[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,21,50,2821,[13,34,46,58,70,80,90,102,114,126,138,150,161,171,183,195,207,215,227,234,241,253,265,277,289,300,312,324,336,348,360,372,384,395,407,419,431,442,454,466,475,487,499,511,520,532,544,555,565,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},909077,1,"单选题","下列关于CM(Construction Management)承包模式的说法中，正确的是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","CM单位直接与分包单位签订分包合同",false,{"key":24,"text":25,"correct":22},"B","CM单位不负责工程分包的发包，与分包单位的合同由建设单位直接签订",{"key":27,"text":28,"correct":29},"C","CM承包模式使工程项目实现有条件的“边设计、边施工”",true,{"key":31,"text":32,"correct":22},"D","快速路径法施工并不适合CM承包模式","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},909078,"项目组织形式中，（ ）是项目经理直接进行单线垂直领导，决策迅速，运用于中小型项目。",[38,40,42,44],{"key":20,"text":39,"correct":29},"直线制",{"key":24,"text":41,"correct":22},"矩阵式",{"key":27,"text":43,"correct":22},"职能制",{"key":31,"text":45,"correct":22},"事业部制",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},909079,"在下列工程项目管理组织机构形式中，有利于管理的专业化的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"直线职能制和直线制",{"key":24,"text":53,"correct":22},"矩阵制和职能制",{"key":27,"text":55,"correct":29},"职能制和直线职能制",{"key":31,"text":57,"correct":22},"矩阵制和直线职能制",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},909080,"下列几种工程项目组织管理模式中，工程造价控制难度较大的模式是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"总分包模式",{"key":24,"text":65,"correct":22},"EPC承包模式",{"key":27,"text":67,"correct":29},"平行承包模式",{"key":31,"text":69,"correct":22},"CM承包模式",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},909081,"在下列工程项目管理组织机构形式中，容易形成多头领导的是（ ）。",[74,75,77,79],{"key":20,"text":51,"correct":22},{"key":24,"text":76,"correct":22},"直线制和职能制",{"key":27,"text":78,"correct":29},"职能制和矩阵制",{"key":31,"text":57,"correct":22},{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":31,"analysis":33},909082,"下列承发包模式中，采用“保证最大工程费加酬金”合同形式的是（ ）。",[84,85,86,88],{"key":20,"text":63,"correct":22},{"key":24,"text":67,"correct":22},{"key":27,"text":87,"correct":22},"代理型CM模式",{"key":31,"text":89,"correct":29},"非代理型CM模式",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":20,"analysis":33},909083,"建设工程采用平行承包模式的特点是（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":29},"有利于缩短建设工期",{"key":24,"text":97,"correct":22},"不利于控制工程质量",{"key":27,"text":99,"correct":22},"业主组织管理简单",{"key":31,"text":101,"correct":22},"工程造价控制难度小",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":31,"analysis":33},909084,"下列关于CM承包模式的表述，不正确的是（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"CM单位以承包商的身份进行施工管理",{"key":24,"text":109,"correct":22},"CM承包模式采用快速路径法施工",{"key":27,"text":111,"correct":22},"CM单位有代理型和非代理型两种",{"key":31,"text":113,"correct":29},"代理型CM采用GMP加酬金的合同形式",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":31,"analysis":33},909085,"直线职能制组织结构的特点是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"信息传递路径较短",{"key":24,"text":121,"correct":22},"容易形成多头领导",{"key":27,"text":123,"correct":22},"各职能部门间横向联系强",{"key":31,"text":125,"correct":29},"各职能部门职责清楚",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},909086,"CM（Construction