",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},909303,"在下列评价方法中，属于互斥型投资方案经济动态评价方法的是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"增量投资回收期法",{"key":24,"text":254,"correct":29},"增量投资内部收益率法",{"key":27,"text":256,"correct":22},"综合总费用法",{"key":31,"text":258,"correct":22},"年折算费用法",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},909304,"在项目盈亏平衡点的多种表达形式中，应用最为广泛的是以（ ）表示的盈亏平衡点。",[263,265,267,269],{"key":20,"text":264,"correct":29},"产量和生产能力利用率",{"key":24,"text":266,"correct":22},"产量和单价",{"key":27,"text":268,"correct":22},"可变成本和固定成本",{"key":31,"text":270,"correct":22},"单价和生产能力利用率",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},909305,"在评价投资方案经济效果时，如果 A、B两个方案中缺少任何一个，另一个就不能正常运行，则 A、B两方案称为（）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"组合型",{"key":24,"text":278,"correct":29},"互补型",{"key":27,"text":280,"correct":22},"混合型",{"key":31,"text":282,"correct":22},"相关型",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},909306,"下列投资方案经济效果评价指标中，能够在一定程度上反映资本周转速度的指标是（ ）",[287,288,289,290],{"key":20,"text":91,"correct":22},{"key":24,"text":217,"correct":22},{"key":27,"text":221,"correct":22},{"key":31,"text":291,"correct":29},"投资回收期",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":31,"analysis":33},909307,"下列关于投资收益率的表述中正确的是（）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"用投资收益率进行方案评价时，方案可行的条件是投资收益率非负",{"key":24,"text":299,"correct":22},"总投资收益率是项目达到设计生产能力后正常年份的年净利润与项目总投资的比值",{"key":27,"text":301,"correct":22},"资本金净利润率是项目达到设计生产能力后正常年份年息税前利润与项目资本金的比值",{"key":31,"text":303,"correct":29},"鉴于投资收益率主观性比较强，以投资收益率指标作为主要的决策依据不太可靠",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":27,"analysis":33},909308,"某建设项目以财务净现值为指标进行敏感性分析的有关数据见下表。 则该建设项目投资额变化幅度的临界点是（）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"+8.13％",{"key":24,"text":311,"correct":22},"+10.54％",{"key":27,"text":313,"correct":29},"+12.31％",{"key":31,"text":315,"correct":22},"+16.37％",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},909309,"进行投资方案敏感性分析的目的是（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"分析不确定因素在未来发生变动的概率",{"key":24,"text":323,"correct":22},"说明不确定因素在未来发生变动的范围",{"key":27,"text":325,"correct":22},"度量不确定因素对投资效果的影响程度",{"key":31,"text":327,"correct":29},"揭示不确定因素的变动对投资效果的影响",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":27,"analysis":33},909310,"甲、乙两个建设方案的现金流量如下表，已知基准收益率为10％，(P／ A，10％，6)=4.355，(P／ A，10％，3)=2.487，则最佳方案为（）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"采用净现值法，NPV甲=306.5万元，NPV乙=43.5万元，甲方案最佳",{"key":24,"text":335,"correct":22},"采用最小公倍数法，NPV甲=306.5万元，NPV乙=443.5万元，乙方案最佳",{"key":27,"text":337,"correct":29},"采用年值法，NAV甲=70.38万元，NAV乙=17.49万元，甲方案最佳",{"key":31,"text":339,"correct":22},"采用研究期数法，NPV甲=175.03万元，NPV乙=253.67万元，乙方案最佳",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},909311,"互斥方案经济评价中，属于静态评价方法的指标是（ ）。",[344,345,347,349],{"key":20,"text":199,"correct":29},{"key":24,"text":346,"correct":22},"增量内部收益率",{"key":27,"text":348,"correct":22},"净现值",{"key":31,"text":350,"correct":22},"净年值",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":20,"analysis":33},909312,"采用敏感性分析法进行投资方案不确定性分析的优点是能够（ ）。",[355,357,359,361],{"key":20,"text":356,"correct":29},"一定程度上定量描述不确定因素的变动对项目投资效果的影响",{"key":24,"text":358,"correct":22},"无法搞清项目对不确定因素的不利变动所能容许的风险程度",{"key":27,"text":360,"correct":22},"考虑不确定因素在未来发生变动的概率",{"key":31,"text":362,"correct":22},"可明确说明不确定因素发生变动的情况的可能性大小",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":31,"analysis":33},909313,"采用投资收益率指标评价投资方案经济效果的缺点是（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":22},"考虑了投资收益的时间因素，因而使指标计算较复杂",{"key":24,"text":370,"correct":22},"虽在一定程度上反映了投资效果的优劣，但仅适用于投资规模大的复杂工程",{"key":27,"text":372,"correct":22},"只能考虑正常生产年份的投资收益，不能全面考虑整个计算期的投资收益",{"key":31,"text":374,"correct":29},"正常生产年份的选择比较困难，因而使指标计算的主观随意性较大",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},909314,"对于非国家投资的项目而言，投资者在确定基准收益率时考虑的因素很多，但其基础因素为（）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"资金限制和投资风险",{"key":24,"text":382,"correct":29},"资金成本和机会成本",{"key":27,"text":384,"correct":22},"目标利润和投资风险",{"key":31,"text":386,"correct":22},"目标利润和通货膨胀",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},909315,"对于寿命期不同的互斥方案进行经济评价时，可以采用的动态评价方法是（）。",[391,393,395,397],{"key":20,"text":392,"correct":22},"增量投资收益率法和增量投资回收期法",{"key":24,"text":394,"correct":29},"研究期法和增量内部收益率法",{"key":27,"text":396,"correct":22},"净现值法和内部收益率法",{"key":31,"text":398,"correct":22},"净现值率法和内部收益率法",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},909316,"甲、乙两个方案的现金流量见下表，则两个方案的增量投资回收期为（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"5.67年",{"key":24,"text":406,"correct":29},"4年",{"key":27,"text":408,"correct":22},"4.5年",{"key":31,"text":410,"correct":22},"7年",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":31,"analysis":33},909317,"下列关于互斥方案经济效果评价方法的表述中，正确的是（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":22},"在对寿命不等的互斥方案进行比选时，净现值法是最为简便的方法",{"key":24,"text":418,"correct":22},"采用研究期法时不需要考虑研究期以后的现金流量情况",{"key":27,"text":420,"correct":22},"最小公倍数法适用于某些不可再生资源开发型项目",{"key":31,"text":422,"correct":29},"方案重复法是以各备选方案计算期的最小公倍数作为比选方案的共同计算期",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},909318,"（ ）时，投资额大的方案可行，投资的增量完全可以由经营成本的节约来得到补偿。",[427,429,431,433],{"key":20,"text":428,"correct":22},"增量投资收益率小于基准投资收益率",{"key":24,"text":430,"correct":22},"增量投资收益率等于基准投资收益率",{"key":27,"text":432,"correct":22},"增量投资收益率小于或等于基准投资收益率时",{"key":31,"text":434,"correct":29},"增量投资收益率大于基准投资收益率时",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":31,"analysis":33},909321,"以生产能力利用率表示的项目盈亏平衡点越低，表明项目建成投产后的（）越小。",[439,441,442,443],{"key":20,"text":440,"correct":22},"盈利的可能性",{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":22},{"key":31,"text":81,"correct":29},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":24,"analysis":33},909322,"某项目有甲、乙、丙三个投资方案，各方案的投资额及内部收益率见下表。若已知基准折现率为10％，则各方案净现值由大到小排序为（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"甲，乙，丙",{"key":24,"text":451,"correct":29},"乙，甲，丙",{"key":27,"text":453,"correct":22},"乙，丙，甲",{"key":31,"text":455,"correct":22},"丙，乙，甲",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},909323,"在计算期不同的互斥方案经济效果的评价中，净现值(NPV)法常用的两种方法是（）。",[460,462,464,466],{"key":20,"text":461,"correct":29},"最小公倍数法、研究期法",{"key":24,"text":463,"correct":22},"最大公约数法、无限计算期法",{"key":27,"text":465,"correct":22},"最小公倍数法、无限计算期法",{"key":31,"text":467,"correct":22},"研究期法、无限计算期法",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},909324,"某项目设计生产能力为50万件产品，预计单位产品价格为100元，单位产品可变成本为70元，年固定成本为400万元。若该产品的销售税金及附加的合并税率为5％，则用生产能力利用率和单位产品价格表示的项目盈亏平衡点为（）。",[472,474,476,478],{"key":20,"text":473,"correct":29},"32％和82.11元",{"key":24,"text":475,"correct":22},"32％和82元",{"key":27,"text":477,"correct":22},"16％和82.11元",{"key":31,"text":479,"correct":22},"16％和82元",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":31,"analysis":33},909325,"某项目各年净现金流量如下表。