[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":572},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,22,50,2821,[13,34,44,56,68,77,89,101,113,125,137,149,159,171,183,193,205,217,229,241,253,264,273,285,297,309,321,333,345,357,368,377,389,401,413,423,431,442,453,464,476,487,495,507,517,529,539,548,555,564],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},909128,1,"单选题","根据《建筑施工组织设计规范》，单位工程施工组织设计应由（ ）主持编制。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","建设单位项目负责人",false,{"key":24,"text":25,"correct":26},"B","施工项目负责人",true,{"key":28,"text":29,"correct":22},"C","施工单位技术负责人",{"key":31,"text":32,"correct":22},"D","施工项目技术负责人","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},909129,"根据《建筑施工组织设计规范》GB 50502--2009，施工组织总设计应由（ ）主持编制。",[38,40,41,43],{"key":20,"text":39,"correct":22},"总承包单位技术负责人",{"key":24,"text":25,"correct":26},{"key":28,"text":42,"correct":22},"总承包单位法定代表人",{"key":31,"text":32,"correct":22},{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":20,"analysis":33},909130,"下列工程项目目标控制方法中，控制的原理基本相同、目的也相同的是（ ）。",[48,50,52,54],{"key":20,"text":49,"correct":26},"香蕉曲线法和S曲线法",{"key":24,"text":51,"correct":22},"网络计划法和香蕉曲线法",{"key":28,"text":53,"correct":22},"排列图法和网络计划法",{"key":31,"text":55,"correct":22},"S曲线法和排列图法",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":28,"analysis":33},909131,"下列工程项目目标控制方法中，可用来找出工程质量主要影响因素的是（ ）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"直方图法",{"key":24,"text":63,"correct":22},"鱼刺图法",{"key":28,"text":65,"correct":26},"排列图法",{"key":31,"text":67,"correct":22},"S曲线法",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":20,"analysis":33},909132,"下列工程项目目标控制方法中，可用来掌握产品质量波动情况及质量特征的分布规律，以便对质量状况进行分析判断的是（ ）。",[72,73,74,76],{"key":20,"text":61,"correct":26},{"key":24,"text":63,"correct":22},{"key":28,"text":75,"correct":22},"控制图法",{"key":31,"text":67,"correct":22},{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":31,"analysis":33},909133,"（ ）是编制施工总进度计划的前提。",[81,83,85,87],{"key":20,"text":82,"correct":22},"总体施工准备",{"key":24,"text":84,"correct":22},"主要施工方法",{"key":28,"text":86,"correct":22},"施工总平面布置",{"key":31,"text":88,"correct":26},"总体施工部署",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":31,"analysis":33},909134,"不需要专家论证的专项方案，经施工单位审核合格后报监理单位，由项目（ ）审核签字。",[93,95,97,99],{"key":20,"text":94,"correct":22},"工程技术人员",{"key":24,"text":96,"correct":22},"安全总监",{"key":28,"text":98,"correct":22},"总工程师",{"key":31,"text":100,"correct":26},"总监理工程师",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":28,"analysis":33},909135,"下列关于工程项目目标控制方法的表述中正确的是（）",[105,107,109,111],{"key":20,"text":106,"correct":22},"直方图是一种用来寻找影响工程质量主要因素的有效工具",{"key":24,"text":108,"correct":22},"通过因果分析图，可以发现工程项目中的主要质量问题",{"key":28,"text":110,"correct":26},"S曲线与香蕉曲线都可以用来控制工程造价和工程进度",{"key":31,"text":112,"correct":22},"控制图法和直方图法分别属于质量控制的静态和动态分析方法",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":20,"analysis":33},909136,"下列工程项目计划表中，用来阐明各单位工程的建设规模、投资额、新增固定资产、新增生产能力等建设总规模及本年计划完成情况的是（ ）。",[117,119,121,123],{"key":20,"text":118,"correct":26},"年度竣工投产交付使用计划表",{"key":24,"text":120,"correct":22},"年度计划项目表",{"key":28,"text":122,"correct":22},"年度建设资金平衡表",{"key":31,"text":124,"correct":22},"按资产计划年度分配表",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":31,"analysis":33},909137,"属于项目管理实施规划主要内容的是（ ）。",[129,131,133,135],{"key":20,"text":130,"correct":22},"项目安全生产管理",{"key":24,"text":132,"correct":22},"项目信息管理",{"key":28,"text":134,"correct":22},"项目沟通与相关方管理",{"key":31,"text":136,"correct":26},"设计与技术措施",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":24,"analysis":33},909138,"在工程项目的计划与控制中，对工程项目从开始建设至竣工投产全过程的统一部署指的是（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"工程项目前期工作计划",{"key":24,"text":144,"correct":26},"工程项目建设总进度计划",{"key":28,"text":146,"correct":22},"工程项目年度计划",{"key":31,"text":148,"correct":22},"工程项目后期工作总结",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":28,"analysis":33},909139,"项目管理实施规划是在开工之前由（ ）编制，并报企业管理层审批的工程项目管理文件。",[153,155,156,158],{"key":20,"text":154,"correct":22},"建设单位负责人",{"key":24,"text":29,"correct":22},{"key":28,"text":157,"correct":26},"施工项目经理",{"key":31,"text":100,"correct":22},{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":24,"analysis":33},909140,"与施工组织总设计比较，单位工程施工组织设计中工程概况增加了（）。",[163,165,167,169],{"key":20,"text":164,"correct":22},"工程主要情况",{"key":24,"text":166,"correct":26},"各专业设计简介",{"key":28,"text":168,"correct":22},"工程施工条件",{"key":31,"text":170,"correct":22},"施工部署",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":24,"analysis":33},909141,"下列属于施工方案的施工方法及工艺要求内容的是（）。",[175,177,179,181],{"key":20,"text":176,"correct":22},"工程施工顺序及施工流水段",{"key":24,"text":178,"correct":26},"根据施工地点的气候条件，对季节性施工提出具体要求",{"key":28,"text":180,"correct":22},"工程施工的重点和难点分析",{"key":31,"text":182,"correct":22},"工程材料和设备配置计划",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":28,"analysis":33},909142,"下列进度计划表中，用来确定年度施工项目的投资额和年末形象进度，并阐明建设条件落实情况的是（ ）。",[187,189,190,191],{"key":20,"text":188,"correct":22},"投资计划年度分配表",{"key":24,"text":122,"correct":22},{"key":28,"text":120,"correct":26},{"key":31,"text":192,"correct":22},"工程项目进度平衡表",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":28,"analysis":33},909143,"下列建设工程项目目标控制措施中，属于被动控制措施的是（ ）。",[197,199,201,203],{"key":20,"text":198,"correct":22},"调查分析外部环境条件",{"key":24,"text":200,"correct":22},"揭示目标实现和计划实施的影响因素",{"key":28,"text":202,"correct":26},"及时反馈计划执行的偏差程度",{"key":31,"text":204,"correct":22},"落实目标控制的任务和管理职能",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},909144,"属于项目管理规划大纲主要内容的是（ ）。",[209,211,213,215],{"key":20,"text":210,"correct":26},"项目概况",{"key":24,"text":212,"correct":22},"组织方案",{"key":28,"text":214,"correct":22},"项目管理方式",{"key":31,"text":216,"correct":22},"进度计划",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":28,"analysis":33},909145,"下列控制措施中属于主动控制措施的是（ ）。",[221,223,225,227],{"key":20,"text":222,"correct":22},"采用科学手段定期检查工程实施过程",{"key":24,"text":224,"correct":22},"依据合同合理确定工程索赔费用",{"key":28,"text":226,"correct":26},"应用科学方法制订计划",{"key":31,"text":228,"correct":22},"根据工程实施情况及时纠正偏差",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},909146,"根据《建筑施工组织设计规范》GB\u002FT 50502--2009，按编制对象不同，施工组织设计的三个层次是指（ ）。",[233,235,237,239],{"key":20,"text":234,"correct":22},"施工总平面图、施工总进度计划和资源需求计划",{"key":24,"text":236,"correct":26},"施工组织总设计、单位工程施工组织设计和施工方案",{"key":28,"text":238,"correct":22},"施工总平面图、施工总进度计划和专项施工方案",{"key":31,"text":240,"correct":22},"施工组织总设计、单位工程施工进度计划和施工作业计划",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":28,"analysis":33},909147,"对于超过一定规模的危险性较大的分部分项工程专项方案，应当由（ ）组织召开专家论证会。",[245,247,249,251],{"key":20,"text":246,"correct":22},"建设单位",{"key":24,"text":248,"correct":22},"监理单位",{"key":28,"text":250,"correct":26},"施工单位",{"key":31,"text":252,"correct":22},"建设行政主管部门",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":24,"analysis":33},909148,"下列进度计划表中，用来明确各种设计文件交付日期、主要设备交货日期，施工单位进场日期，水电及道路接通日期的是（ ）。",[257,259,260,262],{"key":20,"text":258,"correct":22},"工程项目总进度计划表",{"key":24,"text":192,"correct":26},{"key":28,"text":261,"correct":22},"工程项目施工总进度表",{"key":31,"text":263,"correct":22},"单位工程总进度计划表",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":28,"analysis":33},909149,"根据国家有关规定，超过一定规模的危险性较大的分部分项工程专项施工方案应当由（）组织召开专家论证会。",[268,269,270,271],{"key":20,"text":246,"correct":22},{"key":24,"text":248,"correct":22},{"key":28,"text":250,"correct":26},{"key":31,"text":272,"correct":22},"设计单位",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},909150,"下列关于工程项目计划体系的说明，正确的是（）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"建设单位编制的计划体系包括工程项目前期工作计划、工程项目建设规划大纲、工程项目建设实施规划",{"key":24,"text":280,"correct":22},"施工单位的计划体系包括工程项目建设总进度计划和工程项目年度计划",{"key":28,"text":282,"correct":26},"工程项目建设总进度计划是编制工程项目年度计划的依据",{"key":31,"text":284,"correct":22},"投资计划年度分配表属于工程项目年度计划",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},909151,"香蕉曲线法的原理与S曲线法的原理基本相同，其主要区别在于香蕉曲线是以（）为基础绘制的。",[289,291,293,295],{"key":20,"text":290,"correct":22},"横道图",{"key":24,"text":292,"correct":26},"工程网络计划",{"key":28,"text":294,"correct":22},"直方图",{"key":31,"text":296,"correct":22},"排列图",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},909152,"施工方案技术准备工作应包括（）。",[301,303,305,307],{"key":20,"text":302,"correct":26},"试验检验和调试工作计划",{"key":24,"text":304,"correct":22},"资金使用计划",{"key":28,"text":306,"correct":22},"临时用水计划",{"key":31,"text":308,"correct":22},"编写施工方案",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},909153,"下列控制措施中，属于工程项目目标主动控制措施的是（）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"跟踪目标实施情况，发现目标偏离时及时采取纠偏措施",{"key":24,"text":316,"correct":22},"明确项目管理组织中过程控制人员的职责，发现情况及时采取措施进行处理",{"key":28,"text":318,"correct":26},"制订必要的备用方案，以应对可能出现的影响目标实现的情况",{"key":31,"text":320,"correct":22},"建立有效的信息反馈系统，及时反馈偏离计划目标值的情况，以便及时采取措施予以纠正",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},909154,"下列属于流水施工参数中工艺参数的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":26},"施工过程",{"key":24,"text":328,"correct":22},"工作面",{"key":28,"text":330,"correct":22},"施工段",{"key":31,"text":332,"correct":22},"流水节拍",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},909155,"建设工程组织流水施工时，相邻专业工作队之间的流水步距不尽相等，但专业工作队数等于施工过程数的流水施工方式是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"固定节拍流水施工和加快的成倍节拍流水施工",{"key":24,"text":340,"correct":22},"加快的成倍节拍流水施工和非节奏流水施工",{"key":28,"text":342,"correct":22},"成倍节拍流水施工和一般的成倍节拍流水施工",{"key":31,"text":344,"correct":26},"异步距异节奏流水施工和非节奏流水施工",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},909156,"下列流水施工参数中，均属于时间参数的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":26},"流水节拍和流水步距",{"key":24,"text":352,"correct":22},"流水步距和流水强度",{"key":28,"text":354,"correct":22},"流水强度和流水段",{"key":31,"text":356,"correct":22},"流水段和流水节拍",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":28,"analysis":33},909157,"下列流水施工参数中，属于空间参数的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"施工过程和流水强度",{"key":24,"text":364,"correct":22},"工作面和流水步距",{"key":28,"text":366,"correct":26},"施工段和工作面",{"key":31,"text":354,"correct":22},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},909158,"在组织建设工程流水施工时，用来表达流水施工在空间布置上开展状态的参数是（ ）。",[372,373,374,376],{"key":20,"text":332,"correct":22},{"key":24,"text":330,"correct":26},{"key":28,"text":375,"correct":22},"流水强度",{"key":31,"text":326,"correct":22},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},909159,"某工程分为 A、 B、C三个工艺过程，按五个施工段顺序组织施工，各工艺过程在各段持续时间均为7天， B、C工艺之间可搭接2天。实际施工中，B过程在第二段延误3天，则实际流水施工工期应为（ ）天。",[381,383,385,387],{"key":20,"text":382,"correct":22},"47",{"key":24,"text":384,"correct":22},"49",{"key":28,"text":386,"correct":22},"51",{"key":31,"text":388,"correct":26},"50",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},909160,"某分部工程划分为3个施工过程、4个施工段组织流水施工，流水节拍分别为3、5、4、4天，4、4、3、4天和3、4、2、3天，则其流水施工工期为（ ）天。",[393,395,397,399],{"key":20,"text":394,"correct":22},"19",{"key":24,"text":396,"correct":22},"20",{"key":28,"text":398,"correct":22},"21",{"key":31,"text":400,"correct":26},"23",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},909161,"某分部工程划分为4个施工过程、3个施工段，组织加快的成倍节拍流水施工，如果流水节拍分别为6、4、4、2天，则流水步距为（ ）天。",[405,407,409,411],{"key":20,"text":406,"correct":22},"1",{"key":24,"text":408,"correct":26},"2",{"key":28,"text":410,"correct":22},"4",{"key":31,"text":412,"correct":22},"6",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},909162,"某分部工程划分为3个施工过程、4个施工段，组织加快的成倍节拍流水施工，流水节拍分别为6、4、4天，则专业工作队数为（ ）个。",[417,419,420,421],{"key":20,"text":418,"correct":22},"3",{"key":24,"text":410,"correct":22},{"key":28,"text":412,"correct":22},{"key":31,"text":422,"correct":26},"7",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},909163,"某分部工程划分为4个施工段，组织加快的成倍节拍流水施工，如果流水节拍分别为6、4、4、2天，流水步距为（ ）天。",[427,428,429,430],{"key":20,"text":406,"correct":22},{"key":24,"text":408,"correct":26},{"key":28,"text":410,"correct":22},{"key":31,"text":412,"correct":22},{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":28,"analysis":33},909164,"某工程按全等节拍流水组织施工，共分4道施工工序，3个施工段，估计工期为72天，则其流水节拍应为（ ）天。",[435,436,438,440],{"key":20,"text":412,"correct":22},{"key":24,"text":437,"correct":22},"9",{"key":28,"text":439,"correct":26},"12",{"key":31,"text":441,"correct":22},"18",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},909165,"某工程组织成倍节拍流水施工，4个施工段，4个施工过程的流水节拍分别为5，10，10，15，则该工程的流水工期为（ ）天。",[446,447,449,451],{"key":20,"text":388,"correct":22},{"key":24,"text":448,"correct":26},"55",{"key":28,"text":450,"correct":22},"60",{"key":31,"text":452,"correct":22},"70",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},909166,"某工程划分为3个施工过程、4个施工段组织流水施工，流水节拍见下表，则该工程流水施工工期为（ ）天。",[457,459,460,462],{"key":20,"text":458,"correct":22},"22",{"key":24,"text":400,"correct":22},{"key":28,"text":461,"correct":22},"26",{"key":31,"text":463,"correct":26},"27",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},909167,"某工程划分为3个施工过程、4个施工段组织固定节拍流水施工，流水节拍为5天，累计间歇时间为2天，累计提前插入时间为3天，该工程流水施工工期为（ ）天。",[468,470,472,474],{"key":20,"text":469,"correct":26},"29",{"key":24,"text":471,"correct":22},"30",{"key":28,"text":473,"correct":22},"34",{"key":31,"text":475,"correct":22},"35",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":31,"analysis":33},909168,"建设工程组织流水施工时，某施工过程（专业工作队）在单位时间内完成的工程量称为（ ）。",[480,481,483,485],{"key":20,"text":332,"correct":22},{"key":24,"text":482,"correct":22},"流水步距",{"key":28,"text":484,"correct":22},"流水节奏",{"key":31,"text":486,"correct":26},"流水能力",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},909169,"某工程划分为3个施工过程，4个施工段组织加快的成倍节拍流水施工，流水节拍分别为4天、6天和4天，则需要派出（ ）个专业工作队。",[491,492,493,494],{"key":20,"text":422,"correct":26},{"key":24,"text":412,"correct":22},{"key":28,"text":410,"correct":22},{"key":31,"text":418,"correct":22},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":31,"analysis":33},909170,"工程项目组织非节奏流水施工的特点是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"相邻施工过程的流水步距相等",{"key":24,"text":502,"correct":22},"各施工段上的流水节拍相等",{"key":28,"text":504,"correct":22},"施工段之间没有空闲时间",{"key":31,"text":506,"correct":26},"专业工作队数等于施工过程数",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},909171,"某项目组成甲、乙、丙、丁共4个专业队在5个施工段上进行无节奏流水施工，各队的流水节拍分别是：甲队为3、5、3、2、2周，乙队为2、3、1、4、5周，丙队为4、1、3、2、5周，丁队为5、3、4、2、1周，该项目总工期为（）周。",[511,513,514,515],{"key":20,"text":512,"correct":26},"31",{"key":24,"text":471,"correct":22},{"key":28,"text":461,"correct":22},{"key":31,"text":516,"correct":22},"24",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},909172,"下列各项中，属于等步距异节奏流水施工的特点的是（）。",[521,523,525,527],{"key":20,"text":522,"correct":26},"相邻施工过程的流水步距相等，且等于流水节拍的最大公约数",{"key":24,"text":524,"correct":22},"同一施工过程在各个施工段上的流水节拍不等",{"key":28,"text":526,"correct":22},"施工过程数大于专业工作队数",{"key":31,"text":528,"correct":22},"施工段之间允许存在空闲时间",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},909173,"下列对于固定节拍流水施工描述错误的是（ ）。",[533,535,537,538],{"key":20,"text":534,"correct":22},"所有施工过程在各个施工段上的流水节拍均相等",{"key":24,"text":536,"correct":26},"相邻施工过程的流水步距不等",{"key":28,"text":506,"correct":22},{"key":31,"text":504,"correct":22},{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":31,"analysis":33},909176,"某工程划分为3个施工过程、4个施工段，组织加快的成倍节拍流水施工，流水节拍分别为4天、4天和2天，则应派（ ）个专业工作队参与施工。",[543,544,545,546],{"key":20,"text":408,"correct":22},{"key":24,"text":418,"correct":22},{"key":28,"text":410,"correct":22},{"key":31,"text":547,"correct":26},"5",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":550,"answer":31,"analysis":33},909177,[551,552,553,554],{"key":20,"text":458,"correct":22},{"key":24,"text":400,"correct":22},{"key":28,"text":461,"correct":22},{"key":31,"text":463,"correct":26},{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},909179,"在组织流水施工时，某个专业工作队在一个施工段上的施工时间称为（ ）。",[559,561,562,563],{"key":20,"text":560,"correct":22},"流水施工工期",{"key":24,"text":332,"correct":26},{"key":28,"text":482,"correct":22},{"key":31,"text":375,"correct":22},{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":31,"analysis":33},909180,"建设工程组织流水施工时，某施工过程(专业工作队)在单位时间内完成的工程量称为（ ）。",[568,569,570,571],{"key":20,"text":332,"correct":22},{"key":24,"text":482,"correct":22},{"key":28,"text":484,"correct":22},{"key":31,"text":486,"correct":26},[573,576,579,582,585,588],{"id":15,"name":574,"category":7,"favorite":575},"领导干部任职前廉政法规知识测试题",92,{"id":577,"name":578,"category":7,"favorite":15},595,"建筑结构与设备",{"id":580,"name":581,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":583,"name":584,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":586,"name":587,"category":7,"favorite":8},534,"BIM工程师",{"id":589,"name":587,"category":7,"favorite":8},535]