Management）承包模式的特点是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"建设单位与分包单位直接签订合同",{"key":24,"text":133,"correct":22},"采用流水施工法施工",{"key":27,"text":135,"correct":22},"CM单位可赚取总分包之间的差价",{"key":31,"text":137,"correct":29},"采用快速路径法施工",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":31,"analysis":33},909087,"代理型CM合同由建设单位与分包单位直接签订，一般采用（ ）的合同形式。",[142,144,146,148],{"key":20,"text":143,"correct":22},"固定单价",{"key":24,"text":145,"correct":22},"可调总价",{"key":27,"text":147,"correct":22},"GMP加酬金",{"key":31,"text":149,"correct":29},"简单的成本加酬金",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":27,"analysis":33},909088,"下列工程项目管理组织机构形式中，易于实现统一指挥的是（ ）。",[154,155,157,159],{"key":20,"text":53,"correct":22},{"key":24,"text":156,"correct":22},"职能制和直线制",{"key":27,"text":158,"correct":29},"直线制和直线职能制",{"key":31,"text":160,"correct":22},"直线职能制和矩阵制",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},909089,"下列工程项目组织机构形式中，能够实现集权和分权的有效结合，能够根据任务的实际情况组建和调整组织机构，但稳定性差、其成员容易受双重领导的组织机构是（ ）。",[165,166,167,169],{"key":20,"text":39,"correct":22},{"key":24,"text":43,"correct":22},{"key":27,"text":168,"correct":22},"直线职能制",{"key":31,"text":170,"correct":29},"矩阵制",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":33},909090,"建设工程项目实行代理型CM承包模式时，分包商与业主的合同特点是（ ）。",[175,177,179,181],{"key":20,"text":176,"correct":29},"业主与分包商以简单的成本加酬金",{"key":24,"text":178,"correct":22},"业主与分包商以保证最大工程费用加酬金",{"key":27,"text":180,"correct":22},"CM单位与分包商以简单的成本加酬金",{"key":31,"text":182,"correct":22},"CM单位与分包商以保证最大工程费用加酬金",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":31,"analysis":33},909091,"关于Partnering模式的说法，正确的是（ ）。",[187,189,191,193],{"key":20,"text":188,"correct":22},"Partnering协议是业主与承包商之间的协议",{"key":24,"text":190,"correct":22},"Partnering模式是一种独立存在的承发包模式",{"key":27,"text":192,"correct":22},"Partnering模式特别强调工程参建各方基层人员的参与",{"key":31,"text":194,"correct":29},"Partnering协议不是法律意义上的合同",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":31,"analysis":33},909093,"下列属于矩阵制组织机构特点的是（）。",[199,201,203,205],{"key":20,"text":200,"correct":22},"结构简单、权力集中、易于统一指挥、隶属关系明确",{"key":24,"text":202,"correct":22},"管理人员工作单一，易于提高工作质量",{"key":27,"text":204,"correct":22},"组织机构中各职能部门之间的横向联系差，信息传递路线长，职能部门与指挥部门之间容易产生矛盾",{"key":31,"text":206,"correct":29},"每一个成员都受项目经理和职能部门经理的双重领导",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":31,"analysis":33},909094,"下列承发包模式中，采用“保证最大工程费用加酬金”合同形式的是（）。",[211,212,213,214],{"key":20,"text":63,"correct":22},{"key":24,"text":67,"correct":22},{"key":27,"text":87,"correct":22},{"key":31,"text":89,"correct":29},{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":24,"analysis":33},909095,"下列关于项目管理承包(PM C)说法正确的是（）。",[219,221,223,225],{"key":20,"text":220,"correct":22},"项目管理承包商代表业主进行项目管理，同时还承担部分工程的设计、采购、施工(EP工作。这对项目管理承包商而言，风险低，相应的利润、回报较高",{"key":24,"text":222,"correct":29},"项目管理承包商作为业主顾问，对项目进行监督和检查，并及时向业主报告工程进展情况。这对项目管理承包商而言，风险最低，接近于零，但回报也低",{"key":27,"text":224,"correct":22},"项目管理承包商作为业主项目管理的延伸，只是管理EPC承包商而不承担任何EPC工作。