设基准收益率为10％，则该项目的财务净现值和静态投资回收期分别为（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":22},"32.02万元，3.2年",{"key":24,"text":487,"correct":22},"32.02万元，4.2年",{"key":27,"text":489,"correct":22},"29.54万元，4.2年",{"key":31,"text":491,"correct":29},"29.54万元，3.2年",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":27,"analysis":33},909326,"采用增量投资内部收益率(△IRR)法比选计算期相同的两个可行互斥方案时，基准收益率为ic，则保留投资额大的方案的前提条件是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"△IRR>0",{"key":24,"text":499,"correct":22},"△IRR\u003C0",{"key":27,"text":501,"correct":29},"△IRR>ic",{"key":31,"text":503,"correct":22},"△IRR\u003Cic",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},909327,"采用增量投资内部收益率(△IRR)法比选计算期不同的互斥方案时，对于已通过绝对效果检验的投资方案，确定优选方案的准则是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"△IRR大于基准收益率时，选择初始投资额小的方案",{"key":24,"text":511,"correct":29},"△IRR大于基准收益率时，选择初始投资额大的方案",{"key":27,"text":513,"correct":22},"无论△IRR是否大于基准收益率，均选择初始投资额小的方案",{"key":31,"text":515,"correct":22},"无论△IRR是否大于基准收益率，均选择初始投资额大的方案",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":518,"answer":27,"analysis":33},909328,[519,520,521,522],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":22},{"key":27,"text":103,"correct":29},{"key":31,"text":105,"correct":22},{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},909329,"某技术方案固定资产投资为4800万元，流动资金为200万元，该技术方案投产期年利润总额为800万元，达到设计生产能力后正常年份的年息税前利润为1200万元，则该技术方案正常年份的总投资收益率为( )。",[527,529,531,533],{"key":20,"text":528,"correct":22},"16%",{"key":24,"text":530,"correct":22},"18%",{"key":27,"text":532,"correct":29},"24%",{"key":31,"text":534,"correct":22},"25%",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},909330,"某方案的现金流量表如下，基准收益率为8％，计算动态回收期和净年值为（）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"3年，132万元",{"key":24,"text":542,"correct":29},"3.21年，82.69万元",{"key":27,"text":544,"correct":22},"3.21年，89.97万元",{"key":31,"text":546,"correct":22},"3年，82.69万元",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},909331,"某项目有4种方案，各方案的投资、现金流量及有关评价指标见下表。若已知基准收益率为18％，则经比较最优的方案为（）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"方案A",{"key":24,"text":554,"correct":22},"方案B",{"key":27,"text":556,"correct":22},"方案C",{"key":31,"text":558,"correct":29},"方案D",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},909332,"某投资方案建设期为2年，建设期内每年年初投资400万元，运营期每年年末净收益为150万元。若基准收益率为12％，运营期为18年，残值为零，并已知(P／ A，12％，18)=7.2497，则该投资方案的净现值和静态投资回收期分别为（）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"213.80万元和7.33年",{"key":24,"text":566,"correct":22},"213.80万元和6.33年",{"key":27,"text":568,"correct":29},"109.77万元和7.33年",{"key":31,"text":570,"correct":22},"109.77万元和6.33年",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},909333,"进行投资方案不确定性分析的优点是能够（）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"揭示产生项目风险的根源",{"key":24,"text":578,"correct":29},"度量项目风险的大小",{"key":27,"text":580,"correct":22},"投资项目风险的降低途径",{"key":31,"text":582,"correct":22},"说明不确定因素的变化情况",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},909334,"某项目期初投资额为2000万元，从第一年末开始每年净收益480万元。若基准收益率为10％，并已知(P／ A，10％，5)=3.7908和(P／ A，10％，6)=4.3553，则该项目的静态投资回收期和动态投资回收期分别为（ ）年。",[587,589,591,593],{"key":20,"text":588,"correct":22},"4.17和5.33",{"key":24,"text":590,"correct":29},"4.17和5.67",{"key":27,"text":592,"correct":22},"4.83和5.33",{"key":31,"text":594,"correct":22},"4.83和5.67",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":20,"analysis":33},909335,"关于财务内部收益率的说法，正确的是（）。",[599,601,603,605],{"key":20,"text":600,"correct":29},"财务内部收益率大于基准收益率时，技术方案在经济上可以接受",{"key":24,"text":602,"correct":22},"财务内部收益率是一个事先确定的基准折现率",{"key":27,"text":604,"correct":22},"财务内部收益率受项目外部参数的影响较大",{"key":31,"text":606,"correct":22},"独立方案用财务内部收益率评价与财务净现值评价，结论通常不一致",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]