[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,20,50,2821,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,200,212,224,236,247,259,269,281,293,305,317,327,339,351,363,375,385,397,407,416,428,440,450,462,474,484,492,499,507,519,531,543,555,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},909027,1,"单选题","根据《合同法》，在执行政府定价的合同履行中，需要按新价格执行的情形是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","逾期付款的，遇价格上涨时",true,{"key":24,"text":25,"correct":26},"B","逾期付款的，遇价格下降时",false,{"key":28,"text":29,"correct":26},"C","逾期提取标的物的，遇价格下降时",{"key":31,"text":32,"correct":26},"D","逾期交付标的物的，遇价格上涨时","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},909028,"根据《合同法》，债权人领取提存物的权利期限为（ ）年。",[38,40,42,44],{"key":20,"text":39,"correct":26},"1",{"key":24,"text":41,"correct":26},"2",{"key":28,"text":43,"correct":26},"3",{"key":31,"text":45,"correct":22},"5",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},909029,"当重要商品和服务价格显著上涨或者有可能显著上涨，国务院和省、自治区、直辖市人民政府不可以对部分价格采取的干预措施是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"限定差价率",{"key":24,"text":53,"correct":26},"利润率",{"key":28,"text":55,"correct":26},"规定限价",{"key":31,"text":57,"correct":22},"备付率",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},909030,"根据我国《价格法》，制定关系群众切身利益的公用事业价格、公益性服务价格、自然垄断经营的商品价格时，应当建立（ ）制度。",[62,64,66,68],{"key":20,"text":63,"correct":22},"听证会",{"key":24,"text":65,"correct":26},"公示",{"key":28,"text":67,"correct":26},"专家审议",{"key":31,"text":69,"correct":26},"人民代表评议",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},909031,"根据我国《合同法》的规定，双方当事人在合同中既约定违约金，又约定定金的，当一方违约时，对方（）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"只能适用违约金条款",{"key":24,"text":77,"correct":22},"可以选择适用违约金或者定金条款",{"key":28,"text":79,"correct":26},"只能适用定金条款",{"key":31,"text":81,"correct":26},"可同时适用违约金和定金条款",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},909032,"根据我国《合同法》的规定，当事人以自己的行为放弃撤销权的，（）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"撤销权仍然存在",{"key":24,"text":89,"correct":22},"撤销权消灭",{"key":28,"text":91,"correct":26},"撤销权存在与否取决于当事人的意志",{"key":31,"text":93,"correct":26},"撤销权存在与否应由人民法院裁定",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},909033,"下列对限制民事行为能力人表述正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"限制民事行为能力人是指8周岁—18周岁的未成年人，以及不能完全辨认自己行为的精神病人",{"key":24,"text":101,"correct":26},"限制民事行为能力人是指12周岁以上不满16周岁的未成年人，以及不能完全辨认自己行为的精神病人",{"key":28,"text":103,"correct":26},"限制民事行为能力人是指13周岁以上不满16周岁的未成年人，以及不能完全辨认自己行为的精神病人",{"key":31,"text":105,"correct":26},"限制民事行为能力人是指14周岁以上不满18周岁的未成年人，以及不能完全辨认自己行为的精神病人",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},909034,"对一般工业与民用建筑工程而言，下列工程中属于分项工程的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"地基与基础处理",{"key":24,"text":113,"correct":26},"电气工程",{"key":28,"text":115,"correct":26},"电梯工程",{"key":31,"text":117,"correct":22},"钢结构基础",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},909035,"根据《关于实行建设项目法人责任制的暂行规定》，项目董事会的职权之一是( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"负责提出项目竣工验收申请报告",{"key":24,"text":125,"correct":26},"组织编制项目初步设计文件",{"key":28,"text":127,"correct":26},"组织实施项目年度投资计划",{"key":31,"text":129,"correct":26},"负责组织项目试生产和单项工程预验收",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},909036,"根据《国务院关于投资体制改革的决定》，对于采用投资补助方式的政府投资项目，政府需要审批的文件是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"项目建议书",{"key":24,"text":137,"correct":26},"可行性研究报告",{"key":28,"text":139,"correct":22},"资金申请报告",{"key":31,"text":141,"correct":26},"初步设计和概算",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},909037,"在实际工作中，往往从效益后评价、过程后评价两个方面对工程项目进行后评价。