这对项目管理承包商而言，风险较高，回报较低",{"key":31,"text":226,"correct":22},"以上说法均不正确",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":229,"answer":31,"analysis":33},909096,[230,231,232,233],{"key":20,"text":188,"correct":22},{"key":24,"text":190,"correct":22},{"key":27,"text":192,"correct":22},{"key":31,"text":194,"correct":29},{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":236,"answer":31,"analysis":33},909097,[237,238,239,240],{"key":20,"text":143,"correct":22},{"key":24,"text":145,"correct":22},{"key":27,"text":147,"correct":22},{"key":31,"text":149,"correct":29},{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":27,"analysis":33},909098,"工程项目管理组织机构采用直线制形式的主要优点是（ ）。",[245,247,249,251],{"key":20,"text":246,"correct":22},"管理业务专门化，易提高工作质量",{"key":24,"text":248,"correct":22},"部门间横向联系强，管理效率高",{"key":27,"text":250,"correct":29},"隶属关系明确，易实现统一指挥",{"key":31,"text":252,"correct":22},"集权与分权结合，管理机构灵活",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":31,"analysis":33},909099,"下列关于工程代建制的说法中，正确的是（）。",[257,259,261,263],{"key":20,"text":258,"correct":22},"工程代建制是一种针对经营性政府投资项目的建设实施组织方式",{"key":24,"text":260,"correct":22},"工程代建单位参与工程项目前期的策划决策和建成后的经营管理",{"key":27,"text":262,"correct":22},"在项目建设期间，工程代建单位存在经营性亏损或盈利",{"key":31,"text":264,"correct":29},"工程代建制由专业化的工程项目管理单位作为代建单位",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":31,"analysis":33},909100,"编制单位工程施工进度计划时，确定工作项目持续时间需要考虑每班工人数量。限定每班工人数量上限的因素是（ ）。",[269,271,273,275],{"key":20,"text":270,"correct":22},"工作项目工程量",{"key":24,"text":272,"correct":22},"最小劳动组合",{"key":27,"text":274,"correct":22},"人工产量定额",{"key":31,"text":276,"correct":29},"最小工作面",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":27,"analysis":33},909101,"对于超过一定规模的危险性较大的分部分项工程专项方案，应当由（ ）组织召开专家论证会。",[281,283,285,287],{"key":20,"text":282,"correct":22},"建设单位",{"key":24,"text":284,"correct":22},"监理单位",{"key":27,"text":286,"correct":29},"施工单位",{"key":31,"text":288,"correct":22},"建设行政主管部门",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":24,"analysis":33},909102,"下列项目管理组织机构形式中，未明确项目经理角色的是（ ）组织机构。",[293,294,296,298],{"key":20,"text":43,"correct":22},{"key":24,"text":295,"correct":29},"弱矩阵制",{"key":27,"text":297,"correct":22},"平衡矩阵制",{"key":31,"text":299,"correct":22},"强矩阵制",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":24,"analysis":33},909103,"根据《建筑工程施工组织设计规范》GB\u002FT 50502—2009，按编制对象不同，施工组织设计的三个层次是指（ ）。",[304,306,308,310],{"key":20,"text":305,"correct":22},"施工总平面图，施工总进度计划和资源需求计划",{"key":24,"text":307,"correct":29},"施工组织总设计，单位工程施工组织设计和施工方案",{"key":27,"text":309,"correct":22},"施工总平面图，施工总进度计划和专项施工方案",{"key":31,"text":311,"correct":22},"施工组织总设计、单位工程施工进度计划和分部分项工程作业计划",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":27,"analysis":33},909104,"下列措施中属于被动控制措施的是（ ）。",[316,318,320,322],{"key":20,"text":317,"correct":22},"编制计划的时候留有余地",{"key":24,"text":319,"correct":22},"进行风险识别和风险评价",{"key":27,"text":321,"correct":29},"根据偏差采取相应纠偏措施",{"key":31,"text":323,"correct":22},"制定必要的备用方案",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":27,"analysis":33},909105,"下列关于工程项目计划体系的说明，正确的是（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":22},"建设单位编制的计划体系包括工程项目前期工作计划、工程项目建设规划大纲、工程项目建设实施规划",{"key":24,"text":331,"correct":22},"施工单位的计划体系包括工程项目建设总进度计划和工程项目年度计划",{"key":27,"text":333,"correct":29},"工程项目建设总进度计划是编报工程建设年度计划的依据",{"key":31,"text":335,"correct":22},"投资计划年度分配表属于工程项目年度计划",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":20,"analysis":33},909106,"用来分析工程质量主要影响因素的方法是（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":29},"排列图法",{"key":24,"text":343,"correct":22},"责任图法",{"key":27,"text":345,"correct":22},"直方图法",{"key":31,"text":347,"correct":22},"控制图法",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},909107,"单位工程施工进度计划的编制工作包括：①计算工程量，②划分工作项目，③确定施工顺序，④计算劳动量和机械台班数，正确的程序是（ ）。",[352,354,356,358],{"key":20,"text":353,"correct":22},"①—②—③—④",{"key":24,"text":355,"correct":29},"②—③—①—④",{"key":27,"text":357,"correct":22},"①—③—②—④",{"key":31,"text":359,"correct":22},"①—④—③—②",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},909108,"根据《建筑施工组织设计规范》GB50502，施工组织设计（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":29},"施工组织总设计、单位工程施工组织设计和施工方案",{"key":24,"text":367,"correct":22},"施工组织总设计、单位工程施工组织设计",{"key":27,"text":369,"correct":22},"单位工程施工组织设计和施工方案",{"key":31,"text":371,"correct":22},"施工组织总设计和施工方案",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":31,"analysis":33},909109,"作为施工承包单位计划体系的重要内容，项目管理规划大纲应由（ ）编制。",[376,378,380,382],{"key":20,"text":377,"correct":22},"项目经理部在投标之前",{"key":24,"text":379,"correct":22},"企业管理层在中标之前",{"key":27,"text":381,"correct":22},"项目经理部在中标时",{"key":31,"text":383,"correct":29},"企业管理层在投标时",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},909110,"下列可用来控制工程造价的方法有（ ）。",[388,390,392,394],{"key":20,"text":389,"correct":22},"网络计划法",{"key":24,"text":391,"correct":29},"香蕉曲线法",{"key":27,"text":393,"correct":22},"因果分析法",{"key":31,"text":341,"correct":22},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},909111,"用于控制建设工程质量的静态分析方法是（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"香蕉图法和鱼刺图法",{"key":24,"text":402,"correct":22},"排列图法和控制图法",{"key":27,"text":404,"correct":22},"控制图法和责任图法",{"key":31,"text":406,"correct":29},"直方图法和排列图法",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},909112,"根据我国《建设工程项目管理规范》的规定，项目管理实施规划的内容应包括（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":29},"项目沟通管理计划",{"key":24,"text":414,"correct":22},"项目组织机构",{"key":27,"text":416,"correct":22},"项目投标报价策略",{"key":31,"text":418,"correct":22},"施工合同策略",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":27,"analysis":33},909113,"项目控制的方式和方法归纳起来可分为主动控制和被动控制两大类。下列不属于主动控制措施的是（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"详细调查并分析研究项目的外部条件",{"key":24,"text":426,"correct":22},"做好组织工作，使组织与目标和计划高度一致",{"key":27,"text":428,"correct":29},"建立有效的信息反馈系统，以便及时采取措施",{"key":31,"text":430,"correct":22},"沟通信息流通渠道，加强信息收集、整理和研究工作",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":31,"analysis":33},909114,"作为施工承包单位计划体系的重要内容，项目管理实施规划应由（ ）编制。",[435,437,438,440],{"key":20,"text":436,"correct":22},"企业管理层在投标之前",{"key":24,"text":377,"correct":22},{"key":27,"text":439,"correct":22},"企业管理层在开工之前",{"key":31,"text":441,"correct":29},"施工项目经理在开工之前",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},909115,"下列不属于工程项目建设总进度计划的表格是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"工程项目一览表",{"key":24,"text":449,"correct":22},"投资计划年度分配表",{"key":27,"text":451,"correct":22},"工程项目进度平衡表",{"key":31,"text":453,"correct":29},"年度计划项目表",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},909116,"总体施工准备是指（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"设备准备、现场准备和资金准备",{"key":24,"text":461,"correct":29},"技术准备、现场准备和资金准备",{"key":27,"text":463,"correct":22},"设备准备、技术准备和现场准备",{"key":31,"text":465,"correct":22},"设备准备、技术准备和资金准备",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},909117,"施工总进度计划的编制步骤包括①计算工程量，②确定各单位工程的施工期限，③确定各单位工程的开竣工时间和相互搭接关系，④编制初步施工总进度计划。