[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":577},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,14,50,2821,[13,34,46,58,70,82,94,106,118,127,139,148,160,171,180,192,204,215,227,239,251,263,275,287,298,310,318,329,341,353,364,373,385,397,409,418,427,436,448,460,472,482,491,499,511,519,531,543,553,565],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},908718,1,"单选题","施工承包单位应在知道或应当知道索赔事件发生后（ ）天内，向监理工程师递交索赔意向通知书。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","7",false,{"key":24,"text":25,"correct":22},"B","14",{"key":27,"text":28,"correct":29},"C","28",true,{"key":31,"text":32,"correct":22},"D","42","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},908719,"其工程施工至2016 年12 月底，已完工程计划费用（BCWP）2000 万元，拟完工程计划费用（BCWS）2500 万元，已完工程实际费用（ACWP）为1800 万元，则此时该工程的费用绩效指数CPI 为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"0.8",{"key":24,"text":41,"correct":22},"0.9",{"key":27,"text":43,"correct":29},"1.11",{"key":31,"text":45,"correct":22},"1.25",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},908720,"某工程项目竣工结算报告金额为3500 万元，则根据《建设工程价款结算暂行办法》，建设单位对结算报告的审查时限为（ ）日",[50,52,54,56],{"key":20,"text":51,"correct":22},"20",{"key":24,"text":53,"correct":22},"30",{"key":27,"text":55,"correct":29},"45",{"key":31,"text":57,"correct":22},"60",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},908721,"根据《标准施工招标文件》(2007 年版)中的通用合同条件，由于施工承包单位原因造成某项缺陷不能按原定目标使用而需要再次检查、检验和修复的，建设单位有权要求施工承包单位相应延长缺陷责任期，但缺陷责任期最长不超过（ ）年。",[62,64,66,68],{"key":20,"text":63,"correct":22},"1",{"key":24,"text":65,"correct":29},"2",{"key":27,"text":67,"correct":22},"3",{"key":31,"text":69,"correct":22},"5",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},908722,"某工程施工至2014 年7 月底，已完工程计划费用(BCWP)为600 万元，已完工程实际费用(ACWP)为800 万元，拟完工程计划费用(BCWS)为700 万元，则该工程此时的偏差情况是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"费用节约，进度提前",{"key":24,"text":77,"correct":29},"费用超支，进度拖后",{"key":27,"text":79,"correct":22},"费用节约，进度拖后",{"key":31,"text":81,"correct":22},"费用超支，进度提前",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},908723,"某工程经偏差分析得到费用绩效指数CPI﹥1，进度绩效指数SPI＜1，则表明（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工程费用超支",{"key":24,"text":89,"correct":22},"工程进度提前",{"key":27,"text":91,"correct":22},"已完工程计划费用＜已完工程实际费用",{"key":31,"text":93,"correct":29},"拟完工程计划费用﹥已完工程计划费用﹥已完工程实际费用",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},908725,"下列偏差分析方法中，既可分析费用偏差，又可分析进度偏差的是（ ）",[98,100,102,104],{"key":20,"text":99,"correct":29},"时标网络图和曲线法",{"key":24,"text":101,"correct":22},"曲线法和控制图法",{"key":27,"text":103,"correct":22},"排列图法和时标网络图法",{"key":31,"text":105,"correct":22},"控制图法和表格法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},908726,"施工图预算审查方法中，审查速度快但审重精度较差的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"标准预算审查法",{"key":24,"text":113,"correct":22},"对比审查法",{"key":27,"text":115,"correct":29},"分组计算审查法",{"key":31,"text":117,"correct":22},"全面审查法",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},908727,"首先对单位工程的直接费和间接费进行分解，再按工种和分部工程对直接费进行分解，分别与审定的标准预算进行对比的施工图预算审查法称作（ ）",[122,123,124,125],{"key":20,"text":111,"correct":22},{"key":24,"text":115,"correct":22},{"key":27,"text":113,"correct":22},{"key":31,"text":126,"correct":29},"分解对比审查法",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":27,"analysis":33},908728,"设计方案的评价方法主要包括（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"多指标法、单指标法以及单因素评分法",{"key":24,"text":134,"correct":22},"多指标法、多因素评分法、功能成本法",{"key":27,"text":136,"correct":29},"多指标法、单指标法以及多因素评分法",{"key":31,"text":138,"correct":22},"多指标法、功能成本法以及多因素评分法",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":27,"analysis":33},908729,"拟建工程与已完工程采用同一个施工图，但两者基础部分和现场施工条件不同，则对相同部分的施工图预算，宜采用的审查方法是（ ）。",[143,144,146,147],{"key":20,"text":115,"correct":22},{"key":24,"text":145,"correct":22},"筛选审查法",{"key":27,"text":113,"correct":29},{"key":31,"text":111,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":27,"analysis":33},908731,"下列施工成本管理方法中，能预测在建工程尚需成本数额，为后续工程施工成本和进度控制指明方向的方法是（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"工期—成本同步分析法",{"key":24,"text":155,"correct":22},"价值工程法",{"key":27,"text":157,"correct":29},"挣值分析法",{"key":31,"text":159,"correct":22},"因素分析法",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":20,"analysis":33},908732,"下列成本分析中，主要用来确定目标成本、实际成本和降低成本的比例关系，从而为寻求降低成本的途径指明方向的是（ ）。",[164,166,168,169],{"key":20,"text":165,"correct":29},"构成比率法",{"key":24,"text":167,"correct":22},"相关比率法",{"key":27,"text":159,"correct":22},{"key":31,"text":170,"correct":22},"差额计算法",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":31,"analysis":33},908733,"工程寿命周期成本分析评价中,可用来估算费用的方法是（ ）。",[175,176,177,178],{"key":20,"text":165,"correct":22},{"key":24,"text":159,"correct":22},{"key":27,"text":157,"correct":22},{"key":31,"text":179,"correct":29},"参数估算法",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":24,"analysis":33},908734,"偏差分析的方法中具有适用性强、信息量大、可以反映各种偏差变量和指标且有助于用计算机辅助管理的方法是（ ）。",[184,186,188,190],{"key":20,"text":185,"correct":22},"横道图法",{"key":24,"text":187,"correct":29},"表格法",{"key":27,"text":189,"correct":22},"曲线法",{"key":31,"text":191,"correct":22},"时标网络图法",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":31,"analysis":33},908735,"下列方法中，可用于寿命周期成本评价的方法是（ ）。",[196,198,200,202],{"key":20,"text":197,"correct":22},"环比分析法",{"key":24,"text":199,"correct":22},"动态比较法",{"key":27,"text":201,"correct":22},"强制评分法",{"key":31,"text":203,"correct":29},"权衡分析法",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":20,"analysis":33},908736,"在工程寿命周期成本分析中，进行系统设置费与该系统开发、设置所用全部时间之间的权衡分析时所采用的主要方法是（ ）。",[208,210,212,214],{"key":20,"text":209,"correct":29},"计划评审技术",{"key":24,"text":211,"correct":22},"价值分析法",{"key":27,"text":213,"correct":22},"赢得值分析法",{"key":31,"text":159,"correct":22},{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":24,"analysis":33},908739,"下列建设工程项目目标控制方法中，可用来综合控制工程进度和工程造价的方法是（ ）。",[219,221,223,225],{"key":20,"text":220,"correct":22},"决策树法和流程图法",{"key":24,"text":222,"correct":29},"S 曲线法和香蕉曲线法",{"key":27,"text":224,"correct":22},"横道图法和树枝图法",{"key":31,"text":226,"correct":22},"网络图法和横道图法",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":27,"analysis":33},908740,"下列工程项目目标控制方法中，可以用来判断工程造价偏差的是（ ）。",[231,233,235,237],{"key":20,"text":232,"correct":22},"控制图法",{"key":24,"text":234,"correct":22},"鱼刺图法",{"key":27,"text":236,"correct":29},"S 曲线法",{"key":31,"text":238,"correct":22},"网络计划法",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":24,"analysis":33},908741,"设计概算审查的常用方法不包括（ ）",[243,245,247,249],{"key":20,"text":244,"correct":22},"联合会审法",{"key":24,"text":246,"correct":29},"概算指标法",{"key":27,"text":248,"correct":22},"查询核实法",{"key":31,"text":250,"correct":22},"对比分析法",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":24,"analysis":33},908742,"下列方法中，可用于施工成本定性预测和定量预测的方法分别是（ ）",[255,257,259,261],{"key":20,"text":256,"correct":22},"目标利润法和加权平均法",{"key":24,"text":258,"correct":29},"函询调查法和回归分析法",{"key":27,"text":260,"correct":22},"技术进步法和按实计算法",{"key":31,"text":262,"correct":22},"座谈会法和定率估算法",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":27,"analysis":33},908743,"下列固定资产折旧方法中，属于平均分摊固定资产折旧额的方法是（ ）",[267,269,271,273],{"key":20,"text":268,"correct":22},"年数总和法和双倍余额递减法",{"key":24,"text":270,"correct":22},"双倍余额递减法和使用年限法",{"key":27,"text":272,"correct":29},"使用年限法和工作量法",{"key":31,"text":274,"correct":22},"工作量法和年数总和法",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":27,"analysis":33},908744,"当评价计算期不同的互斥方案的经济效果时，可采用的动态评价方法是（ ）",[279,281,283,285],{"key":20,"text":280,"correct":22},"年折算费用法和增量内部收益率法",{"key":24,"text":282,"correct":22},"综合总费用法和无限计算期法",{"key":27,"text":284,"correct":29},"研究期法和最小公倍数法",{"key":31,"text":286,"correct":22},"增量投资收益率法和年费用法",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":20,"analysis":33},908745,"用来分析工程质量主要影响因素的方法是（ ）",[291,293,295,297],{"key":20,"text":292,"correct":29},"排列图法",{"key":24,"text":294,"correct":22},"责任图法",{"key":27,"text":296,"correct":22},"直方图法",{"key":31,"text":232,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},908746,"各年折旧基数不变但折旧率逐年递减的固定资产折旧方法是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"平均年限法",{"key":24,"text":305,"correct":22},"工作量法",{"key":27,"text":307,"correct":22},"双倍余额递减法",{"key":31,"text":309,"correct":29},"年数总和法",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},908747,"在下列固定资产折旧方法中，每年折旧率均相等的是（ ）",[314,315,316,317],{"key":20,"text":303,"correct":29},{"key":24,"text":309,"correct":22},{"key":27,"text":307,"correct":22},{"key":31,"text":305,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},908748,"下列施工机械折旧方法中，折旧率为固定值的是（ ）",[322,324,326,328],{"key":20,"text":323,"correct":22},"平均年限法和年数总和法",{"key":24,"text":325,"correct":22},"工作量法和加速折旧法",{"key":27,"text":327,"correct":29},"平均年限法和双倍余额递减法",{"key":31,"text":274,"correct":22},{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":27,"analysis":33},908749,"基于“关键的少数和次要的多数” 原理对一个产品的零部件进行分类，并选择“占产品成本比例高而占零部件总数比例低”的零部件作为价值工程的对象，这种方法称为（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":22},"强制确定法",{"key":24,"text":336,"correct":22},"价值指数法",{"key":27,"text":338,"correct":29},"ABC 分析法",{"key":31,"text":340,"correct":22},"头脑风暴法",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},908750,"下列方法中，可用于编制施工项目成本计划的是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"时间序列法",{"key":24,"text":348,"correct":29},"技术进步法",{"key":27,"text":350,"correct":22},"流程图法",{"key":31,"text":352,"correct":22},"分层法",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":27,"analysis":33},908753,"在价值工程活动的方案创造阶段，要求专家们根据有关研究对象的问题和要求，在互不商量的情况下提出各种建议和设想的方法是（ ）。",[357,358,360,362],{"key":20,"text":340,"correct":22},{"key":24,"text":359,"correct":22},"哥顿法",{"key":27,"text":361,"correct":29},"德尔菲法",{"key":31,"text":363,"correct":22},"专家检查法",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":20,"analysis":33},908754,"在价值工程的方案创造阶段，由对改进对象有较深了解的人员组成的小集体在非常融洽和不受任何限制的气氛中进行讨论、座谈，积极思考、互相启发、集思广益地提出创新方案的方法称为（ ）。",[368,369,370,372],{"key":20,"text":340,"correct":29},{"key":24,"text":359,"correct":22},{"key":27,"text":371,"correct":22},"专家意见法",{"key":31,"text":363,"correct":22},{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},908755,"按是否考虑资金的时间价值、投资方案经济效果评价方法分为（ ）",[377,379,381,383],{"key":20,"text":378,"correct":22},"线性评价方法和非线性评价方法",{"key":24,"text":380,"correct":29},"静态评价方法和动态评价方法",{"key":27,"text":382,"correct":22},"确定性评价方法和不确定性评价方法",{"key":31,"text":384,"correct":22},"定量评价方法和定性评价方法",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":20,"analysis":33},908756,"下列工程项目目标控制方法组中，控制的原理基本相同，目的也相同的是（ ）",[389,391,393,395],{"key":20,"text":390,"correct":29},"香蕉曲线法和S 曲线法",{"key":24,"text":392,"correct":22},"网络计划法和香蕉曲线法",{"key":27,"text":394,"correct":22},"排列图法和网络计划法",{"key":31,"text":396,"correct":22},"S 曲线法和排列图法",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},908758,"价值工程活动的首要环节是进行对象的选择，适用于价值工程对象选择的方法是（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"因果分析法和层次分析法",{"key":24,"text":404,"correct":29},"因素分析法和价值指数法",{"key":27,"text":406,"correct":22},"因果分析法和价值指数法",{"key":31,"text":408,"correct":22},"层次分析法和因素分析法",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":27,"analysis":33},908759,"在价值工程活动中，首先将产品的各种部件按成本由高到低排列，然后绘制成本累积分配图，最后将成本累积占总成本70％~80％的部件作为价值工程主要研究对象的方法称为（ ）",[413,414,415,416],{"key":20,"text":159,"correct":22},{"key":24,"text":334,"correct":22},{"key":27,"text":338,"correct":29},{"key":31,"text":417,"correct":22},"百分比分析法",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},908760,"在价值工程研究对象彼此相差较大且时间紧迫情况下，确定价值工程研究对象可选用的方法是（ ）。",[422,423,424,425],{"key":20,"text":159,"correct":29},{"key":24,"text":334,"correct":22},{"key":27,"text":336,"correct":22},{"key":31,"text":426,"correct":22},"回归分析法",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},908761,"下列方法中，既可用于价值工程对象选择，又可用于确定功能重要性系数的是（ ）。",[431,432,434,435],{"key":20,"text":159,"correct":22},{"key":24,"text":433,"correct":22},"重点选择法",{"key":27,"text":363,"correct":22},{"key":31,"text":334,"correct":29},{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},908762,"在下列评价方法中，属于互斥型投资方案经济效果动态评价方法的是（ ）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"增量投资回收期法",{"key":24,"text":443,"correct":29},"增量投资内部收益率法",{"key":27,"text":445,"correct":22},"综合总费用法",{"key":31,"text":447,"correct":22},"年折算费用法",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},908763,"评价计算期不同的互斥方案的经济效果时，可采用的动态评价方法有（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"增量投资收益率法和净现值法",{"key":24,"text":455,"correct":29},"增量内部收益率法和净年值法",{"key":27,"text":457,"correct":22},"增量投资回收期法和净年值法",{"key":31,"text":459,"correct":22},"年折算费用法和年费用现值法",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},908764,"评价计算期相同的互斥方案经济效果时，可采用的静态方法是（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"增量投资收益率和增量内部收益率",{"key":24,"text":467,"correct":22},"增量投资回收期和内部收益率",{"key":27,"text":469,"correct":29},"年折算费用和综合总费用",{"key":31,"text":471,"correct":22},"年平均使用成本和年净收益",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},908765,"下列方法中，可用于编制工程项目成本计划的是（ ）",[476,477,479,480],{"key":20,"text":157,"correct":22},{"key":24,"text":478,"correct":29},"目标利润法",{"key":27,"text":153,"correct":22},{"key":31,"text":481,"correct":22},"成本分析表法",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},908766,"价值工程活动中可用来选择价值工程对象的方法是（ ）",[486,487,489,490],{"key":20,"text":157,"correct":22},{"key":24,"text":488,"correct":22},"时间序列分析法",{"key":27,"text":426,"correct":22},{"key":31,"text":417,"correct":29},{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},908767,"下列工程项目目标控制方法中，可用来掌握产品质量波动情况及质量特征的分布规律，以便对质量状况进行分析判断的是（ ）",[495,496,497,498],{"key":20,"text":296,"correct":29},{"key":24,"text":234,"correct":22},{"key":27,"text":232,"correct":22},{"key":31,"text":236,"correct":22},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":27,"analysis":33},908768,"下列关于工程项目目标控制方法的表述中正确的是（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":22},"直方图是一种用来寻找影响工程质量主要因素的有效工具",{"key":24,"text":506,"correct":22},"通过因果分析图，可以发现工程项目中的主要质量问题",{"key":27,"text":508,"correct":29},"S 曲线与香蕉曲线都可以用来控制工程造价和工程进度",{"key":31,"text":510,"correct":22},"控制图法和直方图法分别属于质量控制的静态和动态分析方法",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},908770,"在选择价值工程对象时，先求出分析对象的成本系数、功能系数，然后得出价值系数，当分析对象的功能与成本不相符时，价值低的选为价值工程的研究对象的方法称为（ ）",[515,516,517,518],{"key":20,"text":433,"correct":22},{"key":24,"text":159,"correct":22},{"key":27,"text":334,"correct":29},{"key":31,"text":336,"correct":22},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},908771,"根据《政府采购实施条例》，政府采购技术、服务等标准统一的货物和服务应当采用（ ）",[523,525,527,529],{"key":20,"text":524,"correct":22},"综合评分法",{"key":24,"text":526,"correct":29},"最低评标价法",{"key":27,"text":528,"correct":22},"合理单价评标法",{"key":31,"text":530,"correct":22},"单项评议法",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":20,"analysis":33},908772,"建设工程项目投资决策后，控制工程造价的关键在于（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":29},"工程设计",{"key":24,"text":538,"correct":22},"工程施工",{"key":27,"text":540,"correct":22},"材料设备采购",{"key":31,"text":542,"correct":22},"施工招标",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":20,"analysis":33},908773,"建设工程项目投资决策完成后，控制工程造价的关键在于（ ）。",[547,548,550,551],{"key":20,"text":536,"correct":29},{"key":24,"text":549,"correct":22},"工程招标",{"key":27,"text":538,"correct":22},{"key":31,"text":552,"correct":22},"工程结算",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},908774,"全要素造价管理的核心是按照优先性的原则，协调和平衡（ ）之间的对立统一关系。",[557,559,561,563],{"key":20,"text":558,"correct":29},"工期、质量、安全、环保与成本",{"key":24,"text":560,"correct":22},"人工费、材料费、施工机具使用费与成本",{"key":27,"text":562,"correct":22},"直接成本、间接成本、规费、利润与成本",{"key":31,"text":564,"correct":22},"建筑安装工程费用、设备工器具费用、工程建设其他费用与成本",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},908775,"我国工程造价管理组织的三个系统是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":29},"政府行政管理系统、企事业单位管理系统、行业协会管理系统",{"key":24,"text":572,"correct":22},"国务院建设行政管理系统、省级行政管理系统、行业协会管理系统",{"key":27,"text":574,"correct":22},"国务院建设行政管理系统、省级行政管理系统、企事业单位管理系统",{"key":31,"text":576,"correct":22},"国务院建设行政管理系统、企事业单位管理系统、行业协会管理系统",[578,581,584,587,590,593],{"id":15,"name":579,"category":7,"favorite":580},"领导干部任职前廉政法规知识测试题",92,{"id":582,"name":583,"category":7,"favorite":15},595,"建筑结构与设备",{"id":585,"name":586,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":588,"name":589,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":591,"name":592,"category":7,"favorite":8},534,"BIM工程师",{"id":594,"name":592,"category":7,"favorite":8},535]