下面属于效益后评价的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"项目可持续性后评价",{"key":24,"text":149,"correct":26},"立项决策系统分析",{"key":28,"text":151,"correct":26},"设计施工系统分析",{"key":31,"text":153,"correct":26},"生产运营系统分析",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},909038,"实行建设项目法人责任制的项目，项目董事会需要负责的工作是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"筹措建设资金并按时偿还债务",{"key":24,"text":161,"correct":26},"组织编制并上报项目初步设计文件",{"key":28,"text":163,"correct":26},"编制和确定工程招标方案",{"key":31,"text":165,"correct":26},"组织工程建设实施并控制项目目标",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},909039,"工程项目可根据投资作用划分为生产性工程项目和非生产性工程项目两类，下列项目中属于生产性工程项目的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"办公建筑",{"key":24,"text":173,"correct":22},"基础设施建设项目",{"key":28,"text":175,"correct":26},"公共建筑",{"key":31,"text":177,"correct":26},"居住建筑",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},909040,"根据《建筑工程施工质量验收统一标准》GB 50300--2013，下列工程中，属于分项工程的是（ ）。",[182,183,185,187],{"key":20,"text":113,"correct":26},{"key":24,"text":184,"correct":22},"钢筋工程",{"key":28,"text":186,"correct":26},"屋面工程",{"key":31,"text":188,"correct":26},"基础工程",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},909041,"根据《国务院关于投资体制改革的决定》，实施核准制的项目，企业应向政府主管部门提交（ ）。",[193,194,196,198],{"key":20,"text":135,"correct":26},{"key":24,"text":195,"correct":26},"项目可行性研究",{"key":28,"text":197,"correct":22},"项目申请报告",{"key":31,"text":199,"correct":26},"项目开工报告",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},909042,"工程项目管理组织机构采用直线制形式的主要优点是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":26},"管理业务专门化，易提高工作质量",{"key":24,"text":207,"correct":26},"部门间横向联系强，管理效率高",{"key":28,"text":209,"correct":22},"隶属关系明确，易实现统一指挥",{"key":31,"text":211,"correct":26},"集权与分权结合，管理机构灵活",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":28,"analysis":33},909043,"根据《关于实行建设项目法人责任制的暂行规定》，项目法人应在（ ）正式成立。",[216,218,220,222],{"key":20,"text":217,"correct":26},"项目建议书被批准后",{"key":24,"text":219,"correct":26},"项目施工图设计文件审查通过后",{"key":28,"text":221,"correct":22},"项目可行性研究报告被批准后",{"key":31,"text":223,"correct":26},"项目初步设计文件被批准后",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},909044,"根据《建筑工程施工图设计文件审查暂行办法》，（ ）应当将施工图报送建设行政主管部门，由其委托有关机构进行审查。",[228,230,232,234],{"key":20,"text":229,"correct":26},"设计单位",{"key":24,"text":231,"correct":22},"建设单位",{"key":28,"text":233,"correct":26},"咨询单位",{"key":31,"text":235,"correct":26},"质量监督机构",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},909045,"根据《国务院关于投资体制改革的决定》，为了广泛听取社会各方对政府投资项目的意见和建议，国家将逐步实行政府投资项目（ ）制度。",[240,242,243,245],{"key":20,"text":241,"correct":26},"专家评审",{"key":24,"text":65,"correct":22},{"key":28,"text":244,"correct":26},"咨询评估",{"key":31,"text":246,"correct":26},"听证",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},909046,"世界银行贷款项目的建设周期中各工作阶段的正确顺序是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":26},"项目选定、项目评估、项目准备、项目谈判、项目实施、项目总结评价",{"key":24,"text":254,"correct":26},"项目评估、项目选定、项目谈判、项目准备、项目实施、项目总结评价",{"key":28,"text":256,"correct":22},"项目选定、项目准备、项目评估、项目谈判、项目实施、项目总结评价",{"key":31,"text":258,"correct":26},"项目评估、项目选定、项目准备、项目谈判、项目实施、项目总结评价",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},909047,"根据《国务院关于投资体制改革的决定》，企业不使用政府资金投资建设《政府核准的投资项目目录》中的项目时，企业仅需向政府提交（ ）。",[263,264,266,267],{"key":20,"text":197,"correct":22},{"key":24,"text":265,"correct":26},"项目可行性研究报告",{"key":28,"text":199,"correct":26},{"key":31,"text":268,"correct":26},"项目初步设计文件",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":31,"analysis":33},909048,"根据《国务院关于投资体制改革的决定》，企业投资建设《政府核准的投资项目目录》以外的项目实行（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":26},"审批制",{"key":24,"text":276,"correct":26},"核准制",{"key":28,"text":278,"correct":26},"登记制",{"key":31,"text":280,"correct":22},"备案制",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},909049,"下列关于竣工图的说明，正确的是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":26},"竣工图必须由施工单位绘制",{"key":24,"text":288,"correct":26},"竣工图必须由设计单位绘制",{"key":28,"text":290,"correct":26},"竣工图由业主负责绘制",{"key":31,"text":292,"correct":22},"竣工图必须由施工单位加盖竣工图标志",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},909050,"工程项目的项目后评价是固定资产投资管理的最后一个环节，项目后评价的基本方法是（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":26},"效益评价法",{"key":24,"text":300,"correct":26},"影响评价法",{"key":28,"text":302,"correct":22},"对比法",{"key":31,"text":304,"correct":26},"过程评价法",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":31,"analysis":33},909051,"城镇市政基础设施工程的建设单位应在开工前向（ ）申请领取施工许可证。",[309,311,313,315],{"key":20,"text":310,"correct":26},"国务院建设主管部门",{"key":24,"text":312,"correct":26},"工程所在地省级以上人民政府建设主管部门",{"key":28,"text":314,"correct":26},"工程所在地地市级以上人民政府建设主管部门",{"key":31,"text":316,"correct":22},"工程所在地县级以上人民政府建设主管部门",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},909052,"根据《国务院关于投资体制改革的决定》，对于采用直接投资和资本金注入方式的政府投资项目，政府需要严格审批其（ ）。",[321,322,324,325],{"key":20,"text":141,"correct":22},{"key":24,"text":323,"correct":26},"开工报告",{"key":28,"text":139,"correct":26},{"key":31,"text":326,"correct":26},"项目核准报告",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":28,"analysis":33},909053,"建设单位在办理工程质量监督注册手续时，需提供（ ）。",[331,333,335,337],{"key":20,"text":332,"correct":26},"投标文件",{"key":24,"text":334,"correct":26},"专项施工方案",{"key":28,"text":336,"correct":22},"施工组织设计",{"key":31,"text":338,"correct":26},"施工图设计文件",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":28,"analysis":33},909054,"根据《关于实行建设项目法人责任制的暂行规定》，项目总经理的职权之一是（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":26},"提出项目开工报告",{"key":24,"text":346,"correct":26},"审核项目初步设计和概算文件",{"key":28,"text":348,"correct":22},"组织工程招标工作",{"key":31,"text":350,"correct":26},"提出项目竣工验收申请报告",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":28,"analysis":33},909055,"根据我国现行规定，不同类别的建设工程项目应采用不同的组织实施方式，下列组合中正确的是（ ）。",[355,357,359,361],{"key":20,"text":356,"correct":26},"竞争性项目—代建制",{"key":24,"text":358,"correct":26},"公益性项目—项目法人责任制",{"key":28,"text":360,"correct":22},"非经营性政府投资项目—代建制",{"key":31,"text":362,"correct":26},"基础性项目—代建制",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":31,"analysis":33},909056,"根据《国务院关于投资体制改革的决定》，下列关于项目投资决策审批制度的说明，正确的是（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":26},"政府投资项目实行审批制和核准制",{"key":24,"text":370,"correct":26},"采用资本金注入方式的政府投资项目，需要审批项目建议书、可行性研究报告和开工报告",{"key":28,"text":372,"correct":26},"对于企业不使用政府资金投资建设的项目，一律实行备案制",{"key":31,"text":374,"correct":22},"按规定应实行备案的项目由企业按照属地原则向地方政府投资主管部门备案",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},909057,"根据我国《关于实行建设项目法人责任制的暂行规定》的要求，项目总经理的职权包括（ ）。",[379,381,383,384],{"key":20,"text":380,"correct":26},"聘任或解聘项目高级管理人员",{"key":24,"text":382,"correct":22},"组织单项工程预验收",{"key":28,"text":350,"correct":26},{"key":31,"text":344,"correct":26},{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},909058,"工程项目承包模式中，建设单位组织协调工作量小，但风险较大的是（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":26},"总分包模式",{"key":24,"text":392,"correct":22},"合作体承包模式",{"key":28,"text":394,"correct":26},"平行承包模式",{"key":31,"text":396,"correct":26},"联合体承包模式",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},909059,"根据《建设工程质量管理条例》，应当按照国家有关规定办理工程质量监督手续的单位是（ ）。",[401,402,403,405],{"key":20,"text":231,"correct":22},{"key":24,"text":229,"correct":26},{"key":28,"text":404,"correct":26},"监理单位",{"key":31,"text":406,"correct":26},"施工单位",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},909060,"根据《国务院关于投资体制改革的决定》，对于采用贷款贴息方式的政府投资项目，政府需要审批（ ）。",[411,412,413,415],{"key":20,"text":135,"correct":26},{"key":24,"text":137,"correct":26},{"key":28,"text":414,"correct":26},"工程概算",{"key":31,"text":139,"correct":22},{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},909061,"国有大中型项目在建设阶段就按现代企业制度组建项目法人，实行全过程负责的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"项目法人责任制",{"key":24,"text":423,"correct":26},"工程监理制",{"key":28,"text":425,"correct":26},"工程招标投标制",{"key":31,"text":427,"correct":26},"合同管理制",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},909062,"按照工程建设项目发展的内在规律，投资建设一个工程项目都要经过投资决策和建设实施两个发展时期。这两个发展时期又可分为若干个阶段，它们之间（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"次序可以颠倒，但不能交叉",{"key":24,"text":435,"correct":22},"次序不能颠倒，但可以合理交叉",{"key":28,"text":437,"correct":26},"次序不能颠倒，也不能交叉",{"key":31,"text":439,"correct":26},"次序可以颠倒，也可以交叉",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},909063,"对于一般工业与民用建筑工程而言，下列工程中，属于分部工程的是（ ）。",[444,446,448,449],{"key":20,"text":445,"correct":26},"砌体工程",{"key":24,"text":447,"correct":26},"幕墙工程",{"key":28,"text":184,"correct":26},{"key":31,"text":115,"correct":22},{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},909064,"为了实现工程造价的模拟计算和动态控制，可应用建筑信息建模（BIM）技术，在包含进度数据的建筑模型上加载费用数据而形成（ ）模型。",[454,456,458,460],{"key":20,"text":455,"correct":26},"6D",{"key":24,"text":457,"correct":22},"5D",{"key":28,"text":459,"correct":26},"4D",{"key":31,"text":461,"correct":26},"3D",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},909065,"根据《国务院关于投资体制改革的决定》，实施核准制的项目，企业不再经过批准（ ）的程序。",[466,468,470,472],{"key":20,"text":467,"correct":26},"项目申请报告、可行性研究报告和开工报告",{"key":24,"text":469,"correct":22},"项目建议书、可行性研究报告和开工报告",{"key":28,"text":471,"correct":26},"项目申请报告、项目建议书和可行性研究报告",{"key":31,"text":473,"correct":26},"项目申请报告、项目建议书和开工报告",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},909066,"根据《建筑工程施工质量验收统一验收标准》GB 50300-2013，下列工程中，属于分部工程的是（ ）。",[478,479,480,482],{"key":20,"text":113,"correct":22},{"key":24,"text":184,"correct":26},{"key":28,"text":481,"correct":26},"土建工程",{"key":31,"text":483,"correct":26},"工业管道工程",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},909067,"根据《建筑工程质量管理条例》，应当按照国家有关规定办理质量监督手续的单位（ ）。",[488,489,490,491],{"key":20,"text":231,"correct":22},{"key":24,"text":229,"correct":26},{"key":28,"text":404,"correct":26},{"key":31,"text":406,"correct":26},{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":494,"answer":20,"analysis":33},909068,[495,496,497,498],{"key":20,"text":421,"correct":22},{"key":24,"text":423,"correct":26},{"key":28,"text":425,"correct":26},{"key":31,"text":427,"correct":26},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":31,"analysis":33},909069,"根据《国务院关于投资体制改革的决定》，下列关于项目投资决策审批制度的说明，正确的是（）。",[503,504,505,506],{"key":20,"text":368,"correct":26},{"key":24,"text":370,"correct":26},{"key":28,"text":372,"correct":26},{"key":31,"text":374,"correct":22},{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":28,"analysis":33},909070,"下列工程中，属于分部工程的是（ ）",[511,513,515,517],{"key":20,"text":512,"correct":26},"既有工厂的车间扩建工程",{"key":24,"text":514,"correct":26},"工业车间的设备安装工程",{"key":28,"text":516,"correct":22},"房屋建筑的装饰装修工程",{"key":31,"text":518,"correct":26},"基础工程中的土方开挖工程",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":28,"analysis":33},909071,"根据《国务院关于投资体制改革的决定》，下列说法错误的是（）。",[523,525,527,529],{"key":20,"text":524,"correct":26},"非政府投资项目实行核准制和备案制",{"key":24,"text":526,"correct":26},"对于采用投资补助方式的政府投资项目，政府需要审批资金申请报告",{"key":28,"text":528,"correct":22},"对于企业不使用政府资金投资建设的项目，需向政府提交项目申请报告和开工报告",{"key":31,"text":530,"correct":26},"对于采用直接投资的政府投资项目，政府需要审批项目建议书和可行性研究报告",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},909072,"根据国家现行规定，下列关于建设项目竣工验收的表述正确的是（）。",[535,537,539,541],{"key":20,"text":536,"correct":26},"无论规模大小，建设项目完工后均应进行初验，然后进行正式验收",{"key":24,"text":538,"correct":26},"建设项目竣工图应由施工单位绘制并加盖“竣工图”标志",{"key":28,"text":540,"correct":22},"由项目主管部门或建设单位向负责验收的单位提出竣工验收申请报告",{"key":31,"text":542,"correct":26},"施工单位必须及时编制竣工决算，分析投资计划执行情况",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},909073,"根据国家有关规定，办理质量监督注册手续时不需要提供（）资料。",[547,549,551,553],{"key":20,"text":548,"correct":26},"中标通知书",{"key":24,"text":550,"correct":26},"施工合同",{"key":28,"text":552,"correct":26},"监理规划",{"key":31,"text":554,"correct":22},"施工方案",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},909074,"目前BIM技术在我国工程项目管理中的应用仍处于初级阶段，不属于值得关注和推广的应用是（）。",[559,561,563,565],{"key":20,"text":560,"correct":26},"构建可视化模型",{"key":24,"text":562,"correct":22},"提出工程设计方案",{"key":28,"text":564,"correct":26},"模拟施工",{"key":31,"text":566,"correct":26},"合理安排资源计划",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":31,"analysis":33},909075,"根据国家有关规定，施工图审查机构对施工图审查的内容不包括（）。",[571,573,575,577],{"key":20,"text":572,"correct":26},"是否符合工程建设强制性标准",{"key":24,"text":574,"correct":26},"地基基础和主体结构的安全性",{"key":28,"text":576,"correct":26},"是否符合民用建筑节能强制性标准，对执行绿色建筑标准的项目，还应当审查是否符合绿色建筑标准",{"key":31,"text":578,"correct":22},"勘察设计企业和注册执业人员的资质",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},909076,"下列工程项目管理组织机构形式中，具有较大的机动性和灵活性，能够实现集权与分权的最优结合，但因有双重领导，容易产生扯皮现象的是（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"矩阵制",{"key":24,"text":586,"correct":26},"直线职能制",{"key":28,"text":588,"correct":26},"直线制",{"key":31,"text":590,"correct":26},"职能制",[592,595,598,601,604,607],{"id":15,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":15},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]