这些工作正确顺序是（ ）。",[470,471,473,474],{"key":20,"text":353,"correct":29},{"key":24,"text":472,"correct":22},"②—③—①—④.",{"key":27,"text":357,"correct":22},{"key":31,"text":359,"correct":22},{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},909118,"下列方法中，可同时用来控制工程造价和工程进度的是（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"S曲线法和直方图法",{"key":24,"text":482,"correct":22},"直方图法和鱼刺图法",{"key":27,"text":484,"correct":22},"鱼刺图法和香蕉曲线法",{"key":31,"text":486,"correct":29},"香蕉曲线法和S曲线法",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},909119,"为了有效地控制建设工程项目目标，可采取的组织措施之一是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":29},"制订工作考核标准",{"key":24,"text":494,"correct":22},"论证技术方案",{"key":27,"text":496,"correct":22},"审查工程付款",{"key":31,"text":498,"correct":22},"选择合同计价方式",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},909120,"单位工程施工组织设计绘制施工进度计划图，首先应（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":29},"选择施工进度计划的表达形式",{"key":24,"text":506,"correct":22},"确定工作项目的施工顺序",{"key":27,"text":508,"correct":22},"确定工作项目的持续时间",{"key":31,"text":510,"correct":22},"计算劳动量和机械台班数",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},909121,"下列方法中用来寻找影响工程质量主要因素的工具是（ ）。",[515,517,518,519],{"key":20,"text":516,"correct":22},"因果分析图法",{"key":24,"text":341,"correct":29},{"key":27,"text":345,"correct":22},{"key":31,"text":347,"correct":22},{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":20,"analysis":33},909122,"在项目实施中，激励、调动和发挥项目控制人员实现目标的积极性、创造性，这是工程项目目标控制的（ ）之一。",[524,526,528,530],{"key":20,"text":525,"correct":29},"组织措施",{"key":24,"text":527,"correct":22},"技术措施",{"key":27,"text":529,"correct":22},"经济措施",{"key":31,"text":531,"correct":22},"合同措施",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},909123,"（ ）是编制施工总进度计划的前提。",[536,538,540,542],{"key":20,"text":537,"correct":22},"总体施工准备",{"key":24,"text":539,"correct":22},"主要施工方法",{"key":27,"text":541,"correct":22},"施工总平面布置",{"key":31,"text":543,"correct":29},"总体施工部署",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},909124,"根据《建筑施工组织设计规范》GB 50502-2009，施工组织设计有三个层次是指（ ）。",[548,549,551,553],{"key":20,"text":307,"correct":29},{"key":24,"text":550,"correct":22},"施工组织总设计，单项工程施工组织设计和施工进度计划",{"key":27,"text":552,"correct":22},"施工组织设计，施工进度计划和施工方案",{"key":31,"text":554,"correct":22},"指导性施工组织设计，实施性施工组织没计和施工方案",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":27,"analysis":33},909125,"下列计划表中，属于建设单位计划体系中工程项目建设总进度计划的是（ ）。",[559,560,562,563],{"key":20,"text":453,"correct":22},{"key":24,"text":561,"correct":22},"年度建设资金平衡表",{"key":27,"text":449,"correct":29},{"key":31,"text":564,"correct":22},"年度设备平衡表",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},909126,"应用直方图法分析工程质量状况时，直方图出现折齿型分布的原因是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":29},"数据分组不当或组距确定不当",{"key":24,"text":572,"correct":22},"少量材料不合格",{"key":27,"text":574,"correct":22},"短时间内工人操作不熟练",{"key":31,"text":576,"correct":22},"数据分类不当",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},909127,"施工组织总设计应由（ ）主持编制，应由（ ）负责审批。",[581,583,585,587],{"key":20,"text":582,"correct":29},"施工项目负责人，总承包单位技术负责人",{"key":24,"text":584,"correct":22},"总承包单位技术负责人，施工项目负责人",{"key":27,"text":586,"correct":22},"项目经理，高级工程师",{"key":31,"text":588,"correct":22},"项目经理，上级政府主管部门",[590,593,596,599,602,605],{"id":15,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":15},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]